PoC Framework: Difference between revisions

From NFVwiki
(12 intermediate revisions by the same user not shown)
Line 6: Line 6:
[http://www.etsi.org/technologies-clusters/technologies/nfv/nfv-poc Learn more about NFV ISG PoCs]
[http://www.etsi.org/technologies-clusters/technologies/nfv/nfv-poc Learn more about NFV ISG PoCs]


= Framework Document =
== PoC Framework Document ==
The PoC Framework document can be downloaded at:
The PoC Framework document can be downloaded at: [http://www.etsi.org/deliver/etsi_gs/NFV-PER/001_099/002/01.01.02_60/gs_NFV-PER002v010102p.pdf NFV-PER002-PoC Framework].


[http://www.etsi.org/deliver/etsi_gs/NFV-PER/001_099/002/01.01.01_60/gs_NFV-PER002v010101p.pdf NFV-PER002-PoC Framework - pdf version].
Templates for PoC Proposals and PoC Reports are in the Annex clauses. For convenience word versions of the templates are available hereafter.


[http://webapp.etsi.org/exchangefolder/gs_NFV-PER002v010101p.zip NFV-PER002-PoC Framework - Word version].
== Templates ==


You'll find the templates for PoC Proposals and PoC Reports at the end of those documents.
[[Media:PoC_proposal_template.doc | PoC Proposal Template (word)]]


= Q&A =
[[Media:PoC_report_template.doc | PoC Report Template (word)]]
See below some usual questions about the NFV ISG PoCs:


'''I would like to submit a POC proposal where can I find a Word version of the template?'''
== Hot Topics ==
You can find a link to the word version of the PoC Framework (including the templates) at:
The NFV ISG builds and maintains a list of '''HOT Topics for which very specific feedback is requested from the PoC Projects''', learn more at [[Hot Topics]]
[http://webapp.etsi.org/exchangefolder/gs_NFV-PER002v010101p.zip NFV-PER002-PoC Framework - Word version] 
 
'''Do all of the POC participants have to be NFV ISG participants?'''
No, it is only required that (at least) one of the supporting Network Operators or Service Providers
is member of the NFV ISG. See Section 4.5 of the PoC Framework:
 
''“4.5 NFV ISG PoC Proposal Acceptance Criteria ''
''The criteria for acceptance of NFV ISG PoC Proposals are: ''
''1) The NFV ISG PoC Proposal shall contain the information requested in the format of the NFV ISG PoC''
''Proposal Template of clause A.1. ''
''2) The organizations participating in an PoC Project shall include at least two Manufacturers and at''
''least one Network Operator or one Service Provider, where at least the one Network Operator or the one  ''
''Service Provider shall be a member of the NFV ISG (refer clause A.1.1). “''
 
'''Where do I send the completed proposal?'''
Once your proposal completed, you need to:
1) upload it to the ETSI portal as a regular contribution
2) send an email to NFV_POC@LIST.ETSI.ORG with [NFV ISG PoC Proposal] in the subject line and a link to
the uploaded contribution included in the body. To be able to post your email, you will need to subscribe
to that list if not already done. See section 4.3 of the PoC Framework:
''“4.3 NFV ISG PoC Proposal Submission
''PoC Team formation is beyond the scope of the NFV ISG. The PoC Team shall prepare an NFV ISG PoC Proposal ''
''according to the NFV ISG PoC Proposal template in clause A.1. The PoC Proposal shall be submitted to the''
''ISG as a contribution uploaded on the ETSI Portal and a link to the contribution shall be sent to the ''
''dedicated e-mail distribution list ‘NFV_POC@LIST.ETSI.ORG' with [NFV ISG PoC Proposal] in the subject ''
''line.”''


= ETSI CTI Support =
= ETSI CTI Support =

Revision as of 14:48, 8 December 2015

NFV ISG PoCs

NFV ISG has developed an NFV PoC Framework to coordinate and promote multi-vendor Proofs of Concept illustrating key aspects of NFV ISG work.

Learn more about NFV ISG PoCs

PoC Framework Document

The PoC Framework document can be downloaded at: NFV-PER002-PoC Framework.

Templates for PoC Proposals and PoC Reports are in the Annex clauses. For convenience word versions of the templates are available hereafter.

Templates

PoC Proposal Template (word)

PoC Report Template (word)

Hot Topics

The NFV ISG builds and maintains a list of HOT Topics for which very specific feedback is requested from the PoC Projects, learn more at Hot Topics

ETSI CTI Support

The ETSI Center for Testing and Interoperability (CTI) has experience in supporting the organization of technology evaluations and interoperability events (in many ways similar to PoCs).

This experience may be useful to assist the PoC teams with test expertise, administration and project management support.

NFV ISG PoC Teams may request CTI assistance by contacting ETSI CTI.

About NFV ISG

Learn more about NFV at ETSI