Full ISO 7-layer stack fulfilment, activation and orchestration of VNFs in carrier networks: Difference between revisions

From NFVwiki
No edit summary
Line 26: Line 26:
*[[Hot Topics|HT#2 (TST) Test Methodology for NFV]] '''  
*[[Hot Topics|HT#2 (TST) Test Methodology for NFV]] '''  
*[[Hot Topics|HT#3 (REL) End-to-End Fault Correlation]] '''
*[[Hot Topics|HT#3 (REL) End-to-End Fault Correlation]] '''
== PoC Report ==
Final PoC Report (09/032016): [https://docbox.etsi.org/ISG/NFV/TST/05-CONTRIBUTIONS/2016/NFVTST%2816%29000036_Final_Report_for_POC_38.zip NFVTST%2816%29000036_Final_Report_for_POC_38.zip]

Revision as of 15:18, 9 March 2016

PoC Team

Telstra

Hewlett-Packard

Alcatel Lucent

F5 Networks

Main Contact

Higgs, Jeff Higgs, HP jeff.higgs@hp.com

Marie-Paule Odini, HP marie-paule.odini@hp.com

PoC Demo

The PoC network environment will be hosted and presented at Telstra Integration Laboratory, 45 Barry Street Carlton, Victoria.

NFV POC ZONE 2016 - Dusseldorf - October 2015

PoC Proposal

NFV(15)000074r3_NFV_ISG_PoC_Proposal_-_ISO_7-layer_stack_fulfillment__activa.docx

Hot Topics

This PoC is WORKING on Hot Topics:

PoC Report

Final PoC Report (09/032016): NFVTST%2816%29000036_Final_Report_for_POC_38.zip