Virtual Function State Migration and Interoperability: Difference between revisions

From NFVwiki
(Created page with "== PoC Team == AT&T BT Broadcom Corporation Tieto Corporation == Main Contact == Paul Runcy, Broadcom [mailto:pruncy@broadcom.com pruncy@broadcom.com] == PoC Proposal ...")
 
No edit summary
Line 10: Line 10:
== Main Contact ==  
== Main Contact ==  
Paul Runcy, Broadcom [mailto:pruncy@broadcom.com pruncy@broadcom.com]
Paul Runcy, Broadcom [mailto:pruncy@broadcom.com pruncy@broadcom.com]
== PoC Demo ==
Mobile World Congress 2014, in Barcelona, Spain on February 24-27.


== PoC Proposal ==
== PoC Proposal ==
[http://docbox.etsi.org/ISG/NFV/PER/05-CONTRIBUTIONS/2014/NFVPER(14)000007r2__NFV_ISG_PoC_Proposal__-_Virtual_Function_State_Migration_an.docx NFVPER(14)000009_20140131_NFV_ISG_PoC_VNF_Migration_Proposal.docx]
[http://docbox.etsi.org/ISG/NFV/PER/05-CONTRIBUTIONS/2014/NFVPER(14)000007r2__NFV_ISG_PoC_Proposal__-_Virtual_Function_State_Migration_an.docx NFVPER(14)000009_20140131_NFV_ISG_PoC_VNF_Migration_Proposal.docx]

Revision as of 15:34, 14 February 2014

PoC Team

AT&T

BT

Broadcom Corporation

Tieto Corporation

Main Contact

Paul Runcy, Broadcom pruncy@broadcom.com

PoC Demo

Mobile World Congress 2014, in Barcelona, Spain on February 24-27.

PoC Proposal

NFVPER(14)000009_20140131_NFV_ISG_PoC_VNF_Migration_Proposal.docx