Feature Tracking: Difference between revisions
m (corrected figure name) |
((Mirroring the nfvprivatewiki (1 weeks after NFV#30e)) |
||
Line 4: | Line 4: | ||
{| class="wikitable" | {| class="wikitable" | ||
|- | |- | ||
| Current mirror date: 2020. | | Current mirror date: 2020.05.19|| '''This page is a mirror of the [https://nfvprivatewiki.etsi.org/index.php?title=Feature_Tracking Feature Tracking page on the NFV private wiki]. Feature tracking information is frequently updated on the private wiki page , and regularly mirrored onto the present public page.''' <BR>Links to contributions will require authentication with an ETSI Online Account. | ||
|} | |} | ||
Line 136: | Line 136: | ||
|- | |- | ||
|[[Feature Tracking#ENH02: Special technical enhancements|ENH02: Special technical enhancements]] | |[[Feature Tracking#ENH02: Special technical enhancements|ENH02: Special technical enhancements]] | ||
| | |ongoing (Rel 4) | ||
| | |ongoing (Rel 4) | ||
| | |not started | ||
|} | |} | ||
Line 153: | Line 153: | ||
* Note: Agreed content can be added to Pseudo meeting --> If the access is restricted, this may only work within a workgroup. | * Note: Agreed content can be added to Pseudo meeting --> If the access is restricted, this may only work within a workgroup. | ||
* Related/Dependent Features: Please indicate other features which relate to the ongoing work. Details can be given in the implementation plan or in the issues section. | * Related/Dependent Features: Please indicate other features which relate to the ongoing work. Details can be given in the implementation plan or in the issues section. | ||
[[File:ETSI NFV Feature Tracking Wiki | [[File:ETSI NFV Feature Tracking Wiki.png|center]] | ||
== FEATxx: Feature Title == | == FEATxx: Feature Title == | ||
Line 1,890: | Line 1,890: | ||
- Enhance information model for containerized VNFs both using bare metal or nested virtualization technologies | - Enhance information model for containerized VNFs both using bare metal or nested virtualization technologies | ||
|- | |- | ||
| '''Target Release''' || '''Stage 2 Step 1:''' Release 4 Drop #1 (NFV# | | '''Target Release''' || '''Stage 2 Step 1:''' Release 4 Drop #1 (after NFV#30e, July 2020)<br />'''Stage 2 Step 2:''' Release 4 Drop #2 (NFV#31, September 2020)<br />'''Stage 3:''' Release 4 (target date tbd)<br /> | ||
|- | |- | ||
| '''Impacted WIs''' || '''Stage 2:''' IFA007, IFA008, IFA010, IFA011, IFA013<br /> | | '''Impacted WIs''' || '''Stage 2:''' IFA007, IFA008, IFA010, IFA011, IFA013<br /> | ||
Line 1,902: | Line 1,902: | ||
| '''Related/Dependent Features''' || FEAT19 – NFV-Conn <br />FEAT23 – MANO-SBA | | '''Related/Dependent Features''' || FEAT19 – NFV-Conn <br />FEAT23 – MANO-SBA | ||
|- | |- | ||
| '''New Specification ''' || '''Stage 2 Step 1:'''<br /> DGS/NFV-IFA040 - Requirements for service interfaces for OS container management and orchestration <br /> | | '''New Specification ''' || '''Stage 2 Step 1:'''<br /> DGS/NFV-IFA040 - Requirements for service interfaces and object model for OS container management and orchestration specification <br /> | ||
'''Stage 2 Step 2:'''<br /> DGS/NFV-IFA036 - Specification of requirements for the management and orchestration of container cluster nodes <br /> | '''Stage 2 Step 2:'''<br /> DGS/NFV-IFA036 - Specification of requirements for the management and orchestration of container cluster nodes <br /> | ||
Line 1,908: | Line 1,908: | ||
|- | |- | ||
| '''Status''' || | | '''Status''' || | ||
'''Stage 2 Step 1:''' Ongoing ( | '''Stage 2 Step 1:''' Ongoing (75% completed) <br /> | ||
'''Stage 2 Step 2:''' Ongoing (5% completed) <br /> | '''Stage 2 Step 2:''' Ongoing (5% completed) <br /> | ||
'''Stage 3:''' Waiting for Stage 2 | '''Stage 3:''' Waiting for Stage 2 | ||
Line 1,917: | Line 1,917: | ||
'''Stage 3:''' Name (Company) | '''Stage 3:''' Name (Company) | ||
|- | |- | ||
| '''Last Updated''' || 2020- | | '''Last Updated''' || 2020-05-04 | ||
|} | |} | ||
Line 1,939: | Line 1,939: | ||
[https://docbox.etsi.org/ISG/NFV/IFA/05-CONTRIBUTIONS/2020//NFVIFA(20)000019_IFA040-Correct_references_to_NFV_003.docx NFVIFA(20)000019] (Approved)<br /> | [https://docbox.etsi.org/ISG/NFV/IFA/05-CONTRIBUTIONS/2020//NFVIFA(20)000019_IFA040-Correct_references_to_NFV_003.docx NFVIFA(20)000019] (Approved)<br /> | ||
[https://docbox.etsi.org/ISG/NFV/IFA/05-CONTRIBUTIONS/2020//NFVIFA(20)000087_IFA040-Editorial_clean-up.docx NFVIFA(20)000087] (Approved)<br /> | [https://docbox.etsi.org/ISG/NFV/IFA/05-CONTRIBUTIONS/2020//NFVIFA(20)000087_IFA040-Editorial_clean-up.docx NFVIFA(20)000087] (Approved)<br /> | ||
[https://docbox.etsi.org/ISG/NFV/IFA/05-CONTRIBUTIONS/2020//NFVIFA(20)000150_IFA040_3_2_Void_symbols_clause.docx NFVIFA(20)000150] (Approved)<br /> | |||
|| IFA040 || October - 2019 || Complete | || IFA040 || October - 2019 || Complete | ||
|- | |- | ||
Line 1,946: | Line 1,947: | ||
[https://docbox.etsi.org/ISG/NFV/IFA/05-CONTRIBUTIONS/2019/NFVIFA(19)000849r2_IFA040-Clause_4_2-Framework.docx NFVIFA(19)000849r2] (Approved)<br /> | [https://docbox.etsi.org/ISG/NFV/IFA/05-CONTRIBUTIONS/2019/NFVIFA(19)000849r2_IFA040-Clause_4_2-Framework.docx NFVIFA(19)000849r2] (Approved)<br /> | ||
[https://docbox.etsi.org/ISG/NFV/IFA/05-CONTRIBUTIONS/2020//NFVIFA(20)000076r1_IFA040_4_1_Editor_s_note_resolution.docx NFVIFA(20)000076r1] (Approved)<br /> | [https://docbox.etsi.org/ISG/NFV/IFA/05-CONTRIBUTIONS/2020//NFVIFA(20)000076r1_IFA040_4_1_Editor_s_note_resolution.docx NFVIFA(20)000076r1] (Approved)<br /> | ||
[https://docbox.etsi.org/ISG/NFV/IFA/05-CONTRIBUTIONS/2020//NFVIFA(20)000149_IFA040_Editorial_clean-up_part_1.docx NFVIFA(20)000149] (Approved)<br /> | |||
[https://docbox.etsi.org/ISG/NFV/IFA/05-CONTRIBUTIONS/2020/NFVIFA(20)000175r2_IFA_040_-_Review_-_Editorial_improvements.zip NFVIFA(20)000175r2] (Approved)<br /> | |||
|| IFA040 || November - 2019 || Complete | || IFA040 || November - 2019 || Complete | ||
|- | |- | ||
Line 1,959: | Line 1,962: | ||
[https://docbox.etsi.org/ISG/NFV/IFA/05-CONTRIBUTIONS/2020//NFVIFA(20)000063r2_FEAT17_IFA011ed411-_Requirements_and_information_elements_re.docx NFVIFA(20)000063r2] (FEAT agreed)<br /> | [https://docbox.etsi.org/ISG/NFV/IFA/05-CONTRIBUTIONS/2020//NFVIFA(20)000063r2_FEAT17_IFA011ed411-_Requirements_and_information_elements_re.docx NFVIFA(20)000063r2] (FEAT agreed)<br /> | ||
[https://docbox.etsi.org/ISG/NFV/IFA/05-CONTRIBUTIONS/2020//NFVIFA(20)000077r1_FEAT17-IFA011ed411-Resolving_editors_notes_from_contribution.docx NFVIFA(20)000077r1] (FEAT agreed)<br /> | [https://docbox.etsi.org/ISG/NFV/IFA/05-CONTRIBUTIONS/2020//NFVIFA(20)000077r1_FEAT17-IFA011ed411-Resolving_editors_notes_from_contribution.docx NFVIFA(20)000077r1] (FEAT agreed)<br /> | ||
[https://docbox.etsi.org/ISG/NFV/IFA/05-CONTRIBUTIONS/2020//NFVIFA(20)000170r1_FEAT17-IFA011ed411-Template_attribute_for_VirtualStorageDesc.docx NFVIFA(20)000170r1] (FEAT agreed)<br /> | |||
[https://docbox.etsi.org/ISG/NFV/IFA/05-CONTRIBUTIONS/2020//NFVIFA(20)000213r3_FEAT17-IFA011ed411-Modeling-Cpd.docx NFVIFA(20)000213r3] (FEAT agreed)<br /> | |||
|| IFA011 || February - 2020 || Complete | || IFA011 || February - 2020 || Complete | ||
|- | |- | ||
Line 1,971: | Line 1,976: | ||
[https://docbox.etsi.org/ISG/NFV/IFA/05-CONTRIBUTIONS/2019//NFVIFA(19)000924r1_IFA040-Clause_5_3-Objects_relationship.docx NFVIFA(19)000924r1] (Approved)<br /> | [https://docbox.etsi.org/ISG/NFV/IFA/05-CONTRIBUTIONS/2019//NFVIFA(19)000924r1_IFA040-Clause_5_3-Objects_relationship.docx NFVIFA(19)000924r1] (Approved)<br /> | ||
[https://docbox.etsi.org/ISG/NFV/IFA/05-CONTRIBUTIONS/2020//NFVIFA(20)000075_IFA040_5_2_2_2_Editor_s_note_resolution.docx NFVIFA(20)000075] (Approved)<br /> | [https://docbox.etsi.org/ISG/NFV/IFA/05-CONTRIBUTIONS/2020//NFVIFA(20)000075_IFA040_5_2_2_2_Editor_s_note_resolution.docx NFVIFA(20)000075] (Approved)<br /> | ||
[https://docbox.etsi.org/ISG/NFV/IFA/05-CONTRIBUTIONS/2020/NFVIFA(20)000182r2_IFA040_Editorial_clean-up_part_2.docx NFVIFA(20)000182r2] (Approved)<br /> | |||
[https://docbox.etsi.org/ISG/NFV/IFA/05-CONTRIBUTIONS/2020/NFVIFA(20)000190r1_IFA040_-_Review_-_Clarifications_on_the_model_mapping.docx NFVIFA(20)000190r1] (Approved)<br /> | |||
|| IFA040 || November - 2019 || Complete | || IFA040 || November - 2019 || Complete | ||
|- | |- | ||
Line 1,981: | Line 1,988: | ||
