API specifications: Difference between revisions

From NFVwiki
No edit summary
No edit summary
Line 27: Line 27:


VNF Configuration interface (as produced by the VNF towards the VNFM)
VNF Configuration interface (as produced by the VNF towards the VNFM)
This specification fulfills the requirements specified in [http://www.etsi.org/deliver/etsi_gs/NFV-IFA/001_099/008/02.01.01_60/gs_NFV-IFA008v020101p.pdf ETSI GS NFV-IFA 008]


  | [https://docbox.etsi.org/ISG/NFV/Open/Drafts/SOL002_Ve-Vnfm_protocols Draft]
  | [https://docbox.etsi.org/ISG/NFV/Open/Drafts/SOL002_Ve-Vnfm_protocols Draft]
Line 47: Line 49:


Virtualised Resources Quota Available Notification interface (as produced by the NFVO towards the VNFM).
Virtualised Resources Quota Available Notification interface (as produced by the NFVO towards the VNFM).
This specification fulfills the requirements specified in [http://www.etsi.org/deliver/etsi_gs/NFV-IFA/001_099/007/02.01.01_60/gs_NFV-IFA007v020101p.pdf ETSI GS NFV-IFA 007]


  | [http://www.etsi.org/deliver/etsi_gs/NFV-SOL/001_099/003/02.03.01_60/gs_NFV-SOL003v020301p.pdf Published specification]
  | [http://www.etsi.org/deliver/etsi_gs/NFV-SOL/001_099/003/02.03.01_60/gs_NFV-SOL003v020301p.pdf Published specification]
Line 63: Line 67:


VNF Package Management interface (as produced by the NFVO towards the OSS/BSS)
VNF Package Management interface (as produced by the NFVO towards the OSS/BSS)
This specification fulfills the requirements specified in [http://www.etsi.org/deliver/etsi_gs/NFV-IFA/001_099/013/02.01.01_60/gs_NFV-IFA013v020101p.pdf ETSI GS NFV-IFA 013]


  | [https://docbox.etsi.org/ISG/NFV/Open/Drafts/SOL005_Os-Ma-nfvo_APIs Draft]
  | [https://docbox.etsi.org/ISG/NFV/Open/Drafts/SOL005_Os-Ma-nfvo_APIs Draft]

Revision as of 19:13, 1 August 2017

API conventions


API specifications

APIs exposed on MANO reference points
APIs Release v2.3.1/Draft Swagger Bug Tracker
Ve-Vnfm

VNF Lifecycle Management interface (as produced by the VNFM towards the EM/VNF)

VNF Performance Management interface (as produced by the VNFM towards the EM)

VNF Fault Management interface (as produced by the VNFM towards the EM)

VNF Indicator interface (as produced by the EM/VNF towards the VNFM)

VNF Configuration interface (as produced by the VNF towards the VNFM)

This specification fulfills the requirements specified in ETSI GS NFV-IFA 008

Draft Work In Progress Work In Progress
Or-Vnfm

VNF Lifecycle Management interface (as produced by the VNFM towards the NFVO).

VNF Performance Management interface (as produced by the VNFM towards the NFVO).

VNF Fault Management interface (as produced by the VNFM towards the NFVO).

VNF Indicator interface (as produced by the VNFM towards the NFVO).

VNF Lifecycle Operation Granting interface (as produced by the NFVO towards the VNFM).

VNF Package Management interface (as produced by the NFVO towards the VNFM).

Virtualised Resources Quota Available Notification interface (as produced by the NFVO towards the VNFM).

This specification fulfills the requirements specified in ETSI GS NFV-IFA 007

Published specification Work In Progress Work In Progress
Os-Ma-Nfvo

NSD Management interface (as produced by the NFVO towards the OSS/BSS)

NS Lifecycle Management interface (as produced by the NFVO towards the OSS/BSS)

NS Performance Management interface (as produced by the NFVO towards the OSS/BSS)

NS Fault Management interface (as produced by the NFVO towards the OSS/BSS)

VNF Package Management interface (as produced by the NFVO towards the OSS/BSS)

This specification fulfills the requirements specified in ETSI GS NFV-IFA 013

Draft Work In Progress Work In Progress

Tutorials

Links to tutorials and webinars


Link

Return to NFV Solutions page

Return to ETSI ISG NFV page