HT02 - Test Methodology for NFV: Difference between revisions
(8 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
This Hot Topic has the following goals: | This Hot Topic has the following goals: | ||
* Validate and improve the Test Methodology guidelines and templates being described in | * Validate and improve the Test Methodology guidelines and templates being described in TST002. | ||
* Contribute Interoperability Test Descriptions & guidelines to TST007. | |||
* Compile a collection of examples of the application of such guidelines and templates in the context in NFV PoCs : Systems Under Test configurations, Test Descriptions, etc, | * Compile a collection of examples of the application of such guidelines and templates in the context in NFV PoCs : Systems Under Test configurations, Test Descriptions, etc, | ||
Line 8: | Line 10: | ||
These goals may be met in a PoC whose focus is testing, or as additional goals for a PoC primarily addressing another topic. | These goals may be met in a PoC whose focus is testing, or as additional goals for a PoC primarily addressing another topic. | ||
[https://docbox.etsi.org/ISG/NFV/TST/05-CONTRIBUTIONS/2015//NFVTST(15) | [https://docbox.etsi.org/ISG/NFV/TST/05-CONTRIBUTIONS/2015//NFVTST(15)000084r5_Hot_topic__Test_Methodology_for_NFV.zip HT#2 (TST) Test Methodology for NFV] | ||
= Status = | = Status = | ||
Line 16: | Line 18: | ||
==Points to prove/refute== | ==Points to prove/refute== | ||
• For '''TST002 – Interoperability Test Methodology''' | • For '''TST002 – Interoperability Test Methodology''' | ||
# validate and suggest improvements for the Test Description template (section 4) | # validate and suggest improvements for the Test Description template (section 4) | ||
# identify the functions under test in the context of the PoC | # identify the functions under test in the context of the PoC | ||
# provide the list of interoperability features tested by the PoC, and the impacted entities (see http://nfvprivatewiki.etsi.org/index.php?title=IOP_Methodology) | # provide the list of interoperability features tested by the PoC, and the impacted entities (see analysis in [http://nfvprivatewiki.etsi.org/index.php?title=IOP_Methodology the WIKI]) | ||
# Provide SUT configurations tested by the PoC Team following the guidelines in section 4. Identify the test interfaces (where actions are triggered and observed) | # Provide SUT configurations tested by the PoC Team following the guidelines in section 4. Identify the test interfaces (where actions are triggered and observed) | ||
# provide descriptions (following the Test Description template) of interoperability features successfully tested by the PoC Team in a reproducible way | # provide descriptions (following the Test Description template) of interoperability features successfully tested by the PoC Team in a reproducible way | ||
• For '''TST007 – VIM- VNFM Interoperability Testing Guidelines''' | |||
# validate, suggest improvements and contribute additional Test Descriptions | |||
==Criterion of success== | ==Criterion of success== | ||
• Provide input and concrete examples to at least one of the 2 WIs ( | • Provide input and concrete examples to at least one of the 2 WIs (TST002 or TST007) | ||
== Other information == | == Other information == | ||
Provide feedback to other NFV Working Groups on the items that have been validated by the testing and/or the gaps identified in the specifications. | Provide feedback to other NFV Working Groups on the items that have been validated by the testing and/or the gaps identified in the specifications. | ||
* For '''TST002 - Interoperability Test methodology''' | |||
* For ''' | |||
# SUT configurations (as exercised by the POC) | # SUT configurations (as exercised by the POC) | ||
# | # List of NFV IOP Features tested by the POC project | ||
PoC Teams shall follow the [[Media: | # IOP Test Descriptions (run by the POC, following TD template) | ||
# Lessons learnt and suggestions for improvements in the methodologies | |||
PoC Teams shall follow the [[Media:HT_2_FB_Template_TST002.doc | HT#2-TST002 Feedback Template]] on their contributions to Hot Topic#2 - TST002 | |||