[https://docbox.etsi.org/ISG/NFV/IFA/05-CONTRIBUTIONS/2020//NFVIFA(20)000020_FEAT17-IFA010ed411-Functional_requirements_for_CISM.docx NFVIFA(20)000020] (FEAT agreed)<br /> | [https://docbox.etsi.org/ISG/NFV/IFA/05-CONTRIBUTIONS/2020//NFVIFA(20)000020_FEAT17-IFA010ed411-Functional_requirements_for_CISM.docx NFVIFA(20)000020] (FEAT agreed)<br /> | ||
[https://docbox.etsi.org/ISG/NFV/IFA/05-CONTRIBUTIONS/2020//NFVIFA(20)000025_FEAT17-IFA010ed411-Clause_12_2_CISM_Functional_requirements_.docx NFVIFA(20)000025] (FEAT agreed)<br /> | [https://docbox.etsi.org/ISG/NFV/IFA/05-CONTRIBUTIONS/2020//NFVIFA(20)000025_FEAT17-IFA010ed411-Clause_12_2_CISM_Functional_requirements_.docx NFVIFA(20)000025] (FEAT agreed)<br /> | ||
[https://docbox.etsi.org/ISG/NFV/IFA/05-CONTRIBUTIONS/2020//NFVIFA(20) | [https://docbox.etsi.org/ISG/NFV/IFA/05-CONTRIBUTIONS/2020//NFVIFA(20)000026r1_FEAT17-IFA010ed411-_Clause_12_3_CISM_Functional_requirements.docx NFVIFA(20)000026r1] (FEAT agreed)<br /> | ||
[https://docbox.etsi.org/ISG/NFV/IFA/05-CONTRIBUTIONS/2020//NFVIFA(20)000027_FEAT17-IFA010ed411-Clause_12_4_CISM_Functional_requirements_.docx NFVIFA(20)000027] (FEAT agreed)<br /> | [https://docbox.etsi.org/ISG/NFV/IFA/05-CONTRIBUTIONS/2020//NFVIFA(20)000027_FEAT17-IFA010ed411-Clause_12_4_CISM_Functional_requirements_.docx NFVIFA(20)000027] (FEAT agreed)<br /> | ||
[https://docbox.etsi.org/ISG/NFV/IFA/05-CONTRIBUTIONS/2020//NFVIFA(20) | [https://docbox.etsi.org/ISG/NFV/IFA/05-CONTRIBUTIONS/2020//NFVIFA(20)000028r2_FEAT17-IFA010ed411-Clause_12_5_CISM_Functional_requirements_.docx NFVIFA(20)000028r2] (FEAT agreed)<br /> | ||
|| IFA010 || January - 2020 || Complete | || IFA010 || January - 2020 || Complete | ||
|- | |- | ||
Line 1,989: | Line 1,996: | ||
CR drafts: <br /> | CR drafts: <br /> | ||
[https://docbox.etsi.org/ISG/NFV/IFA/05-CONTRIBUTIONS/2020//NFVIFA(20)000030_FEAT17-IFA010ed411-Clause_13_Functional_requirements_for_CIR.docx NFVIFA(20)000030] (FEAT agreed)<br /> | [https://docbox.etsi.org/ISG/NFV/IFA/05-CONTRIBUTIONS/2020//NFVIFA(20)000030_FEAT17-IFA010ed411-Clause_13_Functional_requirements_for_CIR.docx NFVIFA(20)000030] (FEAT agreed)<br /> | ||
[https://docbox.etsi.org/ISG/NFV/IFA/05-CONTRIBUTIONS/2020//NFVIFA(20)000095r1_FEAT17-IFA010ed411-Clause_13_Another_Functional_requirements.docx NFVIFA(20)000095r1] ( | [https://docbox.etsi.org/ISG/NFV/IFA/05-CONTRIBUTIONS/2020//NFVIFA(20)000095r1_FEAT17-IFA010ed411-Clause_13_Another_Functional_requirements.docx NFVIFA(20)000095r1] (FEAT agreed)<br /> | ||
|| IFA010 || February - 2020 || | || IFA010 || February - 2020 || Complete | ||
|- | |- | ||
| ST2-009 || General CISM service requirements (Clauses 6.1, 6.2) | | ST2-009 || General CISM service requirements (Clauses 6.1, 6.2) | ||
Line 1,996: | Line 2,003: | ||
[https://docbox.etsi.org/ISG/NFV/IFA/05-CONTRIBUTIONS/2019//NFVIFA(19)000974_IFA040-Clause_6_2-General_CISM_service_requirements.docx NFVIFA(19)000974] (Approved)<br /> | [https://docbox.etsi.org/ISG/NFV/IFA/05-CONTRIBUTIONS/2019//NFVIFA(19)000974_IFA040-Clause_6_2-General_CISM_service_requirements.docx NFVIFA(19)000974] (Approved)<br /> | ||
[https://docbox.etsi.org/ISG/NFV/IFA/05-CONTRIBUTIONS/2020//NFVIFA(20)000015_IFA040-Clause_6-Additional_CISM_service_requirements.docx NFVIFA(20)000015] (Approved)<br /> | [https://docbox.etsi.org/ISG/NFV/IFA/05-CONTRIBUTIONS/2020//NFVIFA(20)000015_IFA040-Clause_6-Additional_CISM_service_requirements.docx NFVIFA(20)000015] (Approved)<br /> | ||
|| IFA040 || January - 2020 || Complete | || IFA040 || January - 2020 || Complete | ||
|- | |- | ||
Line 2,007: | Line 2,013: | ||
[https://docbox.etsi.org/ISG/NFV/IFA/05-CONTRIBUTIONS/2020//NFVIFA(20)000016_IFA040-Clause_6_6-Network_management_service_interface_requi.docx NFVIFA(20)000016] (Approved)<br /> | [https://docbox.etsi.org/ISG/NFV/IFA/05-CONTRIBUTIONS/2020//NFVIFA(20)000016_IFA040-Clause_6_6-Network_management_service_interface_requi.docx NFVIFA(20)000016] (Approved)<br /> | ||
[https://docbox.etsi.org/ISG/NFV/IFA/05-CONTRIBUTIONS/2020//NFVIFA(20)000062_IFA040_Adding_missing_notification_related_requirements.docx NFVIFA(20)000062] (Approved)<br /> | [https://docbox.etsi.org/ISG/NFV/IFA/05-CONTRIBUTIONS/2020//NFVIFA(20)000062_IFA040_Adding_missing_notification_related_requirements.docx NFVIFA(20)000062] (Approved)<br /> | ||
[https://docbox.etsi.org/ISG/NFV/IFA/05-CONTRIBUTIONS/2020//NFVIFA(20)000151r2_IFA040_Section_6_proposed_changes.docx NFVIFA(20)000151r2] (Approved)<br /> | |||
[https://docbox.etsi.org/ISG/NFV/IFA/05-CONTRIBUTIONS/2020/NFVIFA(20)000176_IFA_040_-_Review_-_Minor_Technical_improvements.docx NFVIFA(20)000176] (Approved)<br /> | |||
[https://docbox.etsi.org/ISG/NFV/IFA/05-CONTRIBUTIONS/2020/NFVIFA(20)000178r2_IFA040-Add_requirements_on_access_control_for_CISM_service_i.docx NFVIFA(20)000178r2] (Approved)<br /> | |||
|| IFA040 || January - 2020 || Complete | || IFA040 || January - 2020 || Complete | ||
|- | |- | ||
Line 2,023: | Line 2,032: | ||
| ST2-013 || Extend the NFVO functional requirements for consuming the management service interfaces exposed by the CISM function | | ST2-013 || Extend the NFVO functional requirements for consuming the management service interfaces exposed by the CISM function | ||
CR drafts: <br /> | CR drafts: <br /> | ||
|| IFA010 || March - 2020 || | [https://docbox.etsi.org/ISG/NFV/IFA/05-CONTRIBUTIONS/2020//NFVIFA(20)000228r2_FEAT17-IFA010ed411-Clause_6_XX-NFVO_requirements_for_OS_cont.docx NFVIFA(20)000228r2] (FEAT agreed)<br /> | ||
|| IFA010 || March - 2020 || Complete | |||
|- | |- | ||
| ST2-014 || Extend the NFVO functional requirements for consuming the management service interfaces exposed by the CIR function | | ST2-014 || Extend the NFVO functional requirements for consuming the management service interfaces exposed by the CIR function | ||
CR drafts: <br /> | CR drafts: <br /> | ||
|| IFA010 || March - 2020 || | [https://docbox.etsi.org/ISG/NFV/IFA/05-CONTRIBUTIONS/2020/NFVIFA(20)000227_FEAT17-IFA010ed411-Clause_6_12-NFVO_requirements_for_OS_cont.docx NFVIFA(20)000227] (FEAT agreed)<br /> | ||
|| IFA010 || March - 2020 || Complete | |||
|- | |- | ||
| ST2-015 || Extend the VNFM functional requirements for consuming the management service interfaces exposed by the CISM function | | ST2-015 || Extend the VNFM functional requirements for consuming the management service interfaces exposed by the CISM function | ||
CR drafts: <br /> | CR drafts: <br /> | ||
|| IFA010 || March - 2020 || | [https://docbox.etsi.org/ISG/NFV/IFA/05-CONTRIBUTIONS/2020/NFVIFA(20)000238_FEAT17-IFA010ed411-Clause_7_8-VNFM_requirements_for_OS_conta.docx NFVIFA(20)000238] (FEAT agreed)<br /> | ||
[https://docbox.etsi.org/ISG/NFV/IFA/05-CONTRIBUTIONS/2020/NFVIFA(20)000241_FEAT17-IFA010ed411-Clause_7_XX-VNFM_requirements_for_contain.docx NFVIFA(20)000241] (FEAT agreed)<br /> | |||
[https://docbox.etsi.org/ISG/NFV/IFA/05-CONTRIBUTIONS/2020//NFVIFA(20)000264r1_FEAT17-IFA010ed411-Clause_7_XX_3-VNFM_requirements_for_OS_co.docx NFVIFA(20)000264r1] (FEAT agreed)<br /> | |||
|| IFA010 || March - 2020 || Complete | |||
|- | |- | ||
| ST2-016 || Enhance the information models of the Or-Vnfm interfaces for OS container management and orchestration | | ST2-016 || Enhance the information models of the Or-Vnfm interfaces for OS container management and orchestration | ||
CR drafts: <br /> | CR drafts: <br /> | ||
|| IFA007 || | || IFA007 || May - 2020 || Open | ||
|- | |- | ||
| ST2-017 || Enhance the information models of the Ve-Vnfm interfaces for OS container management and orchestration | | ST2-017 || Enhance the information models of the Ve-Vnfm interfaces for OS container management and orchestration | ||
CR drafts: <br /> | CR drafts: <br /> | ||
|| IFA008 || | || IFA008 || May - 2020 || Open | ||
|- | |- | ||
| ST2-018 || Enhance the information models of the Os-Ma-nfvo interfaces for OS container management and orchestration | | ST2-018 || Enhance the information models of the Os-Ma-nfvo interfaces for OS container management and orchestration | ||
CR drafts: <br /> | CR drafts: <br /> | ||
|| IFA013 || | || IFA013 || May - 2020 || Open | ||
|- | |- | ||
| ||'''FEAT17 Stage 2 - Step 2'''|| || || | | ||'''FEAT17 Stage 2 - Step 2'''|| || || | ||
Line 2,049: | Line 2,063: | ||
| ST2-019 || Container cluster nodes management interface requirements (Clause 5) | | ST2-019 || Container cluster nodes management interface requirements (Clause 5) | ||
CR drafts: <br /> | CR drafts: <br /> | ||
|| IFA036 || | || IFA036 || June - 2020 || Open | ||
|} | |} | ||
Line 2,763: | Line 2,777: | ||
* NFVIFA(19)000966r2: adding RD IE in IFA014, available | * NFVIFA(19)000966r2: adding RD IE in IFA014, available | ||
* NFVIFA(19)0001018: new requirements to IFA010, available | * NFVIFA(19)0001018: new requirements to IFA010, available | ||
* NFVIFA(20)000240r1: adding new routing resource as a new type of network resources: approved (IFA#190) | |||
* NFVIFA(20)000239r1: discussion paper for adding routing resource, available | |||
|- | |- | ||
|ENH02.02 | |||
|NFV-MANO enhancement for NS feasibility check | |||
|Under development | |||
|Junichi Kawasaki <ju-kawasaki@kddi.com>, Kenichi Ogaki <ke-oogaki@kddi.com>, Cristina Badulescu <cristina.badulescu@ericsson.com>, Anatoly Andrianov <anatoly.andrianov@nokia.com>, Kleber Ulrich <Ulrich.Kleber@huawei.com> | |||
|This new enhancement proposes to add the capability of feasibility check of Network Service to the lifecycle management during the timeframe of Release 4. | |||
This is required to support the requirements specified in step-3 of clause 5.1.21 in 3GPP TS28.531 (Management and provisioning of 5G network slicing), to check the feasibility of Network slice subnet by sending enquiry requests to MANO to determine availability of network constituents. | |||
This work suggests to enhance the Os-Ma-nfvo reference point to supporting the feasibility check of Network Service. | |||
| | | | ||
* NFVIFA(20)000187r2: New enhancement proposal (accepted) | |||
* | |||
|- | |- | ||
| | | |
Revision as of 08:19, 19 May 2020
Introduction
Current mirror date: 2020.05.19 | This page is a mirror of the Feature Tracking page on the NFV private wiki. Feature tracking information is frequently updated on the private wiki page , and regularly mirrored onto the present public page. Links to contributions will require authentication with an ETSI Online Account. |
Feature Overview
Feature | Stage 1 | Stage 2 | Stage 3 |
---|---|---|---|
FEAT01: NFV-MANO Upgrades | ongoing (Rel 4) | not started | not started |
FEAT02: VNF software modification | completed (Rel 3) | completed (Rel 3) | not started |
FEAT03: NFVI software modification | completed (Rel 3) | completed (Rel 3) | ongoing (Rel 3) |
FEAT04: Host Reservation | n/a | completed (Rel 3) | ongoing (Rel 3) |
FEAT05 Network Slicing | completed (Rel 3) | completed (Rel 3) | ongoing (Rel 3) |
FEAT06: Enhancement Network Service (NS) Package | n/a (part of Rel 2) | n/a (part of Rel 2) | n/a (part of Rel 2) |
FEAT07: MANO Policy Management (MANO_PLC) | completed (Rel 3) | completed (Rel 3) | ongoing (Rel 3) |
FEAT08: Support of composite NS across multi-domain (MANOMD_NS) | completed (Rel 3) | completed (Rel 3) | ongoing (Rel 3) |
FEAT10: Mgmt & Connectivity Multi-Site Services (MCMSS) | completed (Rel 3) | completed (Rel 3) | ongoing (Rel 3) |
FEAT11: NFV_M&M (NFV-MANO management) | completed (Rel 3) | completed (Rel 3) | completed (Rel 3) |
FEAT12: Enhancement support for MEC in NFV deployments | n/a | ongoing (Rel 3) | n/a |
FEAT13: Licencing | ongoing (Rel 4) | not started | not started |
FEAT15: VNF Snapshotting | completed (Rel 3) | completed (Rel 3) | ongoing (Rel 3) |
FEAT16: Service Availability Level | n/a | completed (Rel 3) | ongoing (Rel 3) |
FEAT17: Cloud-Native VNFs and Container Infrastructure management | completed (Rel 3) | ongoing (Rel 4) | not started (Rel 4) |
FEAT18: Security | completed (Rel 3) | ongoing (Rel 3) | not started |
FEAT19: NFV-Connect | not started | not started | not started |
FEAT20: Auto | ongoing (Rel 4) | not started | not started |
FEAT21: 5GNFV | ongoing (Rel 4) | not started | not started |
FEAT22: M-Tenant | ongoing (Rel 4) | not started | not started |
FEAT23: MANO-SBA | ongoing (Rel 4) | not started | not started |
FEAT24: VNF-OAM | ongoing (Rel 4) | not started | not started |
FEAT25: VNF-CI | not started | not started | not started |
ENH01: Security enhancements | n/a | n/a | n/a |
ENH02: Special technical enhancements | ongoing (Rel 4) | ongoing (Rel 4) | not started |
Introduction
Some introduction will be put here including guidelines, process description and tutorials.
- Link to Release 3 implementation process
- Link to the "consolidated IFA Release 3 Feature plan". Refer to NFVIFA(17)000914 and revisions. Latest version NFVIFA(17)000914r4
- Training for Feature Primes
- Process
- Wiki editing
- Naming conventions: e.g. FEAT00_IFA007_[Contribution name]
- To build a link to all contributions belonging to a feature, replace FEAT99 in the link stated below with the Feature short name for your feature e.g. FEAT15:
https://portal.etsi.org/Contribution.aspx?Tb_Id=789&searchText=FEAT99&IncludeSubTb=True&sort=pk_contribution&sortorder=DESC&NbItemsPerPage=50&Year=2017,2018,2019
- Note: Agreed content can be added to Pseudo meeting --> If the access is restricted, this may only work within a workgroup.
- Related/Dependent Features: Please indicate other features which relate to the ongoing work. Details can be given in the implementation plan or in the issues section.
FEATxx: Feature Title
Overview
Feature Prime | Name, Company, E-Mail |
Feature description | Short Description of the Feature |
Target Release | Stage 2: Release 3 (2018-X-X)
Stage 3: Release 3 (2019-X-X) |
Impacted WIs | Stage 2: IFAxx, IFAyy, SOLzz
Stage 3: SOLzz |
MegaCRs | Stage 2:
IFAxxx MegaCR NFVIFA(18)000xxx (CR Status) IFAyyy MegaCR NFVIFA(18)000yyy (CR Status) Stage 3: SOLzzz MegaCR NFVSOL(19)000zzz (CR Status) |
Related/Dependent Features | FEATxx FEATyy |
New Specifcations | Stage 2: none
Stage 3: SOLaaa |
Status | Stage 2: Completed
Stage 3: Ongoing (20% completed) |
Contributions | All feature contributions Agreed content |
Feature team | Stage 2: Name (Company)
Stage 3: Name (Company) |
Last Updated | 20xx-xx-xx |
Stage 2 Implementation Plan
Items to consider in the implementation plan
- Detailed description what has to be done in which work item.
- Timeplan of when the team plans to conclude a particular action in the implementation plan.
IFA
ID | Action | Impacted WG(s) | Target completion | Status |
---|---|---|---|---|
001 | Add interface X in to IFA007. CR draft [LINK] | IFA | March-2018 | Open |
SOL
ID | Action | Impacted WG(s) | Target completion | Status |
---|---|---|---|---|
001 | Add interface X in to SOL001. CR draft [LINK] | SOL | March-2018 | Open |
Stage 3 Implementation Plan
Items to consider in the implementation plan
- Detailed description what has to be done in which work item.
- Timeplan of when the team plans to conclude a particular action in the implementation plan.
SOL
ID | Action | Impacted WG(s) | Target completion | Status |
---|---|---|---|---|
001 | Add interface X in to SOL001. CR draft [LINK] | SOL | March-2018 | Open |
Issues
List of issues raised based on the feature implementation.
Security Considerations
List of security considerations implied by the feature.
FEAT02: VNF software modification
Overview
Feature Prime | Stefan Arntzen, Huawei |
Feature description | This feature addresses the initiation and the coordination of the software modification process related to VNFs. Goal is to minimise the impact of software modification on service availability. |
Target Release | Release 3 |
Impacted WIs | IFA007, IFA008, IFA011, IFA013, IFA010 (not approved) |
MegaCRs | MegaCR Index in NFVIFA(19)000117r1
IFA007: NFVIFA(19)000059r4 Status: Approved MegaCR (IFA#137) IFA008: NFVIFA(19)000058 Status: Approved MegaCR (IFA#137) IFA010: NFVIFA(19)000060 Status: Approved MegaCR (IFA#137) IFA011: NFVIFA(19)000061r3 Status: Approved MegaCR (IFA#137) IFA013: NFVIFA(19)000077r3 (single contribution for IFA013) |
Related/Dependent Features | N/A |
Status | Completed |
Contributions | All feature contributions Agreed content |
Feature team | Stefan Arntzen (Huawei) Maria Toeroe (Ericsson) Shaoji Ni (Huawei) Dmytro Gassanov (NEC) Lijuan Chen (ZTE) Gerald Kunzmann (DOCOMO) Joan Triay (DOCOMO) |
Last Updated | 2019-02-06 |
Implementation Plan
Items to consider in the implementation plan
- Detailed description what has to be done in which work item.
- Timeplan of when the team plans to conclude a particular action in the implementation plan.
ID | Action | Impacted WG(s) | Target completion | Status |
---|---|---|---|---|
001 | Add functionality description of VNF software modification synchronisation in to IFA010.
CR drafts: NFVIFA(18)000869r3 Status: Agreed FEAT (IFA#124) NFVIFA(19)000051r2 Status: Agreed FEAT (IFA#136) |
IFA010 | January-2019 | Completed |
002 | Define metadata to allow to synchronize the software modification process
CR drafts: - NFVIFA(18)000936r2 Status: Agreed FEAT (IFA#125) - NFVIFA(18)0001037r1 Status: Agreed FEAT (IFA#129) - NFVIFA(18)0001122r3 Status: Agreed FEAT (IFA#136) - NFVIFA(18)0001125r2 Status: Agreed FEAT (IFA#132) - NFVIFA(18)0001126r1 Status: Agreed FEAT (IFA#132) - NFVIFA(18)0001149r1 Status: Agreed FEAT (IFA#134) - NFVIFA(18)0001150r2 Status: Agreed FEAT (IFA#134) - NFVIFA(18)0001151r6 Status: Agreed FEAT (IFA#137) - NFVIFA(18)0001155r4 Status: Agreed FEAT (IFA#135) - - NFVIFA(19)000049r1 Status: not handled in v3.2.1 - NFVIFA(19)000056 Status: not handled in v3.2.1 - NFVIFA(19)000082 Status: Agreed FEAT (IFA#137) - NFVIFA(19)000083r2 Status: Agreed FEAT (IFA#137) - NFVIFA(19)000101r2 Status: Agreed FEAT (IFA#137) - NFVIFA(19)000105r1 Status: Agreed FEAT (IFA#137) |
IFA011 | January-2019 | Completed |
003 | Derive the requirements from REL006 for an interface for the coordination of VNF software modifications actions on the Or-Vnfm reference point | IFA007 | December-2018 | Completed |
004 | Derive the requirements from REL006 for an interface for the coordination of VNF software modifications actions on the Ve-Vnfm reference point | IFA008 | December-2018 | Completed |
005 | Specify the interface for the coordination of the NFVI software modifications with the hosted VNFs on the Or-Vnfm reference point
CR drafts: - NFVIFA(18)000937r3 Status: Agreed FEAT (IFA#125) - NFVIFA(18)000935r2 Status: Agreed FEAT (IFA#125) - NFVIFA(18)0001154r2 Status: Agreed FEAT (IFA#135) - NFVIFA(19)000115r1 Status: Agreed FEAT (IFA#137) |
IFA007 | January-2019 | Completed |
006 | Specify the interface for the coordination of the NFVI software modifications with the hosted VNFs on the Ve-Vnfm reference point
CR drafts: - NFVIFA(18)000938 Status: Obsolete (superseeded by 107r2) - NFVIFA(19)000106 Status: Agreed FEAT (IFA#137) - NFVIFA(19)000107r2 Status: Agreed FEAT (IFA#137) - NFVIFA(19)000116 Status: Agreed FEAT (IFA#137) |
IFA008 | January-2019 | Completed |
007 | Add annex with information flows to document the procedures for the VNF software modifications
CR drafts (IFA007): - NFVIFA(18)000933r6: Status: Agreed FEAT (IFA#128) - NFVIFA(19)000094r1 Status: Agreed FEAT (IFA#137) - NFVIFA(19)000096r1 Status: Agreed FEAT (IFA#137) - NFVIFA(19)000097r3 Status: Agreed FEAT (IFA#137) CR drafts (IFA013): - NFVIFA(18)000934 Status: not handled in v3.2.1 |
IFA007,
IFA013 |
January-2019 | Completed |
008 | Finalize CRs for the changes from 001, 002, 005, 006, 007 and create MegaCRs | IFA | February-2019 | Completed |
009 | Security analysis:
- NFVIFA(18)0001147r1 Status: Agreed by SEC WG |
IFA | January-2019 | Completed |
010 | Requirements and operations for NS LCM interface:
- NFVIFA(19)000077r3 Status: Agreed FEAT (IFA#137) |
IFA013 | January-2019 | Completed |
Issues
List of issues raised based on the feature implementation.
Security Considerations
List of security considerations implied by the feature.
FEAT03: NFVI software modification
Overview
Feature Prime | Maria Toeroe (Ericsson), Gerald Kunzmann (DOCOMO) |
Feature description | This feature addresses the support for the coordination of the NFVI software modification process with the VNFs hosted on the NFVI in order to minimize impact on service availability. |
Target Release | Stage 2: Release 3 drop 3 (2019-06)
Stage 3: Release 3 (2019-12) |
Impacted WIs | IFA005, IFA006, IFA007, IFA008, IFA010, IFA011 |
MegaCRs | Stage 2:
IFA005: NFVIFA(19)000455 Baseline (Approved in IFA#159) IFA007: N/A (was IFA010: NFVIFA(19)000038r7 Baseline (Approved in IFA#159) Stage 3: <tbd> |
Related/Dependent Features | N/A |
Status | Stage 2: Approved (IFA#159). MegaCR Index available in NFVIFA(19)000603r1
Stage 3: Not started |
Contributions | Stage 2:
All feature contributions Stage 3: <tbd> |
Feature team | Stage 2:
Maria Toeroe (Ericsson) Stage 3: <tbd> |
Last Updated | 2019-07-15 |
Stage 2 Implementation Plan
ID | Action | Impacted WG(s) | Target completion | Status |
---|---|---|---|---|
001 | Based on REL006 add functionality description of NFVI software modification support to IFA010 for the VIM, VNFM and NFVO. CR Drafts:
NFVIFA(18)000631r4 Status: Agreed
NFVIFA(19)000092r1 Status: Agreed FEAT (IFA#141) NFVIFA(19)000287r3 Status: Agreed FEAT (IFA#148) NFVIFA(19)000345r2 Status: Agreed FEAT (IFA#149) NFVIFA(19)000360r7 Status: Agreed FEAT (IFA#152) NFVIFA(19)000361r6 Status: Agreed FEAT (IFA#152) NFVIFA(19)000377r5 Status: Agreed FEAT (IFA#152) NFVIFA(19)000384r3 Status: Agreed FEAT (IFA#152) NFVIFA(19)000400r1 Status: Agreed FEAT (IFA#152) NFVIFA(19)000426r2 Status: Agreed FEAT (IFA#152) NFVIFA(19)000464r7 Status: Agreed FEAT (IFA#155) NFVIFA(19)000539r1 Status: Agreed FEAT (IFA#155) NFVIFA(19)000571 Status: Agreed FEAT (IFA#157) NFVIFA(19)000577 Status: Agreed FEAT (IFA#157) |
IFA010 | June 2019 | Started |
002 | Based on REL006 specify the requirements for an interface for the coordination of the NFVI software modifications with the hosted VNFs on the Or-Vi reference point | IFA005 | December-2018 | Open |
003 | Based on REL006 specify the requirements for an interface for the coordination of the NFVI software modifications with the hosted VNFs on the Vi-Vnfm reference point | IFA006 | December-2018 | Open |
004 | Based on REL006 specify the requirements for an interface for the coordination of the NFVI software modifications with the hosted VNFs on the Ve-Vnfm reference point | IFA008 | December-2018 | Open |
005 | Based on REL006 specify the requirements for an interface for the coordination of the NFVI software modifications with the hosted VNFs on the Or-Vnfm reference point | IFA007 | December-2018 | Open |
006 | Specify the interface for the coordination of the NFVI software modifications with the hosted VNFs on the Or-Vi reference point. CR Drafts:
|
IFA005 | June 2019 | Started |
007 | Specify the interface for the coordination of the NFVI software modifications with the hosted VNFs on the Vi-Vnfm reference point. CR Drafts: NFVIFA(18)000296r9 Status: Agreed
NFVIFA(18)0001054r4 Status: Agreed NFVIFA(19)000033 Status: Agreed
NFVIFA(19)000318r4 Status: Agreed FEAT (IFA#148) NFVIFA(19)000449r3 Status: Agreed FEAT (IFA#153) NFVIFA(19)000460r5 Status: Agreed FEAT (IFA#155) NFVIFA(19)000462r5 Status: Agreed FEAT (IFA#155) NFVIFA(19)000461r1 Status: Agreed FEAT (IFA#157) NFVIFA(19)000463r1 Status: Agreed FEAT (IFA#154) NFVIFA(19)000551r4 Status: Agreed FEAT (IFA#154) NFVIFA(19)000563r1 Status: Agreed FEAT (IFA#154) |
IFA006 | June 2019 | Started |
008 | Specify the interface for the coordination of the NFVI software modifications with the hosted VNFs on the Ve-Vnfm reference point. CR Drafts: NFVIFA(19)000102r8 Status: Agreed FEAT (IFA#144)
NFVIFA(19)000371r9 Status: Agreed FEAT (IFA#152) |
IFA008 | June 2019 | Started |
009 | Specify the interface for the coordination of the NFVI software modifications with the hosted VNFs on the Or-Vnfm reference point. CR Drafts: NFVIFA(19)000069 Status: Agreed FEAT (IFA#141)
NFVIFA(19)000515 Status: Candidate for Agreed FEAT in IFA#155 |
IFA007 | June 2019 | Started |
010 | Specify the VNF constraints parameters for NFVI software modifications in the VNFD. CR Drafts: NFVIFA(18)000456r5 Status: Agreed FEAT (IFA#129) NFVIFA(18)000873r3 Status: Agreed FEAT (IFA#129) NFVIFA(19)000091 Status: Agreed FEAT (IFA#141) NFVIFA(19)000090r2 Status: Agreed FEAT (IFA#144) NFVIFA(19)000087 Status: Agreed FEAT (IFA#141) NFVIFA(19)000265r1 Status: Agreed FEAT (IFA#144) NFVIFA(19)000319r3 Status: Agreed FEAT (IFA#148) |
IFA011 | June 2019 | Started |
Stage 3 Implementation Plan
Items to consider in the implementation plan
- Detailed description what has to be done in which work item.
- Timeplan of when the team plans to conclude a particular action in the implementation plan.
SOL
ID | Action | Impacted WG(s) | Target completion | Status |
---|---|---|---|---|
001 | Add interface X in to SOL001. CR draft [LINK] | SOL | March-2018 | Open |
Issues
List of issues raised based on the feature implementation.
Security Considerations
Security considerations for the feature are in NFVIFA(19)000036r2
FEAT04: Host Reservation
Overview
Feature Prime | Gerald KUNZMANN (DOCOMO Communications Lab.) |
Feature description | The present enhancement proposes adding the capability to the NFV-MANO architectural framework to support the reservation of compute hosts (see clause 3.1 in GS NFV-PER 001) in the NFVI. Detailed feature proposal is available in IFA_Enhancement_Host_Reservation |
Target Release | Release 3 drop 1 (2018-05) |
Impacted WIs | IFA005, IFA007, IFA010, IFA013 |
MegaCRs | IFA005 MegaCR in NFVIFA(18)000420r1 (Approved MegaCR) (new text in clauses 2.2, 5.2, 5.3.X, 5.3.Y, 5.3.Z, 7.X, 7.Y, 8.X; updates clause 8.7.4) IFA007 MegaCR in NFVIFA(18)000421r1 (Approved MegaCR) (updates clauses 6.3.2 "Grant VNF Lifecycle Operation operation" and 8.3.3 "GrantInfo information element") IFA010 MegaCR in NFVIFA(18)000419r3 (Approved MegaCR) (new text in clauses 2.2, 3.1, 6.1.6, 6.X, 8.2.3, 8.X, A.2) IFA013 MegaCR in NFVIFA(18)000422r2 (Approved MegaCR) (new text in clauses 5.2, 5.X, 7.X, 8.X) |
Related/Dependent Features | N/A |
Status | Approved. MegaCR Index available in NFVIFA(18)000475r1 |
Contributions | All feature contributions Agreed content |
Feature team | Arturo Martin De Nicolas (Ericsson LM) Bertrand Souville (DOCOMO Communications Lab.) Joan Triay (DOCOMO Communications Lab.) |
Last Updated | 2018-07-30 |
Implementation Plan
NOTE: below contributions are marked as "OBSOLETE" as all content has been migrated to the MegaCRs (see above) and FEAT04 has been approved at IFA#101.
ID | Action | Impacted WG(s) | Target completion | Status |
---|---|---|---|---|
001 | Specify a requirement for the VIM to support the capability of handling reservation of resources at the host level. Specify a requirement for the NFVO to support requesting the reservation of resources at the host level. CR drafts: NFVIFA(17)0001086 (VIM) Status: Obsolete NFVIFA(18)000146 (NFVO) Status: Obsolete |
IFA010 | January-2018 | Completed |
002 | Specify requirements for an interface specialized on NFVI management on the Or-Vi to support the reservation of resources at the host level. CR draft NFVIFA(18)000053 Status: Obsolete |
IFA005 | January-2018 | Completed |
003 | Specify an interface and its operations to support the reservation of resources at the host level. CR draft NFVIFA(18)000145r2 Status: Obsolete |
IFA005 | February-2018 | Completed |
004 | Extend Annex A.2 to introduce physical compute host reservation. CR draft NFVIFA(18)000205 Status: Obsolete |
IFA010 | March-2018 | Completed |
005 | Extend clause 6.3.2 Grant VNF Lifecycle Operation operation. CR draft NFVIFA(18)000206r2 Status: Obsolete |
IFA007 | March-2018 | Completed |
006 | Enhancements of capacity management due to new functionality of host reservation: - Specify a requirement for the VIM to support NFVI capacity management. - Specify a requirement for the NFVO to support NFVI capacity management. CR drafts: NFVIFA(18)000207r2 (NFVO) Status: Obsolete NFVIFA(18)000208r1 (VIM) Status: Obsolete |
IFA010 | March-2018 | Completed |
007 | Specify an interface (IFA005, clause 7.X) and its operations to support Compute Hosts Capacity Management. CR draft NFVIFA(18)000364 Status: Obsolete |
IFA005 | March-2018 | Completed |
008 | A new interface and its operations may be needed in IFA013 for notifications from the NFVO related to resource capacity shortage. CR drafts: NFVIFA(18)000365r1 Status: Obsolete NFVIFA(18)000418 Status: Obsolete |
IFA013 | March-2018 | Completed |
Issues
List of issues raised based on the feature implementation.
Security Considerations
List of security considerations implied by the feature.
FEAT05 Network Slicing
Overview
The latest version of NFV EVE Network Slicing Report (EVE012 V3.1.1) can be downloaded at EVE012.
Feature Prime | Anatoly Andrianov (Nokia), Cristina Badulescu (Ericsson), Ulrich Kleber (Huawei), Bhumip Khasnabish (ZTE) |
Feature description | EVE to IFA REL SEC Feature NFVSLICE EVE012 network slicing
Support Network Slicing by defining the necessary requirements and enhancements of interfaces, as discussed in NFV(17)000252. |
Target Release | Release 3 Drop 2 |
Impacted WIs | IFA010, IFA013, IFA014, IFA024 |
MegaCRs | MegaCR for IFA010: NFVIFA(18)000844r7_IFA010_MegaCR_FEAT05_Slicing.docx MegaCR for IFA013: NFVIFA(19)000014r1_IFA013_MegaCR_FEAT05_Slicing.docx |
Related/Dependent Features | After analysis and LS exchange with 3GPP no dependencies for the time frame of this feature are seen anymore. |
Status | Completed |
Reliability Review | Done in REL#270 on January 15, 2019 |
Security Review | Reviewed in SEC#139 on January 24, 2019 See NFVIFA(19)000054r2_FEAT05_security_considerations.docx or NFVSEC(19)000008r1_FEAT05_security_considerations.zip |
Contributions | Latest status on Feature Dashboard |
Feature team |
Anatoly Andrianov, Nokia |
Last Updated | 2019-01-28 |
Summary of decisions / agreed concepts
- Based on 3GPP's answer below, FEAT05 assumes that current NS LCM can be used by slicing to build slices and slice subnets.
- Based on 3GPP's answer below, FEAT05 can concentrate on analysing the use of NS priority only.
- Based on 3GPP's answer below, FEAT05 expects that a NS instance doesn't need to keep track of different consumers of a NS instance, but the existing multi-tenancy concept can be used by 3GPP.
- Based on 3GPP's answer below, FEAT05 closes the work on slice specific policies and multi-domain issues.
It is expected that Slice management functions can build the slices by using (instantiating) NS instances. NFV MANO is not aware of the network slices. Thus slice consumers / tenants are not known by MANO. Only the NS tenant is seen.
Depending on the use cases (contributed to an Annex for IFA010), it will be decided whether NS priorities need to be propagated to VNFM or VIM.
Overview Liaison Exchange
Specific Liaisons with 3GPP SA5 on Network Slicing
- LS to 3GPP SA5 on NFV support for Network Slicing: NFV(18)000065r2
- LS reply from 3GPP SA5 on NFV support for Network Slicing: NFV(18)000088
Summary of the answers:
- The definition of slice specific policies is not within the scope of ongoing Rel-15 work items
- Assurance data and Performance Management work item may have potential impacts on ETSI GS IFA027, but no detailed information
- 3GPP relies on the use of ETSI NFV NS concept. Current expectations are for the support of priorities at the NS level (e.g. expressed as attribute value in the NSD).
- Fixed mapping of slice tenant and NS tenant was not explicitly confirmed. Keeping track of multiple consumers doesn't seem to be necessary. 3GPP is aware of the NS tenants and will use the concept by some mapping between the slice consumer and the tenant of supporting NS(s).
- According to the answer, 3GPP is not planning to share NS instance between two slices if isolation is needed.
- 3GPP expects that slicing management will use Os-Ma-nfvo and Ve-Vnfm-em reference points only.
A second set of questions has been sent to 3GPP SA5:
- LS to 3GPP SA5 on usage of NS priority in NFV MANO in support for Network Slicing: NFV(18)000264
- LS from 3GPP SA5 as first answer: NFV(18)000276
- LS Reply to SA5 with clarifications on questions: NFV(18)000288r1
- Preparation material for requested joint call: NFVIFA(18)000964_Prep_material_for_joint_session_3GPP_SA5.pptx
- LS Reply from 3GPP SA5 containing a set of answers: NFV(18)000299_Reply_LS_from_3GPP_SA5_on_clarifications_topics_for_NFV_NS_i.zip
- Main statements, see some questions in report from FEAT05 drafting call NFVIFA(18)000995_Report_of_FEAT05_Drafting_19_November_20.docx
Reply by SA5: NFV(18)000299_Reply_LS_from_3GPP_SA5_on_clarifications_topics_for_NFV_NS_i Main issues that could be clarified:
- Priorities are meant for LCM operations and resolution of resource conflicts in case of shortage
- MANO can act autonomously using the priority values
- If priority values are the same, MANO should act “first come first served”
- There should be a top priority, i.e. one that cannot be pre-empted.
- SA5 prefers the priority as attribute in NSD-DF.
Open questions collected:
- 2.1.1: “3GPP will expect to receive a notification” might be understood that the consumer will receive the notification.
- 2.1.3: “For LCM actions on NFV NSs that potentially impacts 3GPP communication services, MANO should ask permission for such LCM actions the 3GPP management system and not use the provided NS priority” is unclear in the wording.
- What should MANO use instead if it shouldn’t use the priority?
- 2.1.3: It is unclear how NFV should know which NS would impact 3GPP communication services and not be allowed to use the priority.
- 2.1.4.1: 3GPP doesn’t acknowledge here that there might be other consumers for NS/resources that may use resources and need to be considered in the setting of priorities.
- 2.1.4.2: The wording allows also pre-emption in case a low priority NS instance is fully instantiated. Does 3GPP intend this or do they refer only to NS LCM operations being in execution at the same time concurrently?
- Should MANO use priority during autohealing and “kill” a low priority NS instance to be able to heal a high priority NS instance in a resource shortage situation?
Other Liaisons with SA5
LS received in cc, but containing valuable inputs:
- Reply LS from 3GPP SA5 on draft Recommendation Y.3103: NFV(18)000277
- LS from SA5 to GSMA informing about documents: NFV(18)000282, referenced documents are 3GPP Rel-15 TS 28.530, 3GPP Rel-15 TS 28.531, 3GPP Rel-15 TS 28.541
Liaisons with other SDOs
Reply LS from ITU-T SG13 on consent of Recommendation Y.3103 (addressing network slicing) see NFV(18)000302_Reply_LS_from_ITU-T_SG13_on_consent_of_Recommendation_Y3103
Implementation Plan
ID | Action | Impacted WG(s) | Target completion | Status |
---|---|---|---|---|
001 | Add Functional requirements to support NFVSLICE in IFA010
|
IFA010 | Jan-2019 | Completed |
002 | Identify and add new parameters for NSD to allow support of the network slice and network slice subnet.
|
IFA014 | Jan-2019 | Completed |
003 | Investigate whether any new parameters in VNFD may be needed. | IFA011 | Jan-2019 | No update needed Completed |
004 | Investigate whether any new parameters in Os-Ma-Nfvo reference point may be needed to realize NFVSLICE lifecycle capabilities which include:
- Determining the requirements on the lifecycle of the Network Service used as part of a Network Slice - Determining the requirements for the lifecycle of the Network Service used as part of a Network Slice Subnet |
IFA013 | Jan-2019 | No update needed Completed |
005 | Investigate whether any new parameters in Os-Ma-Nfvo reference point may be needed to realize NFVSLICE feature capabilities which include:
- Determining the requirements for policy handling for Network Service instance - Determining the requirements for performance and fault data handling - Determining the requirements for LCM handling
Note: According to EVE012 further analysis is necessary on whether there is any impact on the IFA013 |
IFA013 | Jan-2019 | Completed |
006 | Investigate whether any new parameters in Or-Vi reference point may be needed to realize NFVSLICE feature capabilities which include:
- Determining the resource requirements for Network Service instance - Communicating resource prioritization related data |
IFA005 | Jan-2019 | No update needed Completed |
007 | Investigate whether any new parameters in Vnfm-Vi reference point may be needed to realize NFVSLICE feature capabilities which include:
- Determining the resource requirements for VNF/C instances - Communicating resource prioritization related data |
IFA006 | Jan-2019 | No update needed Completed |
008 | Investigate whether any enhancements are needed for Application and Service Management Interface
and Information Model Specification. |
IFA012 | Jan-2019 | Completed: No change needed: Use cases will be covered in IFA010, Touchpoints in IFA024. Not necessary to re-open Document in drop 2. |
009 | Investigate whether any Security requirements may be needed to realize the following features:
Note: Affected documents to be discussed with SEC WG |
SEC012 | Jan-2019 | No update need to be initiated from FEAT05 Completed |
010 | Reliability requirements to realize the following features: - The NS instantiation which is used in the creation of a network slice instance, or in the network slice subnet instance
|
REL010 | June-2019 | Completed Delegate to REL10 No CR in drop 2 from FEAT05 |
011 | The touchpoint between NFV and network slice management functions needs to be specified. The diagram illustrating it can be found in LS from SA5 NFV(18)000282_Reply_LS_from_3GPP_SA5_on_GSMA_Network_Slicing_Use_Case_Requ
|
IFA024 | Feb-2019 | Completed |
CRs abandoned
- NFVIFA(18)000876r1_FEAT05_IFA010_priority_support_in_software_image_distributio noted in IFA
- NFVIFA(18)000104r6_FEAT05_IFA010_priority-based_NS_resource_Mngmnt_by_NFVO replaced by 732
- NFVIFA(18)000102r2_FEAT05_IFA010_priority-based_NS_resource_Mngmnt_by_VIM not needed according to SA5 LS
- NFVIFA(18)000103r2_FEAT05_IFA010_priority-based_NS_resource_Mngmnt_by_VNFM not needed according to SA5 LS
- NFVIFA(18)000101r2_FEAT05-IFA010-Arch_Level_Req_to_Support_Additional_NS_Featur Noted in IFA#129
- NFVIFA(18)000108r2_FEAT05_IFA010_policy__priority__and_isolation_based_Multiple Noted in IFA#129
- NFVIFA(18)000109_FEAT05_IFA010_policy__priority__and_isolation_based_Multiple Noted in IFA#129
- NFVIFA(18)000110_FEAT05_IFA010_policy__priority__and_isolation_based_Multiple Noted in IFA#129
- NFVIFA(18)000866r3_FEAT05_IFA010__priority_support_in_NFP_management Noted in IFA#129
- NFVIFA(18)000877r1_FEAT05_IFA010_priority_support_in_NS_performance_management Noted in IFA#129
Other Contributions
- Presentation for Webinar "Network Slicing and ETSI NFV": NFV(17)000328
- Analyse NGMN Requirements on Slicing: NFVIFA(18)000017r1
- LS from 3GPP SA5 on transport network support of network slicing management: NFV(18)000026
- LS reply to 3GPP SA5 on transport network support of network slicing management: NFV(18)000057
- LS to 3GPP SA5 on NFV support for Network Slicing: NFV(18)000065r2
- LS reply from 3GPP SA5 on NFV support for Network Slicing: NFV(18)000088
- Presentation: "Towards NFV definition for Network Slicing" NFVIFA(18)000115r1
- Presentation at the Network Slicing World Summit held in Berlin, Germany on 23rd October 2018 NFV(18)000283
- Proposals to resolve editors notes NFVIFA(18)0001138_FEAT05_IFA010_Resolving_Editors_Notes.pptx
Stage 3 Implementation Plan
ID | Action | Impacted WI(s) | Target completion | Status |
---|---|---|---|---|
001 | Add priority to NS node type.NFVSOL(19)000799r2 | SOL001 | December-2019 | Completed |
002 | Add priority to NSD.NFVSOL(19)000854 | SOL006 | December-2019 | Completed |
003 | Introduce new NsLcmCapacityShortageNotification type | SOL005 | February-2020 | Ongoing |
Issues
List of issues raised based on the feature implementation.
Security Considerations
see action 009,
see also NFVIFA(18)0001084r1_FEAT05_Security_Topics_joint_IFA_SEC_at_NFV24.pptx
Security review using the SEC006 template is available in NFVIFA(19)000054r2_FEAT05_security_considerations.docx
This evaluation was approved in SEC WG call on January 24, 2019 as NFVSEC(19)000008r1_FEAT05_security_considerations.zip and finally approved by IFA WG in IFA#136 on January 30, 2019.
FEAT06: Enhancement Network Service (NS) Package
Overview
More information and current status can be found on the wiki for FEAT06NSPackage
Feature Prime | Bhumip Khasnabish (ZTE), Haibin Chu (Ericsson) and Yaoye Zhang (Huawei) |
Feature description | An NS Package is an archive including the meta-model descriptors NSD and other files (scripts, security materials, possible rules, policies, NS over multi-tenants, etc.), that are required to manage an NS from design to test/verification to validation/certification to runtime management; the holistic end-to-end NS lifecycle, as discussed in NFV(17)000247. |
Target Release | same as DGS/NFV-SOL007 (1H-2019) |
Impacted WIs | IFA010, IFA012 (TBC), IFA013, and IFA014. Note-1: We identify the impacted specifications in IFA WG only. The impacted specifications in other WGs (e.g. SOL, TST, SEC, REL, etc) needs to be addressed separately and the chairs of SOL and TST WGs have been informed. We will follow up the impacts on SEC and REL WGs. Note-2: The impact on IFA012 is dependent on the ISG's decision whether IFA012 is released as GS or GR by the end of Y2017. |
Mega-CRs | IFA010 [not available] IFA012 [not available] IFA013 [not available] IFA014 [not available] |
Related/Dependent Features | FEATxx FEATyy |
New Specification | No new WI is expected in IFA WG. Name of New Specification in SOL WG is DGS/NFV-SOL007 (NSD file structure spec., based on NFVIFA(18)000174/NFVIFA(17)000879,
NFVSOL(17)000711 and NFV(18)000066/NFV(17)000364; created on 2018-03-01 and approved on 2018-03-12).] |
Status | Ongoing (as DGS/NFV-SOL007) |
Contributions | All feature contributions Agreed content |
Feature team | Bhumip Khasnabish (ZTE) Haibin Chu (Ericsson) Yaoye Zhang (Huawei) Maopeng Zhang (ZTE) Lingli Deng (CMCC) |
Last Updated | 2018-10-01 |
Implementation Plan
Items to consider in the implementation plan
- Detailed description what has to be done in which work item.
- Timeplan of when the team plans to conclude a particular action in the implementation plan.
ID | Action | Impacted WG(s) | Target completion | Status |
---|---|---|---|---|
001 | Add use case description of NS packaging to IFA014 Annex. CR draft NFVIFA(17)000956r10 |
IFA014 | Same as in DGS/NFV-SOL007 | Started |
002 | Update the NS packaging requirement in IFA014.Add a new clause 5.X to describe the NS packaging requirement, including the NS packaging structure, content, identification, integrity, etc. CR draft NFVIFA(17)000959r8 |
IFA014 | Same as in DGS/NFV-SOL007 | Started |
003 | Update the functional requirements on NFVO in IFA010. Add new functional requirements on NFVO about NS package management by either adding a new clause (e.g. 6.6.X) or updating the existing clause (i.e. 6.6.1). CR draft NFVIFA(17)000958r5 |
IFA010 | Same as in DGS/NFV-SOL007 | Started |
004 | Update the interface requirement on NSD or NS package management interface in IFA013. Add new requirements of NS package management interface by either adding a new clause (i.e. 5.3.X) or updating the existing clause (i.e. 5.3.1). CR draft NFVIFA(17)000947r2 |
IFA013 | Same as in DGS/NFV-SOL007 | Started |
005 | Update the existing NSD management interface or add a new NS Package management interface in IFA013. Add new operations and notifications related to NS package management interface by either adding a new clause (i.e. 7.X) or updating the existing clause (i.e. 7.2). Current PNFD management may be updated as well based on the requirement discussion in action #002. CR draft NFVIFA(17)000947r2 |
IFA013 | Same as in DGS/NFV-SOL007 | Started |
006 | Update the NSD management related chapters in IFA012, if the IFA012 is released as GS in Rel.2. CR draft [LINK] |
IFA012 | Same as in DGS/NFV-SOL007 | Open |
Issues
List of issues raised based on the feature implementation.
•Below technical issues are identified:
->Current PNFD has its own management operations, e.g. On-board PNFD, etc.
->After the concept of NS package enhancement is introduced, the issue of merging them into NS package management operations needs to be addressed.
->The issue of backward compatibility with current NSD management interface needs to be addressed.
•The impacts on SOL WG have been discussed.
A new SOL work item [DGS/NFV-SOL007 (NSD file structure spec.)] has been created based on NFVIFA(18)000174/NFVIFA(17)000879, NFVSOL(17)000711 and NFV(18)000066/NFV(17)000364
While the impacts on TST, SEC and REL WGs need to be discussed.
Security Considerations
List of security considerations implied by the feature (to be determined).
FEAT07: MANO Policy Management (MANO_PLC)
Overview
Feature Prime | Haitao Xia (Huawei) |
Feature description | This feature addresses the interface operation definition when policy management is introduced to NFV-MANO |
Target Release | Release 3 drop 1 (2018-06) |
Impacted WIs | IFA010 IFA013 IFA007 IFA008 IFA005 IFA006 |
Mega-CRs |
IFA013 MegaCR in NFVIFA(18)000429r1 (Approved) |
Related/Dependent Features | no dependency |
Status | Completed. MegaCR Index available in NFVIFA(18)000492r1 |
Contributions | All feature contributions Agreed content |
Feature team | Haitao Xia (Huawei) |
Last Updated | 2018-06-07 |
Implementation Plan
NOTE:Contributions are marked as "OBSOLETE" as all content has been migrated to the corresponding MegaCRs.
ID | Action | Impacted WG(s) | Target completion | Status |
---|---|---|---|---|
001 | Add functional requirements of policy management for the NFVO, VNFM and VIM IFA010 CRs (Status: Feature Agreed) |
IFA010 | Jan-2018 | Completed |
002 | Specify a new interface of policy management over Os-Ma-nfvo reference point, including the interface requirements, policy management operations and corresponding information model IFA013 CRs (Status: Obsolete) |
IFA013 | Mar-2018 | Completed |
003 | Derive policy management interface over Nfvo-vnfm, Ve-Vnfm, Nfvo-Vi, Vi-vnfm reference point (mirror CRs to IFA013GS) based on the output of IFA013 interface operation definition IFA007 mirror CRs (Status: Obsolete) |
IFA007/IFA008/IFA005/IFA006 | May-2018 | Completed |
004 | Define information model enhancement to the NFV descriptor (e.g., NSD) when necessary Conclusion: Based on the discussion output of NFVIFA(18)000135r1,there is no necessity to introduce policy descriptor to the NSD information model |
IFA014 | Feb-2018 | Completed |
Issues
List of issues raised based on the feature implementation.
Security Considerations
List of security considerations implied by the feature.
FEAT08: Support of composite NS across multi-domain (MANOMD_NS)
Overview
Feature Prime | Haitao Xia (Huawei), Arturo Martin de Nicolas (Ericsson) |
Feature description | This feature addresses the architectural changes needed for the support of composite network services across multiple administrative domains |
Target Release | Release 3 drop 1 (2018-06) |
Impacted WIs | IFA010 IFA030 (new deliverable) |
Mega-CRs | IFA010 MegaCR in NFVIFA(18)000425r1 (Approved) |
Related/Dependent Features | no dependency |
Status | Completed MegaCR Index available in NFVIFA(18)000515r2 New deliverable IFA030GS Approved |
Contributions | All feature contributions Agreed content |
Feature team | Haitao Xia (Huawei) Arturo Martin de Nicolas (Ericsson) Bhumip Khasnabish (ZTE) |
Last Updated | 2018-09-01 |
Implementation Plan
NOTE:Contributions are marked as "OBSOLETE" as all content has been migrated to the corresponding MegaCRs.
ID | Action | Impacted WG(s) | Target completion | Status |
---|---|---|---|---|
001 | Determine the content skeleton and input for introduction Approved contributions: |
IFA030 | Jan-2018 | Completed |
002 | Add NFVO functional requirement description derived from Table 6.3-2 of IFA028 to IFA010 IFA010 CRs (Status: Obsolete) |
IFA010 | May-2018 | Completed |
003 | Add interface requirement description of Or-Or reference point derived from Table 6.3-1 of IFA028 Approved contributions: |
IFA030 | Apr-2018 | Completed |
004 | Define Or-Or interface functions of NSD management, NS LCM, NS PM and NS FM which are derived from IFA013 GS and necessary adaptation is made Approved contributions: |
IFA030 | Apr-2018 | Completed |
005 | Define Or-Or interface functions of NS lifecycle granting and NS instance usage notification Approved contributions: |
IFA030 | Apr-2018 | Completed |
006 | Develop Or-Or operational flows as informative Annex (when necessary) Conclusion: No operational flows are expected to be included in IFA030 GS: |
IFA030 | Mar-2018 | Completed |
007 | New GS (IFA030) clean-up, EN resolution
Approved Contributions: |
IFA030 | May-2018 | Completed |
Issues
List of issues raised based on the feature implementation.
Security Considerations
List of security considerations implied by the feature.
