Constraint based Placement and Scheduling for NFV/Cloud Systems: Difference between revisions
(2 intermediate revisions by the same user not shown) | |||
Line 11: | Line 11: | ||
VMware | VMware | ||
DELL | |||
== Main Contact == | == Main Contact == | ||
Ram (Ramki) Krishnan, | Ram (Ramki) Krishnan, DELL [mailto:Ramki_Krishnan@DELL.COM Ramki_Krishnan@DELL.COM] | ||
== PoC Demo == | == PoC Demo == | ||
Line 26: | Line 28: | ||
'''Updated (25/04/2015):''' [https://docbox.etsi.org/ISG/NFV/TST/05-CONTRIBUTIONS/2015/NFVTST(15)000057_NFV_ISG_PoC_Proposal___Constraint_based_Placement_and_Schedu.doc hNFVTST(15)000057_NFV_ISG_PoC_Proposal___Constraint_based_Placement_and_Schedu.doc] | '''Updated (25/04/2015):''' [https://docbox.etsi.org/ISG/NFV/TST/05-CONTRIBUTIONS/2015/NFVTST(15)000057_NFV_ISG_PoC_Proposal___Constraint_based_Placement_and_Schedu.doc hNFVTST(15)000057_NFV_ISG_PoC_Proposal___Constraint_based_Placement_and_Schedu.doc] | ||
== PoC Report == | |||
Interim Poc Report (July 2015): [https://docbox.etsi.org/ISG/NFV/TST/05-CONTRIBUTIONS/2015/NFVTST(15)000133_PoC_24_-_Interim_report.docx NFVTST(15)000133_PoC_24_-_Interim_report.docx] |
Latest revision as of 08:25, 2 October 2015
PoC Team
ATT
DT
Brocade
IBM
Red Hat
VMware
DELL
Main Contact
Ram (Ramki) Krishnan, DELL Ramki_Krishnan@DELL.COM
PoC Demo
Brocade Communications Systems, Inc. San Jose, California, USA (additionally in IBM Research Lab, India)
Remote demo at industry events in 2014, target: OpenStack Summit, Paris, November 2014
PoC Proposal
NFVPER(14)000091a4__NFV_ISG_PoC_Proposal__Constraint_based_Placement_and_Schedu.doc
Updated (28/10/2014): NFVPER(14)000091a6__NFV_ISG_PoC_Proposal__Constraint_based_Placement_and_Schedu.doc
Updated (25/04/2015): hNFVTST(15)000057_NFV_ISG_PoC_Proposal___Constraint_based_Placement_and_Schedu.doc
PoC Report
Interim Poc Report (July 2015): NFVTST(15)000133_PoC_24_-_Interim_report.docx