* For ''' | * For '''TST007 - VIM-VNFM Interoperability Testing Guidelines''' | ||
# SUT configurations (as exercised by the POC) | # SUT configurations (as exercised by the POC) | ||
# List of NFV IOP Features tested by the POC project | # List of NFV IOP Features tested by the POC project | ||
# IOP Test Descriptions (run by the POC, following TD template) | # IOP Test Descriptions (run by the POC, following TD template) | ||
# Lessons learnt and suggestions for improvements in the methodologies | # Lessons learnt and suggestions for improvements in the methodologies | ||
PoC Teams shall follow the [[Media: | PoC Teams shall follow the [[Media:HT_2_FB_Template_TST007.doc | HT#2-TST007 Feedback Template]] on their contributions to Hot Topic#2 - TST007 | ||
=Concerned WGs/WI= | =Concerned WGs/WI= | ||
TST WG: | TST WG: | ||
* [http://webapp.etsi.org/WorkProgram/Report_WorkItem.asp?WKI_ID= | * [http://webapp.etsi.org/WorkProgram/Report_WorkItem.asp?WKI_ID=46043 TST002 - Interoperability Test Methodology] - [http://docbox.etsi.org/ISG/NFV/Open/Drafts/TST002_Interoperability_Testing_Methodology/ Latest draft] | ||
* [http://webapp.etsi.org/WorkProgram/Report_WorkItem.asp?WKI_ID= | * [http://webapp.etsi.org/WorkProgram/Report_WorkItem.asp?WKI_ID=49500 TST007 - VIM-VNFM Interoperability Testing Guidelines] - [http://docbox.etsi.org/ISG/NFV/Open/Drafts/TST007_VIM_VNFM_Iop_Testing_Guidelines/ Latest draft] | ||
=Coordinator= | =Coordinator= | ||
Line 58: | Line 59: | ||
=Contributions (feedback) deadline= | =Contributions (feedback) deadline= | ||
Q4 2016 |
Latest revision as of 09:32, 14 April 2016
Description
This Hot Topic has the following goals:
- Validate and improve the Test Methodology guidelines and templates being described in TST002.
- Contribute Interoperability Test Descriptions & guidelines to TST007.
- Compile a collection of examples of the application of such guidelines and templates in the context in NFV PoCs : Systems Under Test configurations, Test Descriptions, etc,
These goals may be met in a PoC whose focus is testing, or as additional goals for a PoC primarily addressing another topic.
HT#2 (TST) Test Methodology for NFV
Status
ACTIVE
What is expected to be learnt from the NFV PoCs
Points to prove/refute
• For TST002 – Interoperability Test Methodology
- validate and suggest improvements for the Test Description template (section 4)
- identify the functions under test in the context of the PoC
- provide the list of interoperability features tested by the PoC, and the impacted entities (see analysis in the WIKI)
- Provide SUT configurations tested by the PoC Team following the guidelines in section 4. Identify the test interfaces (where actions are triggered and observed)
- provide descriptions (following the Test Description template) of interoperability features successfully tested by the PoC Team in a reproducible way
• For TST007 – VIM- VNFM Interoperability Testing Guidelines
- validate, suggest improvements and contribute additional Test Descriptions
Criterion of success
• Provide input and concrete examples to at least one of the 2 WIs (TST002 or TST007)
Other information
Provide feedback to other NFV Working Groups on the items that have been validated by the testing and/or the gaps identified in the specifications.
- For TST002 - Interoperability Test methodology
- SUT configurations (as exercised by the POC)
- List of NFV IOP Features tested by the POC project
- IOP Test Descriptions (run by the POC, following TD template)
- Lessons learnt and suggestions for improvements in the methodologies
PoC Teams shall follow the HT#2-TST002 Feedback Template on their contributions to Hot Topic#2 - TST002
- For TST007 - VIM-VNFM Interoperability Testing Guidelines
- SUT configurations (as exercised by the POC)
- List of NFV IOP Features tested by the POC project
- IOP Test Descriptions (run by the POC, following TD template)
- Lessons learnt and suggestions for improvements in the methodologies
PoC Teams shall follow the HT#2-TST007 Feedback Template on their contributions to Hot Topic#2 - TST007
Concerned WGs/WI
TST WG:
Coordinator
NFV TST vice-chair: Marie-Paule Odini, HP Marie-paule.odini@hp.com
Contributions (feedback) deadline
Q4 2016