Constraint based Placement and Scheduling for NFV/Cloud Systems: Difference between revisions

From NFVwiki
 
Line 28: Line 28:


'''Updated (25/04/2015):''' [https://docbox.etsi.org/ISG/NFV/TST/05-CONTRIBUTIONS/2015/NFVTST(15)000057_NFV_ISG_PoC_Proposal___Constraint_based_Placement_and_Schedu.doc hNFVTST(15)000057_NFV_ISG_PoC_Proposal___Constraint_based_Placement_and_Schedu.doc]
'''Updated (25/04/2015):''' [https://docbox.etsi.org/ISG/NFV/TST/05-CONTRIBUTIONS/2015/NFVTST(15)000057_NFV_ISG_PoC_Proposal___Constraint_based_Placement_and_Schedu.doc hNFVTST(15)000057_NFV_ISG_PoC_Proposal___Constraint_based_Placement_and_Schedu.doc]
== PoC Report ==
Interim Poc Report (July 2015): [https://docbox.etsi.org/ISG/NFV/TST/05-CONTRIBUTIONS/2015/NFVTST(15)000133_PoC_24_-_Interim_report.docx NFVTST(15)000133_PoC_24_-_Interim_report.docx]

Latest revision as of 08:25, 2 October 2015

PoC Team

ATT

DT

Brocade

IBM

Red Hat

VMware

DELL

Main Contact

Ram (Ramki) Krishnan, DELL Ramki_Krishnan@DELL.COM

PoC Demo

Brocade Communications Systems, Inc. San Jose, California, USA (additionally in IBM Research Lab, India)

Remote demo at industry events in 2014, target: OpenStack Summit, Paris, November 2014

PoC Proposal

NFVPER(14)000091a4__NFV_ISG_PoC_Proposal__Constraint_based_Placement_and_Schedu.doc

Updated (28/10/2014): NFVPER(14)000091a6__NFV_ISG_PoC_Proposal__Constraint_based_Placement_and_Schedu.doc

Updated (25/04/2015): hNFVTST(15)000057_NFV_ISG_PoC_Proposal___Constraint_based_Placement_and_Schedu.doc

PoC Report

Interim Poc Report (July 2015): NFVTST(15)000133_PoC_24_-_Interim_report.docx