Orchestrated Assurance enabled by NFV: Difference between revisions
(2 intermediate revisions by the same user not shown) | |||
Line 31: | Line 31: | ||
== PoC Report== | == PoC Report== | ||
'''Final PoC Report (28/01/2016):''' [https://docbox.etsi.org/ISG/NFV/TST/05-CONTRIBUTIONS/2016/NFVTST(16) | '''Final PoC Report (28/01/2016):''' [https://docbox.etsi.org/ISG/NFV/TST/05-CONTRIBUTIONS/2016/NFVTST(16)000008_Final_Report_PoC_36_Orchestrated_Assurance_enabled_by_NFV.docx NFVTST(16)000008_Final_Report_PoC_36_Orchestrated_Assurance_enabled_by_NFV.docx] | ||
[[media:poc-report-orchestrated-assurance.pdf|Download PDF version]] |
Latest revision as of 10:42, 22 November 2016
PoC Team
Orange
Netrounds
Cisco
Intel
Telco Systems
Main Contact
Mats Nordlund, Netrounds mats.nordlund@NETROUNDS.COM
PoC Demo
First demo: Big Telecom Event, McCormick Place, Chicago, USA, June 9-10, 2015 - Watch the Demo video
Complete demo: ETSI NFV PoC ZONE @SDN & OpenFlow World Congress, Swissôtel Düsseldorf, Germany, Oct 13-16, 2015. - Watch the Demo video
Abstract
This PoC aims to show orchestration of a network service including configuration of network devices according to the service intent, followed by activation tests, and finally ongoing service level assurance monitoring to verify that the service delivered is what was committed. The use case is based around streaming HTTP video delivered over an orchestrated L3VPN and a radio access network with distributed content caching.
The PoC is based on using a tight service model coupling based on YANG and aims to show that service KPIs can be bound to the orchestrated service and monitored by active virtual probes, so-called vProbes. In the PoC, these vProbes are launched on NFV infrastructure, both in the data center environment, as well as on the demarcation locations at so called distributed NFV locations.
PoC Proposal
NFVTST(15)000028r5_NFV_ISG_PoC_Proposal_Active_Video_Monitoring_in_L3VPN.docx
Updated PoC Proposal (05/09/2015): NFVTST(15)000028r7_NFV_ISG_PoC_Proposal_Orchestrated_Assurance_enabled_by_NFV.docx
PoC Report
Final PoC Report (28/01/2016): NFVTST(16)000008_Final_Report_PoC_36_Orchestrated_Assurance_enabled_by_NFV.docx