Multi-vendor Distributed NFV: Difference between revisions

From NFVwiki
No edit summary
No edit summary
 
(12 intermediate revisions by the same user not shown)
Line 14: Line 14:


== PoC Demo ==
== PoC Demo ==
Network Virtualization and SDN World, 27-30 May 2014, London ([http://sdnworldevent.com/ http://sdnworldevent.com])
Big Telecom Event, June 17-18, 2014, Chicago ([http://www.bigtelecomevent.com http://www.bigtelecomevent.com]). See picture [[Media:PoC4-BTE.jpg|here]].


OpenStack Summit, 12-16 May 2014, Atlanta, US ([http://www.openstack.org/summit/openstack http://www.openstack.org/summit/openstack])
'''[http://www.etsi.org/nfv-poc-zone ETSI NFV PoC ZONE @ SDN & OpenFlow World Congress], 14-17 October 2014, Düsseldorf'''


== PoC Proposal ==
== PoC Proposal ==
[http://docbox.etsi.org/ISG/NFV/PER/05-CONTRIBUTIONS/2014/NFVPER(14)000011__NFV_ISG_PoC_Proposal__-_Multi-vendor_Distributed_NFV.docx NFVPER(14)000011__NFV_ISG_PoC_Proposal__-_Multi-vendor_Distributed_NFV.docx]
Original proposal: [http://docbox.etsi.org/ISG/NFV/Closed_WGs/PER/05-CONTRIBUTIONS/2014/NFVPER(14)000011__NFV_ISG_PoC_Proposal__-_Multi-vendor_Distributed_NFV.docx NFVPER(14)000011__NFV_ISG_PoC_Proposal__-_Multi-vendor_Distributed_NFV.docx]
 
Latest Update (10 September 2014): [http://docbox.etsi.org/ISG/NFV/Closed_WGs/PER/05-CONTRIBUTIONS/2014//NFVPER(14)000011r1__NFV_ISG_PoC_Proposal__-_Multi-vendor_Distributed_NFV.docx NFVPER(14)000011r1__NFV_ISG_PoC_Proposal__-_Multi-vendor_Distributed_NFV.docx]


[[media:NFVPER(14)000011__NFV_ISG_PoC_Proposal__-_Multi-vendor_Distributed_NFV.pdf |Download PDF version]]
[[media:NFVPER(14)000011__NFV_ISG_PoC_Proposal__-_Multi-vendor_Distributed_NFV.pdf |Download PDF version]]


== PoC Interim Report (10 September 2014) ==
== PoC Report ==
[http://docbox.etsi.org/ISG/NFV/PER/05-CONTRIBUTIONS/2014//NFVPER(14)000099__NFV_ISG_PoC_Report_-_Multi-vendor_Distributed_NFV.docx NFVPER(14)000099__NFV_ISG_PoC_Report_-_Multi-vendor_Distributed_NFV.docx]
PoC Report (10 September 2014): [http://docbox.etsi.org/ISG/NFV/Closed_WGs/PER/05-CONTRIBUTIONS/2014//NFVPER(14)000099__NFV_ISG_PoC_Report_-_Multi-vendor_Distributed_NFV.docx NFVPER(14)000099__NFV_ISG_PoC_Report_-_Multi-vendor_Distributed_NFV.docx]

Latest revision as of 15:28, 14 January 2015

PoC Team

CenturyLink

Certes

Cyan

Fortinet

RAD

Main Contact

Nirav J. Modi, Cyan Inc nirav.modi@cyaninc.com

PoC Demo

Big Telecom Event, June 17-18, 2014, Chicago (http://www.bigtelecomevent.com). See picture here.

ETSI NFV PoC ZONE @ SDN & OpenFlow World Congress, 14-17 October 2014, Düsseldorf

PoC Proposal

Original proposal: NFVPER(14)000011__NFV_ISG_PoC_Proposal__-_Multi-vendor_Distributed_NFV.docx

Latest Update (10 September 2014): NFVPER(14)000011r1__NFV_ISG_PoC_Proposal__-_Multi-vendor_Distributed_NFV.docx

Download PDF version

PoC Report

PoC Report (10 September 2014): NFVPER(14)000099__NFV_ISG_PoC_Report_-_Multi-vendor_Distributed_NFV.docx