FEAT10: Mgmt & Connectivity Multi-Site Services (MCMSS)
Overview
Feature Prime |
Hiroshi Dempo, Zarrar Yousaf (NEC) (stage 2) |
Feature description | Following the recommendations written in IFA022, this feature is to specify management requirements, interfaces and information models to support connectivity for Multi-Site Services |
Target Release | Stage 2: Release 3 drop 2 (2018-12) Stage 3: TBD |
Impacted WIs | Stage 2: IFA005, IFA007, IFA010, IFA011, IFA013, IFA014, IFA022, IFA032 Stage 3: SOL014, SOL003, SOL005, SOL001, SOL006, SOL017 |
Mega-CRs | Stage 2: - IFA005 MegaCR in NFVIFA(18)0001111r2 - IFA007 MegaCR in NFVIFA(18)0001112r4 - IFA010 MegaCR in NFVIFA(18)0001107r2 - IFA013 MegaCR in NFVIFA(18)0001110r4 - IFA014 MegaCR in NFVIFA(18)0001113r2 |
Related/Dependent Features | N/A |
New Specification | Stage 2: IFA032 Stage 3: SOL017, others TBD |
Status | Stage 2: Completed, MegaCR Index available in NFVIFA(18)0001117r3 Stage 3: Ongoing |
Contributions | All feature contributions Agreed content |
Feature team | Stage 2: - Hiroshi Dempo (NEC Europe Ltd.) - Zarrar Yousaf (NEC Europe Ltd.) - Lei Zhu (Huawei Tech (UK) Co., Ltd. - Ulrich Kleber (Huawei Tech (UK) Co., Ltd. - Marc Flauw (HPE) - Joan Triay (DOCOMO) Stage 3: - Zarrar Yousaf (NEC Europe Ltd.) - Joan Triay (DOCOMO) |
Last Updated | 2019-11-18 |
Stage 2 Implementation Plan
Items to consider in the implementation plan
- Detailed description what has to be done in which work item.
- Timeplan of when the team plans to conclude a particular action in the implementation plan.
ID | Action | Impacted WG(s) | Target completion | Status |
---|---|---|---|---|
001 | - Approve FEAT10 and new WI draft titled “Reference point between NFVO and WIM- Interface and Information Model Specification" | None | Oct-2017 | Done |
002 |
- Approve IFA022 as a stable draft
|
IFA022 | Dec-2017 | Done |
003 |
- Specify general and functional recommendations for Multi-Site Service
|
IFA010 | Jan/ 2018 | Completed |
004 |
- Specify Os-Ma-Nfvo reference point interface and information model specification for Multi-Site Service
|
IFA013 | Mar-2018 | Completed |
005 |
- Specify Or-Vi reference point interfaces and information model specification between NFVO and VIM for Multi-Site Service
|
IFA005 | Mar-2018 | Completed |
006 |
- Specify enhancements to Or-Vnfm ref. point interfaces and information model to address the case of VNF multi-site deployment. - Make relevant changes to the scope and overview sections to include the support for Multi-site Service on Or-Vnfm reference point
|
IFA007 | Mar-2018 | Completed |
007 | - Specify parameters for the VNFD file relevant for the support of Multi-Site Service
" No CRs received" |
IFA011 | May-2018 | Closed |
008 | - Specify parameters for the NSD file relevant for the support of Multi-Site Service
|
IFA014 | May-2018 | Completed |
009 |
- Specify Or-Vi reference point interfaces and information model specification between NFVO and WIM for Multi-Site Service
NOTE: As written in ID#2, naming of the ref. point is FFS. Purpose of the specification is to focus on virtualised network resource management subset of existing IFA005, and necessary extensions/enhancements particular to managing resources in the WAN |
IFA032 | May-2018 | Completed |
Issues
List of issues raised based on the feature implementation.
- All topics can start from the beginning but the progress needs to be managed on the action IDs (e.g. individual mega CRs and new deliverable basis)
- The target dates are set according to the requirement categories in IFA022 (CRs for general, functional, reference point and information element, descriptor, or new deliverable)
- Discussion for IFA032 may take more time than CRs but finalise before the 1st drop of Release 3.
Security Considerations
List of security considerations implied by the feature.
Stage 3 Implementation Plan
ID | Action | Impacted WI(s) | Target completion | Status |
---|---|---|---|---|
001 | Specification of multi-site connectivity support in SOL003: - Add specification for Multi-Site Connectivity Services: NFVSOL(19)000732. Status: open |
SOL003 | Dec. 2019 | Ongoing |
002 | Specification of multi-site connectivity support in SOL005: - Add specification for Multi-Site Connectivity Services: NFVSOL(19)000734. Status: open |
SOL005 | Dec. 2019 | Ongoing |
003 | Specification of multi-site connectivity support in SOL descriptors: - SOL001ed331 FEAT10 Add specification for Multi-Site Connectivity Services: NFVSOL(19)000792. Status: open. |
SOL001, SOL006 | Dec. 2019 | Not started |
004 | Specification of multi-site connectivity support in SOL014: - TBD |
SOL014 | TBD | Not started |
005 | Report and profiling of stage 3 solutions addressing IFA032 requirements. General structure of the report: - SOL017 skeleton: NFVSOL(19)000360r1. Status: approved at SOL#102. - SOL017 scope: NFVSOL(19)000361r1. Status: approved at SOL#102. - IFA032 Overview Clause 4.2: NFVSOL(19)000548r1. Status: approved at SOL#111 EA. - IFA032 Overview for Capacity, Performance and Fault Management interfaces for Clause 4.2: NFVSOL(19)000592. Status: approved at SOL#115. - TBD |
SOL017 | Dec. 2019 | Ongoing |
006 | Profiling of IETF ACTN stage 3 solutions addressing IFA032 requirements: - IETF ACTN Overview: NFVSOL(19)000506r3. Status: approved at SOL#115. - Clause 4.3.2.3 Mapping concepts with ACTN: NFVSOL(19)000573. Status: approved at SOL#115. - TBD |
SOL017 | Feb. 2020 | Ongoing |
007 | Profiling of TAPI stage 3 solutions addressing IFA032 requirements: - TAPI Overview: NFVSOL(19)000605r2. Status: approved at SOL#115. - TBD |
SOL017 | Feb. 2020 | Ongoing |
FEAT11: NFV_M&M (NFV-MANO management)
Overview
Feature Prime | Yaoye Zhang (Huawei) Joan Triay (DOCOMO) |
Feature description | Following the recommendations written in ETSI GR NFV-IFA 021, this feature will enable the management of the NFV Management and Orchestration functional blocks identified by the NFV Architectural Framework. |
Target Release | Release 3 drop 1 (2018-06) |
Impacted WIs | ETSI GS NFV-IFA 010 |
MegaCRs | IFA010ed311: NFVIFA(18)000576 Status: APPROVED at IFA#104 |
Related/Dependent Features | None |
New Specification | ETSI GS NFV-IFA 031 ("NFV; Management and Orchestration; Requirements and interfaces for NFV-MANO management Specification") Work Item: DGS/NFV-IFA031 |
Status | Completed |
Contributions | All feature contributions Agreed content |
Feature team | Yaoye Zhang (HUAWEI) Joan Triay (DOCOMO) Gerald Kunzmann (DOCOMO) |
Last Updated | 2018-07-30 |
Implementation Plan
ID | Action | Impacted WI(s) | Target completion | Status |
---|---|---|---|---|
001 | Specify high-level requirement for the NFV Architectural Framework to support the management of NFV-MANO functional entities. Contributions: - CR draft: NFVIFA(17)0001065 status: FEAT AGREED at IFA#79 - IFA010 megaCR FEAT11 on NFV-MANO management: NFVIFA(18)000576 Status: APPROVED at IFA#104 |
IFA010 | Nov-2017 | Completed |
002 | Specify a requirement set for the NFVO, the VNFM, as well as the VIM as a managed entity to support NFV-MANO fault, performance, configuration and information, state and log management by a managing entity. Contributions: CR draft: NFVIFA(17)0001066 status: FEAT AGREED at IFA#79 - IFA010 megaCR FEAT11 on NFV-MANO management: NFVIFA(18)000576 Status: APPROVED at IFA#104 |
IFA010 | Nov-2017 | Completed |
003 | Skeleton, scope and introduction description for the new deliverable. Contributions: - Skeleton overview/draft: NFVIFA(17)0001067r1 Status: for discussion and NOTED - Skeleton: NFVIFA(18)000009r1 Status: APPROVED at IFA#83 - Scope: NFVIFA(18)000046 status: APPROVED at IFA#84 |
IFA031 | Nov-2017 | Completed |
004 | Add description of the general framework and interfaces for NFV-MANO management using as a reference “Solution D” and “Solution E” descriptions available in clauses 7.1.4 and 7.1.5 of ETSI GR NFV-IFA 021. Contributions: - NFVIFA(17)0001068 status: APPROVED at IFA#79 - Relationship NFV-MANO services and interfaces: NFVIFA(18)000351 status: APPROVED at IFA#100 |
IFA031 | Nov-2017 | Completed |
005 | Specify a requirement set for the different interfaces to be supported, which include: - NFV-MANO fault management interface - NFV-MANO performance management interface - NFV-MANO configuration and information management interface - NFV-MANO state management interface, and - NFV-MANO log management interface. Contributions: - Requirement set: NFVIFA(17)0001069 Status: APPROVED at IFA#79 - Overview and conventions: NFVIFA(18)000085 Status: APPROVED at IFA#87 |
IFA031 | Dec-2017 | Completed |
006 | Specify the NFV-MANO functional entity information elements that will be reused in multiple interface definitions using as a reference the “Solution A” description available in clause 7.1.1 of ETSI GR NFV-IFA 021. Contributions: - For configuration and information mgmt: NFVIFA(18)000015r4 Status: APPROVED at IFA#84 - For performance mgmt: NFVIFA(18)000047r1 Status: APPROVED at IFA#84 - For state mgmt: NFVIFA(18)000086r3 Status: APPROVED at IFA#89 - For fault mgmt: NFVIFA(18)000215r2 Status: APPROVED at IFA#93 - For log mgmt: NFVIFA(18)000219r3 Status: APPROVED at IFA#98 |
IFA031 | Dec-2017 | Completed |
007 | Specify the interface for NFV-MANO configuration management using as a reference the “Solution F” description in clause 7.1.6.5 of ETSI GR NFV-IFA 021. Contributions: - Configuration I/F and related IE: NFVIFA(18)000015r4 Status: APPROVED at IFA#84 - Clause 6.2.3 adding filter for QueryConfigInfo operation: NFVIFA(18)000498 Status: APPROVED at IFA#103 |
IFA031 | Jan-2018 | Completed |
008 | Specify the interface for NFV-MANO performance management using as a reference the “Solution F” description available in clause 7.1.6.4 of ETSI GR NFV-IFA 021. Contributions: - Performance I/F and related IE: NFVIFA(18)000047r1 Status: APPROVED at IFA#84 |
IFA031 | Jan-2018 | Completed |
009 | Specify the interface for NFV-MANO fault management using as a reference the “Solution F” description available in clause 7.1.6.3 and the fault reporting information modelling in “Solution B” in clause 7.1.2 of ETSI GR NFV-IFA 021. Contributions: -Fault I/F and related IE: NFVIFA(18)000215r2 Status: APPROVED at IFA#93 |
IFA031 | Feb-2018 | Completed |
010 | Specify the interface for NFV-MANO state management using as a reference the “Solution F” description available in clause 7.1.6.6. Contributions: - State I/F and related IE: NFVIFA(18)000086r3 Status: APPROVED at IFA#89 |
IFA031 | Feb-2018 | Completed |
011 | Specify the interface for NFV-MANO log management using as a reference the “Solution F” description available in clause 7.1.6.7. Contributions - Log I/F and related IE: NFVIFA(18)000219r3 Status: APPROVED at IFA#98 |
IFA031 | Mar-2018 | Completed |
