Operational Efficiency in NFV Capacity Planning, Provisioning and Billing: Difference between revisions

From NFVwiki
No edit summary
 
Line 16: Line 16:


== PoC Withdrawn ==
== PoC Withdrawn ==
This PoC Proposal was withdrawn due to changes in the PoC Team
This PoC Proposal was withdrawn on 22/01/2016 due to changes in the PoC Team

Latest revision as of 12:58, 15 February 2016

PoC Team

BT

MetraTech Corp

Huawei

Main Contact

Sean Chen, Huawei s.chen@HUAWEI.COM

PoC Demo

Huawei NFV lab, Santa Clara (CA), USA

PoC Proposal

NFVPER(14)000061r2___NFV_ISG_PoC_Proposal__Operational_Efficiency_in_NFV_Capaci.docx

PoC Withdrawn

This PoC Proposal was withdrawn on 22/01/2016 due to changes in the PoC Team