Multi-vendor Distributed NFV: Difference between revisions
No edit summary |
No edit summary |
||
Line 25: | Line 25: | ||
[[media:NFVPER(14)000011__NFV_ISG_PoC_Proposal__-_Multi-vendor_Distributed_NFV.pdf |Download PDF version]] | [[media:NFVPER(14)000011__NFV_ISG_PoC_Proposal__-_Multi-vendor_Distributed_NFV.pdf |Download PDF version]] | ||
== PoC Interim Report (10 September 2014) | == PoC Interim Report == | ||
[http://docbox.etsi.org/ISG/NFV/PER/05-CONTRIBUTIONS/2014//NFVPER(14)000099__NFV_ISG_PoC_Report_-_Multi-vendor_Distributed_NFV.docx NFVPER(14)000099__NFV_ISG_PoC_Report_-_Multi-vendor_Distributed_NFV.docx] | (10 September 2014): [http://docbox.etsi.org/ISG/NFV/PER/05-CONTRIBUTIONS/2014//NFVPER(14)000099__NFV_ISG_PoC_Report_-_Multi-vendor_Distributed_NFV.docx NFVPER(14)000099__NFV_ISG_PoC_Report_-_Multi-vendor_Distributed_NFV.docx] |
Revision as of 08:34, 11 September 2014
PoC Team
CenturyLink
Certes
Cyan
Fortinet
RAD
Main Contact
Nirav J. Modi, Cyan Inc nirav.modi@cyaninc.com
PoC Demo
Big Telecom Event, June 17-18, 2014, Chicago (http://www.bigtelecomevent.com). See picture here.
SDN & OpenFlow World Congress, October 14-17, 2014, Düsseldorf (http://www.layer123.com/sdn)
PoC Proposal
Original proposal: NFVPER(14)000011__NFV_ISG_PoC_Proposal__-_Multi-vendor_Distributed_NFV.docx
Latest Update (10 September 2014): NFVPER(14)000011r1__NFV_ISG_PoC_Proposal__-_Multi-vendor_Distributed_NFV.docx
PoC Interim Report
(10 September 2014): NFVPER(14)000099__NFV_ISG_PoC_Report_-_Multi-vendor_Distributed_NFV.docx