Full ISO 7-layer stack fulfilment, activation and orchestration of VNFs in carrier networks: Difference between revisions
Line 22: | Line 22: | ||
== Hot Topics == | == Hot Topics == | ||
This | This PoC is <span style="color:red;">'''WORKING on Hot Topics: </span> | ||
*[[Hot Topics|HT#1 (EVE) Use of SDN in NFV architecture]] ''' | *[[Hot Topics|HT#1 (EVE) Use of SDN in NFV architecture]] ''' | ||
*[[Hot Topics|HT#2 (TST) Test Methodology for NFV]] ''' | *[[Hot Topics|HT#2 (TST) Test Methodology for NFV]] ''' | ||
*[[Hot Topics|HT#3 (REL) End-to-End Fault Correlation]] ''' | *[[Hot Topics|HT#3 (REL) End-to-End Fault Correlation]] ''' |
Revision as of 10:18, 8 July 2015
PoC Team
Telstra
Hewlett-Packard
Alcatel Lucent
F5 Networks
Main Contact
Higgs, Jeff Higgs, HP jeff.higgs@hp.com
Marie-Paule Odini, HP marie-paule.odini@hp.com
PoC Demo
The PoC network environment will be hosted and presented at Telstra Integration Laboratory, 45 Barry Street Carlton, Victoria.
Another public venue is being investigated by the team and will be shared shortly.
PoC Proposal
NFV(15)000074r3_NFV_ISG_PoC_Proposal_-_ISO_7-layer_stack_fulfillment__activa.docx
Hot Topics
This PoC is WORKING on Hot Topics: