Difference between revisions of "Full ISO 7-layer stack fulfilment, activation and orchestration of VNFs in carrier networks"

From NFVwiki
Jump to: navigation, search
(PoC Demo)
(PoC Demo)
Line 16: Line 16:
 
The PoC network environment will be hosted and presented at Telstra Integration Laboratory, 45 Barry Street Carlton, Victoria.
 
The PoC network environment will be hosted and presented at Telstra Integration Laboratory, 45 Barry Street Carlton, Victoria.
  
NFV POC ZONE 2016 - dusseldorf
+
NFV POC ZONE 2016 - Dusseldorf
  
 
== PoC Proposal ==
 
== PoC Proposal ==

Revision as of 21:11, 27 October 2015

PoC Team

Telstra

Hewlett-Packard

Alcatel Lucent

F5 Networks

Main Contact

Higgs, Jeff Higgs, HP jeff.higgs@hp.com

Marie-Paule Odini, HP marie-paule.odini@hp.com

PoC Demo

The PoC network environment will be hosted and presented at Telstra Integration Laboratory, 45 Barry Street Carlton, Victoria.

NFV POC ZONE 2016 - Dusseldorf

PoC Proposal

NFV(15)000074r3_NFV_ISG_PoC_Proposal_-_ISO_7-layer_stack_fulfillment__activa.docx

Hot Topics

This PoC is WORKING on Hot Topics: