Hot Topics: Difference between revisions

From NFVwiki
Line 14: Line 14:
{| class="wikitable"
{| class="wikitable"
! Hot Topic #
! Hot Topic #
! Hot Topic Title
! Hot Topic
! Status
! Status
! WG(s)
! WG(s)
Line 20: Line 20:
! Deadline
! Deadline
! PoC Feedback Template(s)
! PoC Feedback Template(s)
! Hot Topic Description
! Addressed by PoC(s)
! Addressed by PoC(s)
|-
|-
| '''HT#1'''
| '''HT#1'''
| '''Use of SDN in NFV Architecture'''
| [https://docbox.etsi.org/ISG/NFV/EVE/05-CONTRIBUTIONS/2015//NFVEVE(15)000213r1_SDN-NFV_Hot_Topic.zip HT#1 (EVE) Use of SDN in NFV architecture]
| <span style="color:green;">'''Active'''</span>
| <span style="color:green;">'''Active'''</span>
| EVE
| EVE
Line 30: Line 29:
| Q2 2015
| Q2 2015
| [https://docbox.etsi.org/ISG/NFV/EVE/05-CONTRIBUTIONS/2015//NFVEVE(15)000213r1_SDN-NFV_Hot_Topic.zip HT#1 PoC FB Template]
| [https://docbox.etsi.org/ISG/NFV/EVE/05-CONTRIBUTIONS/2015//NFVEVE(15)000213r1_SDN-NFV_Hot_Topic.zip HT#1 PoC FB Template]
| [https://docbox.etsi.org/ISG/NFV/EVE/05-CONTRIBUTIONS/2015//NFVEVE(15)000213r1_SDN-NFV_Hot_Topic.zip HT#1 (EVE) Use of SDN in NFV architecture]
| [[Full_ISO_7-layer_stack_fulfilment,_activation_and_orchestration_of_VNFs_in_carrier_networks|PoC#38]]
| [[Full_ISO_7-layer_stack_fulfilment,_activation_and_orchestration_of_VNFs_in_carrier_networks|PoC#38]]
|-
|-
| '''HT#2'''
| '''HT#2'''
| '''Test Methodology for NFV'''
| [https://docbox.etsi.org/ISG/NFV/TST/05-CONTRIBUTIONS/2015//NFVTST(15)000084r4_Hot_topic__Testing_in_NFV_POC.zip HT#2 (TST) Test Methodology for NFV]
| <span style="color:green;">'''Active'''</span>
| <span style="color:green;">'''Active'''</span>
| TST
| TST
Line 40: Line 38:
| Q3 2015
| Q3 2015
| [https://docbox.etsi.org/ISG/NFV/TST/05-CONTRIBUTIONS/2015//NFVTST(15)000084r4_Hot_topic__Testing_in_NFV_POC.zip HT#2 PoC FB Template]
| [https://docbox.etsi.org/ISG/NFV/TST/05-CONTRIBUTIONS/2015//NFVTST(15)000084r4_Hot_topic__Testing_in_NFV_POC.zip HT#2 PoC FB Template]
| [https://docbox.etsi.org/ISG/NFV/TST/05-CONTRIBUTIONS/2015//NFVTST(15)000084r4_Hot_topic__Testing_in_NFV_POC.zip HT#2 (TST) Test Methodology for NFV]
|  
|  
|-
|-
| '''HT#3'''
| '''HT#3'''
| '''End-to-End Fault Correlation'''
| [https://docbox.etsi.org/ISG/NFV/REL/05-CONTRIBUTIONS/2015//NFVREL(15)000083_REL_Hot_Topic.docx HT#3 (REL) End-to-End Fault Correlation]
| <span style="color:green;">'''Active'''</span>
| <span style="color:green;">'''Active'''</span>
| REL
| REL
Line 50: Line 47:
|  
|  
|  
|  
| [https://docbox.etsi.org/ISG/NFV/REL/05-CONTRIBUTIONS/2015//NFVREL(15)000083_REL_Hot_Topic.docx HT#3 (REL) End-to-End Fault Correlation]
|  
|  
|-
|-
| '''HT#4'''
| '''HT#4'''
| '''Lawful Interception'''
| [https://docbox.etsi.org/ISG/NFV/TSC/05-CONTRIBUTIONS/2015//NFVTSC(15)000043_SEC_WG_Hot_Topic__Lawful_Interception.docx HT#4 (SEC) Lawful Interception]
| <span style="color:green;">'''Active'''</span>
| <span style="color:green;">'''Active'''</span>
| SEC
| SEC
Line 60: Line 56:
| Q2 2016
| Q2 2016
|  
|  
| [https://docbox.etsi.org/ISG/NFV/TSC/05-CONTRIBUTIONS/2015//NFVTSC(15)000043_SEC_WG_Hot_Topic__Lawful_Interception.docx HT#4 (SEC) Lawful Interception]
|  
|  
|}
|}

Revision as of 08:21, 18 June 2015

Rationale

The NFV HoT Topics concept has been created to complement the NFV PoC Framework with the following aspects:

• Improve the connection of NFV ISG specs with practical implementations in general and proofs of concept (PoCs) in particular.

• Enhance the relevance of PoC contributions to ISG NFV objectives and deliverables.

• Identify common concerns of different NFV ISG Working groups and focus on insights that might be useful to move forward.

NFV Hot Topics are identified, documented and consolidated by the ISG NFV Working Groups. Learn more about NFV Hot Topics

Current Hot Topics

Hot Topic # Hot Topic Status WG(s) WI(s) Deadline PoC Feedback Template(s) Addressed by PoC(s)
HT#1 HT#1 (EVE) Use of SDN in NFV architecture Active EVE EVE005 Q2 2015 HT#1 PoC FB Template PoC#38
HT#2 HT#2 (TST) Test Methodology for NFV Active TST TST001, TST002 Q3 2015 HT#2 PoC FB Template
HT#3 HT#3 (REL) End-to-End Fault Correlation Active REL REL004
HT#4 HT#4 (SEC) Lawful Interception Active SEC SEC004, SEC009 Q2 2016

Addressing a Hot Topic in a PoC

1. PoC teams interested in addressing a given hot topic will explicitly reflect it in their PoC Proposal (Section 2.5 – Expected PoC Contribution) by:

• Mentioning the Hot Topic that they want to address

• Committing in the PoC proposal to provide the information requested in the Hot Topic description

• Committing in the PoC proposal to notify the concerned WIs once the expected results are available in the form of a contribution (no need to wait until the final PoC Report is available). Some Hot Topics may provide a template to be filled in as part of this contribution.

• In case a PoC addresses more than one Hot Topic, the above procedure will apply for each of them.

2. The PoC Proposal will follow the regular procedure described in the PoC Framework for its acceptance. During the formal review of the PoC Proposal it will also be checked whether the information requested by the Hot Topic is effectively committed in the PoC Proposal. Once accepted, the PoC will be marked in the wiki as “WORKING on Hot Topic”.

3. On-going PoC Projects can also commit to address a Hot Topic and provide the requested information by submitting a revision of their PoC Proposal according to the above.

PoC Proposal Template (word)

Feeding back the results

1. Once experimental results relevant for a given Hot Topic are available, the PoC Team will be in charge of creating a contribution and informing the affected WI (or WIs) and their WGs (if the Hot Topic had a specific template for feedback contributions, it should be used).

2. The WI/WG might require further clarifications to the PoC team until the PoC feedback is considered formally complete and useful for the targeted WI GS.

2. Once the PoC feedback has been completed by the concerned WG/WI, the PoC will be marked in the wiki as “CONTRIBUTOR to Hot Topic”.