Feature Tracking

From NFVwiki
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Introduction

Current mirror date: 2024.02.14 This page is a mirror of the Feature Tracking page on the NFV private wiki. Feature tracking information is frequently updated on the private wiki page and regularly mirrored onto the present public page.
Links to contributions will require authentication with an ETSI Online Account.

Feature Overview

This page has been restructured to separate pages for each release.

Release 5 features wiki.

Release 4 features wiki.
Feature work of Release 4 is completed and the release has entered maintenance mode.
The Release 3 feature wiki is not further maintained.
Please refer to the latest draft of the release description NFV007:
ETSI GR NFV 007: "Network Functions Virtualisation (NFV); Release Description; Release 4".
It can be downloaded here.

Release 3 features wiki.
Release 3 is completed.
The Release 3 feature wiki is not further maintained.
Please refer to the release description NFV007:
ETSI GR NFV 007 (V3.7.1): "Network Functions Virtualisation (NFV); Release Description; Release 3".
It can be downloaded here

The old wiki page (status of September 29, 2023) can still be accessd here.

Feature Overview and Status
Id Feature Release and Status
FEAT01 NFV-MANO Upgrades Stage 1 Completed Release 4
FEAT02 VNF software modification Completed Release 3
FEAT03 NFVI software modification Completed Release 3
FEAT04 Host Reservation Partially completed Release 3
Completed Release 4
FEAT05 Network Slicing Completed Release 3
FEAT06 Enhancement Network Service (NS) Package Part of Release 2
FEAT07 MANO Policy Management (MANO_PLC) Completed Release 3
FEAT08 Support of composite NS across multi-domain (MANOMD_NS) Completed Release 3
FEAT10 Mgmt & Connectivity Multi-Site Services (MCMSS) Partially completed Release 3
Completed Release 4
FEAT11 NFV_M&M (NFV-MANO management) Completed Release 3
FEAT12 Enhancement support for MEC in NFV deployments Completed Release 3.
FEAT13 Licensing Completed Release 4
FEAT15 VNF Snapshotting Completed Release 3
FEAT16 Service Availability Level Completed Release 3
FEAT17 Cloud-Native VNFs and Container Infrastructure management Stage 1 completed Release 3
Stage 2&3 completed Release 4
FEAT18 Security Stage 2 architecture completed Release 3
Stage 2 interfaces completed Release 4,
FEAT19a NFV-Connect - container networking Partly completed Release 4
Ongoing Release 5
FEAT19b FEAT19b: NFV-Connect - connectivity integration and operationalization Ongoing Release 5
FEAT20 Auto Partly completed Release 4
Ongoing Release 5
FEAT21 5GNFV Partly completed Release 4
Ongoing Release 5
FEAT22 FEAT22: M-Tenant Stage 1 ongoing Release 5
FEAT23 MANO-SBA Ongoing Release 5
FEAT24 VNF-OAM Completed Release 4
Ongoing Release 5
FEAT25 FEAT25: VNF-CI Ongoing Release 5
FEAT26 Policy-models Partly completed Release 4
Ongoing Release 5
FEAT27 NFV for vRAN Ongoing Release 5
FEAT28 Fault management models Stage 2 completed Release 4
Ongoing Release 5
FEAT29 Green NFV Ongoing Release 5
FEAT30 VNF configuration Ongoing Release 5
FEAT31 Flexible VNF deployment Ongoing Release 5
FEAT32 Reliability for cloud-native VNF Ongoing Release 5
FEAT33 Physical Infrastructure Management (PIM) Ongoing Release 5
FEAT35 Follow-up from IFA051 Open Source Analysis (Tentative) Ongoing Release 5
FEAT36 New infrastructure resources for NFV Stage 1 started Release 6
FEAT37 Latency aspects and new communication technologies for NFV Stage 1 started Release 6
FEAT38 New application virtualization forms Stage 1 started Release 6
FEAT39 Report on architectural support for NFV evolution Stage 1 pre-analysis Release 6
ENH01.01 Certificate Management Partially completed Release 4
Ongoing Release 5
ENH02 Special technical enhancements 6 Release 4 enhancements completed
None yet in Release 5

Introduction

Some introduction will be put here including guidelines, process description and tutorials.

  • Link to Release 3 implementation process
    • Link to the "consolidated IFA Release 3 Feature plan". Refer to NFVIFA(17)000914 and revisions. Latest version NFVIFA(17)000914r4
  • Training for Feature Primes
    • Process
    • Wiki editing
  • Naming conventions: e.g. FEAT00_IFA007_[Contribution name]
  • To build a link to all contributions belonging to a feature, replace FEAT99 in the link stated below with the Feature short name for your feature e.g. FEAT15:
 https://portal.etsi.org/Contribution.aspx?Tb_Id=789&searchText=FEAT99&IncludeSubTb=True&sort=pk_contribution&sortorder=DESC&NbItemsPerPage=50&Year=2017,2018,2019
  • Note: Agreed content can be added to Pseudo meeting --> If the access is restricted, this may only work within a workgroup.
  • Related/Dependent Features: Please indicate other features which relate to the ongoing work. Details can be given in the implementation plan or in the issues section.
ETSI NFV Feature Tracking Wiki cropped.png

FEATxx: Feature Title

Overview

Feature Prime Name, Company, E-Mail
Feature description Short Description of the Feature
Target Release Stage 2: Release 3 (2018-X-X)

Stage 3: Release 3 (2019-X-X)

Impacted WIs Stage 2: IFAxx, IFAyy, SOLzz

Stage 3: SOLzz

MegaCRs Stage 2:

IFAxxx MegaCR NFVIFA(18)000xxx (CR Status) IFAyyy MegaCR NFVIFA(18)000yyy (CR Status)

Stage 3:

SOLzzz MegaCR NFVSOL(19)000zzz (CR Status)

Related/Dependent Features FEATxx
FEATyy
New Specifcations Stage 2: none

Stage 3: SOLaaa

Status Stage 2: Completed

Stage 3: Ongoing (20% completed)

Contributions All feature contributions
Agreed content
Feature team Stage 2: Name (Company)

Stage 3: Name (Company)

Last Updated 20xx-xx-xx

Stage 2 Implementation Plan

Items to consider in the implementation plan

  • Detailed description what has to be done in which work item.
  • Timeplan of when the team plans to conclude a particular action in the implementation plan.

IFA

ID Action Impacted WG(s) Target completion Status
001 Add interface X in to IFA007. CR draft [LINK] IFA March-2018 Open

SOL

ID Action Impacted WG(s) Target completion Status
001 Add interface X in to SOL001. CR draft [LINK] SOL March-2018 Open

Stage 3 Implementation Plan

Items to consider in the implementation plan

  • Detailed description what has to be done in which work item.
  • Timeplan of when the team plans to conclude a particular action in the implementation plan.

SOL

ID Action Impacted WG(s) Target completion Status
001 Add interface X in to SOL001. CR draft [LINK] SOL March-2018 Open

Issues

List of issues raised based on the feature implementation.

Security Considerations

List of security considerations implied by the feature.

Conclusion

The sections for all features are distributed to the release specific pages:

Please access Release 3 features here.

Please access Release 4 features here.

Please access Release 5 features here.


The old wiki page (status of September 29, 2023) ist saved for reference here.