Full ISO 7-layer stack fulfilment, activation and orchestration of VNFs in carrier networks: Difference between revisions
No edit summary |
|||
Line 26: | Line 26: | ||
*[[Hot Topics|HT#2 (TST) Test Methodology for NFV]] ''' | *[[Hot Topics|HT#2 (TST) Test Methodology for NFV]] ''' | ||
*[[Hot Topics|HT#3 (REL) End-to-End Fault Correlation]] ''' | *[[Hot Topics|HT#3 (REL) End-to-End Fault Correlation]] ''' | ||
== PoC Report == | |||
Final PoC Report (09/032016): [https://docbox.etsi.org/ISG/NFV/TST/05-CONTRIBUTIONS/2016/NFVTST%2816%29000036_Final_Report_for_POC_38.zip NFVTST%2816%29000036_Final_Report_for_POC_38.zip] |
Revision as of 15:18, 9 March 2016
PoC Team
Telstra
Hewlett-Packard
Alcatel Lucent
F5 Networks
Main Contact
Higgs, Jeff Higgs, HP jeff.higgs@hp.com
Marie-Paule Odini, HP marie-paule.odini@hp.com
PoC Demo
The PoC network environment will be hosted and presented at Telstra Integration Laboratory, 45 Barry Street Carlton, Victoria.
NFV POC ZONE 2016 - Dusseldorf - October 2015
PoC Proposal
NFV(15)000074r3_NFV_ISG_PoC_Proposal_-_ISO_7-layer_stack_fulfillment__activa.docx
Hot Topics
This PoC is WORKING on Hot Topics:
- HT#1 (EVE) Use of SDN in NFV architecture
- HT#2 (TST) Test Methodology for NFV
- HT#3 (REL) End-to-End Fault Correlation
PoC Report
Final PoC Report (09/032016): NFVTST%2816%29000036_Final_Report_for_POC_38.zip