PoC Framework: Difference between revisions

From NFVwiki
(24 intermediate revisions by the same user not shown)
Line 6: Line 6:
[http://www.etsi.org/technologies-clusters/technologies/nfv/nfv-poc Learn more about NFV ISG PoCs]
[http://www.etsi.org/technologies-clusters/technologies/nfv/nfv-poc Learn more about NFV ISG PoCs]


= Framework Document =
== PoC Framework Document ==
The PoC Framework document can be downloaded at [http://www.etsi.org/deliver/etsi_gs/NFV-PER/001_099/002/01.01.01_60/gs_NFV-PER002v010101p.pdf NFV-PER 002].
The PoC Framework document can be downloaded at: [http://www.etsi.org/deliver/etsi_gs/NFV-PER/001_099/002/01.01.02_60/gs_NFV-PER002v010102p.pdf NFV-PER002-PoC Framework].


This document includes the templates for PoC Proposals and PoC Reports.
Templates for PoC Proposals and PoC Reports are in the Annex clauses. For convenience word versions of the templates are available hereafter.
 
== Templates ==
 
[[Media:PoC_proposal_template.doc | PoC Proposal Template (word)]]
 
[[Media:PoC_report_template.doc | PoC Report Template (word)]]
 
== Hot Topics ==
The NFV ISG builds and maintains a list of '''HOT Topics for which very specific feedback is requested from the PoC Projects''', learn more at [[Hot Topics]]


= ETSI CTI Support =
= ETSI CTI Support =

Revision as of 14:48, 8 December 2015

NFV ISG PoCs

NFV ISG has developed an NFV PoC Framework to coordinate and promote multi-vendor Proofs of Concept illustrating key aspects of NFV ISG work.

Learn more about NFV ISG PoCs

PoC Framework Document

The PoC Framework document can be downloaded at: NFV-PER002-PoC Framework.

Templates for PoC Proposals and PoC Reports are in the Annex clauses. For convenience word versions of the templates are available hereafter.

Templates

PoC Proposal Template (word)

PoC Report Template (word)

Hot Topics

The NFV ISG builds and maintains a list of HOT Topics for which very specific feedback is requested from the PoC Projects, learn more at Hot Topics

ETSI CTI Support

The ETSI Center for Testing and Interoperability (CTI) has experience in supporting the organization of technology evaluations and interoperability events (in many ways similar to PoCs).

This experience may be useful to assist the PoC teams with test expertise, administration and project management support.

NFV ISG PoC Teams may request CTI assistance by contacting ETSI CTI.

About NFV ISG

Learn more about NFV at ETSI