Virtualised Mobile Network with Integrated DPI: Difference between revisions
No edit summary |
No edit summary |
||
(One intermediate revision by the same user not shown) | |||
Line 20: | Line 20: | ||
== PoC Proposal == | == PoC Proposal == | ||
[http://docbox.etsi.org/ISG/NFV/PER/05-CONTRIBUTIONS/2014//NFVPER(14)000023r2__NFV_ISG_PoC_Proposal__-_Virtualised_Mobile_Network_with_Int.docx NFVPER(14)000023r2__NFV_ISG_PoC_Proposal__-_Virtualised_Mobile_Network_with_Int.docx] | [http://docbox.etsi.org/ISG/NFV/Closed_WGs/PER/05-CONTRIBUTIONS/2014//NFVPER(14)000023r2__NFV_ISG_PoC_Proposal__-_Virtualised_Mobile_Network_with_Int.docx NFVPER(14)000023r2__NFV_ISG_PoC_Proposal__-_Virtualised_Mobile_Network_with_Int.docx] | ||
== PoC Report == | == PoC Report == | ||
PoC Interim Report (1 July 2014): [http://docbox.etsi.org/ISG/NFV/PER/05-CONTRIBUTIONS/2014//NFVPER(14)000079_PoC_Interim_Report_Virtualised_Mobile_Network_with_DPI.doc NFVPER(14)000079_PoC_Interim_Report_Virtualised_Mobile_Network_with_DPI.doc] | PoC Interim Report (1 July 2014): [http://docbox.etsi.org/ISG/NFV/Closed_WGs/PER/05-CONTRIBUTIONS/2014//NFVPER(14)000079_PoC_Interim_Report_Virtualised_Mobile_Network_with_DPI.doc NFVPER(14)000079_PoC_Interim_Report_Virtualised_Mobile_Network_with_DPI.doc] | ||
PoC Final Report (14 November 2014): [http://docbox.etsi.org/ISG/NFV/Closed_WGs/PER/05-CONTRIBUTIONS/2014//NFVPER(14)000106__NFV_ISG_PoC_Final_Report__-_Virtualised_Mobile_Network_with.doc NFVPER(14)000106__NFV_ISG_PoC_Final_Report__-_Virtualised_Mobile_Network_with.doc] |
Latest revision as of 15:32, 14 January 2015
PoC Team
Telefonica
Intel
Tieto
Qosmos
Wind River Systems
Hewlett Packard
Main Contact
Michael Lynch, Intel michael.a.lynch@intel.com
PoC Demo
Mobile World Congress, 24-28 Feb 2014, Barcelona, Spain
PoC Proposal
NFVPER(14)000023r2__NFV_ISG_PoC_Proposal__-_Virtualised_Mobile_Network_with_Int.docx
PoC Report
PoC Interim Report (1 July 2014): NFVPER(14)000079_PoC_Interim_Report_Virtualised_Mobile_Network_with_DPI.doc
PoC Final Report (14 November 2014): NFVPER(14)000106__NFV_ISG_PoC_Final_Report__-_Virtualised_Mobile_Network_with.doc