012 | Specify the definitions of performance metrics using as a reference the “Solution C” description available in clause 7.1.3 of ETSI GR NFV-IFA 021. Contributions: - Performance measurement definitions template: NFVIFA(18)000225r2 Status: APPROVED at IFA#94 - Measured objects: NFVIFA(18)000226r1 Status: APPROVED at IFA#94 - NFV-MANO entity resource measurements: NFVIFA(18)000227r1 Status: APPROVED at IFA#94 - Managed objects for performance measurements: NFVIFA(18)000292 Status: APPROVED at IFA#96 - NFV-MANO service measurements: NFVIFA(18)000293 Status: APPROVED at IFA#96 - NFV-MANO interface producer measurements: NFVIFA(18)000294r3 Status: APPROVED at IFA#98 - NFV-MANO interface consumer measurements: NFVIFA(18)000295r3 Status: APPROVED at IFA#98 - Additional managed objects: NFVIFA(18)000350r1 Status: APPROVED at IFA#100 |
IFA031 | Mar-2018 | Completed |
013 | Resolution of editor's notes and final review of the document draft. Contributions: - Clause 7 EN resolution dependency state information: NFVIFA(18)000405 Status: APPROVED at IFA#100 - Clause 7 EN resolution MANO configuration information element: NFVIFA(18)000406r1 Status: APPROVED at IFA#100 - Clause 7 EN resolution list of interfaces: NFVIFA(18)000434 Status: APPROVED at IFA#100 - Clause 6, 7, and 8 EN resolution on PmJob and Threshold Objects: NFVIFA(18)000436 Status: APPROVED at IFA#100 - Clause 8.2 adding ManoInterfaceConsumer measured object NFVIFA(18)000437r1 Status: APPROVED at IFA#100 - Clause 8 EN resolution PM description improvements: NFVIFA(18)000438r1 Status: APPROVED at IFA#100 - Adding Annex for information flows with flow related to configuration: NFVIFA(18)000449 Status: APPROVED at IFA#100 - Clause 6.2.3 adding filter for QueryConfigInfo operation: NFVIFA(18)000498 Status: APPROVED at IFA#103 - Clause 5 and 6 adding query subscriptions operations: NFVIFA(18)000499 Status: APPROVED at IFA#103 - Clause 6 EN resolution aligning terminate subscription operation: NFVIFA(18)000500 Status: APPROVED at IFA#103 - Clause 7 EN resolution information specific info objects: NFVIFA(18)000501 Status: APPROVED at IFA#103 - Clause 6 and 7 EN resolution log report condition and location: NFVIFA(18)000502 Status: APPROVED at IFA#103 - Clause 7.2.10 EN resolution ManoService and ManoInterface: NFVIFA(18)000544 Status: APPROVED at IFA#104 - Clause 7.2.4 EN resolution apiEndpoint: NFVIFA(18)000545r2 Status: APPROVED at IFA#104 - Clause 3 adding definitions and abbreviations: NFVIFA(18)000528r3 Status: APPROVED at IFA#104 - Clause 4.3 and 7.2, update description and clarifications of NFV-MANO service and interface: NFVIFA(18)000543r2 Status: APPROVED at IFA#104 - Clause 8 EN resolution and improvements to workflow measurements: NFVIFA(18)000572 Status: APPROVED at IFA#104 - Clause 8 correcting measurement unit: NFVIFA(18)000573 Status: APPROVED at IFA#104 - General consistency review: NFVIFA(18)000574 Status: APPROVED at IFA#104 - Multiple clauses deletion guideline EN: NFVIFA(18)000575 Status: APPROVED at IFA#104 - Clause 7.3.2 Change later specification statement: NFVIFA(18)000623 Status: APPROVED at IFA#104 - General consistency review for IFA031 v0.5.0: NFVIFA(18)000677 Status: APPROVED at IFA#107 - Clause 5 Consistency review alignment interface reqs: NFVIFA(18)000678 Status: APPROVED at IFA#107 - Clause 7 generalize IE clauses: NFVIFA(18)000679 Status: APPROVED at IFA#107 - Clause 7 Consistency review missing mandatory statements for notifications: NFVIFA(18)000680 Status: APPROVED at IFA#107 - Clause 7 Consistency review writable attributes: NFVIFA(18)000681r1 Status: APPROVED at IFA#107 - Clauses 5 and 7 Clean-up related heartbeat functionality and addressing and EN: NFVIFA(18)000682 Status: APPROVED at IFA#107 |
IFA031 | May-2018 | Completed |
014 | Review of security aspects. Security-related editor's notes are available throughout the IFA031 GS draft. The contributions needed to resolve those editor's notes which are specific to security topics will be listed here. Contributions: - Clause 9 security considerations: NFVIFA(18)000538r2 Status: APPROVED at IFA#108 - Multiple clauses EN resolution consumer and securityInfo: NFVIFA(18)000578r1 Status: APPROVED at IFA#104 |
IFA031 | Jun-2018 | Completed |
Word version of the implementation plan in contribution NFVIFA(17)000897r1 (check for latest revision). It is very likely that the information contained in this wiki is more recent and updated more frequently.
Issues
List of issues raised based on the feature implementation.
With regards to specific planning action:
- CLOSED: Action 004: description is deemed complete, but needs to be checked with some additional clarification or references to possible informative flows are needed.
- Status: completed. Additional content was added as part of action 013.
- CLOSED: Action 007: main content is available and approved, but some editor's notes need to be resolved (see action 013).
- Status: completed. Additional content was added as part of action 013.
- CLOSED: Action 008: main content is available and approved, but some editor's notes need to be resolved (see action 013).
- Status: completed. Contributions addressing the editor's notes have been approved.
- CLOSED: Action 010: main content is available and approved, but some editor's notes need to be resolved (see action 013).
- Status: completed. Contributions addressing the editor's notes have been approved.
- CLOSED: Action 004/006/008/010/011: need to analyze and define the relationship of NFV-MANO Service and interfaces.
- Status: completed. Additional content was added as part of action 013.
- CLOSED: Action 009: main content is available and approved, but some editor's notes need to be resolved (see action 013).
- Status: completed. Contributions addressing the editor's notes have been approved.
- CLOSED: Action 009: the "heartbeat" functionality was deleted in the approved FM interface and IE contribution (see NFVIFA(18)000215r2). It needs to be resolved how the heartbeat functionality relates to fault management, or whether it needs a specific interface for it.
- Status: contributions providing a new interface to handle the heartbeat functionality were available, but they were not discussed. The technical assessment and discussion would be postponed to later IFA031 releases, in order to make sure the completion of a stable version of IFA031 for the Rel. 3 drop #1 (1H2018).
- CLOSED: Action 011: main content is available and approved, but some editor's notes need to be resolved (see action 013).
- Status: completed. Contributions addressing the editor's notes have been approved.
- CLOSED: Action 012: main content is available and approved, but some editor's notes need to be resolved (see action 013).
- Status: completed. Additional content was added as part of action 013.
Other issues:
- CLOSED: (Jan. 2018) At IFA#84 F2F meeting: discussed the possibility of having some informative information flows to show examples on how the interfaces can be used. An Annex could be added.
- Status: completed. An annex has been added to add informative information flows. Refer to contribution NFVIFA(18)000449.
Security Considerations
List of security considerations implied by the feature.
- CLOSED: As captured in some editor's notes in clause 6: Editor’s Note: actors in the operations are “consumer” and “NFV-MANO functional entity”. The consumer is intended to be an authorized consumer, thus, not all possible consumers may be authorized to access all operations. Further description and analysis about this is expected to be part of the “Security Considerations” clause.
- Status: completed. Additional content was added as part of action 014, and in particular with contribution NFVIFA(18)000578r1.
- Action 014 (added in May 2018) to list specific security related contributions.
FEAT15: VNF Snapshotting
Overview
Feature Prime | Jörg Aelken (Ericsson LM) (stage 2) Joan Triay (DOCOMO) (stage 3) |
Feature description | The VNF_PHOTO is a feature that has been investigated and described in the published ETSI GR NFV-TST 005. A VNF Snapshot is a replication of a VNF instance at a specific point in time with a corresponding VNF Snapshot Package which is collection of files representing a VNF Snapshot. The feature implementation enables operations on and management of VNF Snapshots and their corresponding packages. |
Target Release | Stage 2: Release 3 drop 1 (2018-06) Stage 3: TBD |
Impacted WIs | Stage 2: IFA005, IFA006, IFA007, IFA008, IFA010, IFA011, IFA013 Stage 3: SOL002, SOL003, SOL005, SOL001, and new SOL010 |
MegaCRs | Stage 2 - IFA005: NFVIFA(18)000559 Status: Approved MegaCR; Implemented in: IFA005ed311 draft version 3.0.1 - IFA006: NFVIFA(18)000560 Status: Approved MegaCR; Implemented in: IFA006ed311 draft version 3.0.1 - IFA007: NFVIFA(18)000561r3 Status: Approved MegaCR; Implemented in: IFA007ed311 draft version 3.0.2 - IFA008: NFVIFA(18)000535r2 Status: Approved MegaCR; Implemented in: IFA008ed311 draft version 3.0.1 - IFA010: NFVIFA(18)000539 Status: Approved MegaCR; Implemented in: IFA010ed311 draft version 3.0.3 - IFA011: NFVIFA(18)000540r1 Status: Approved MegaCR; Implemented in: IFA011ed311 draft version 3.0.2 - IFA013: NFVIFA(18)000541r1 Status: Approved MegaCR; Implemented in: IFA013ed311 draft version 3.0.3 |
Related/Dependent Features | N/A |
New Specification | Stage 2: Not required Stage 3: SOL010 (VNF Snapshot Package specification) |
Status | Stage 2: Completed Stage 3: Ongoing (60%) |
Contributions | All feature contributions Agreed content |
Feature team | Stage 2: - Bertrand Souville (DOCOMO) - Gerald Kunzmann (DOCOMO) - Jörg Aelken (Ericsson LM) Stage 3: - Joan Triay (DOCOMO) - Manchang Ju (ZTE) - Yuya Kuno (DOCOMO) |
Last Updated | 2018-10-09 |
Stage 2 Implementation Plan
ID | Action | Impacted WI(s) | Target completion | Status |
---|---|---|---|---|
001 | Add functional requirements on the NFVO (IFA010 6.2.x) to support granting for VNF/VNFC Snapshot operations, based on Clause 7.2.1 in TST005 (recommendation Nfvo.001). CR draft NFVIFA(17)0001010r1 Status: obsolete |
IFA010 | November-2017 | Completed |
002 | Add functional requirements on the VNFM (IFA010 7.x) to support VNF/VNFC Snapshot operations and VNF/VNFC Snapshot Packaging, based on Clause 7.2.2 in TST005 (recommendations Vnfm.001 to Vnfm.009). CR draft NFVIFA(17)0001021r2 Status: obsolete |
IFA010 | November-2017 | Completed |
003 | Add functional requirements on the VIM (IFA010 8.x) to support virtualized resource Snapshot capabilities based on Clause 7.2.3 in TST005 (recommendations Vim.001 and Vim.002). CR draft NFVIFA(17)0001032r4 Status: obsolete |
IFA010 | November-2017 | Completed |
004 | Add requirement on Virtualised Resources Management interface on the Or-Vi reference point (IFA005 clause 5.3.5) to support attaching/detaching Volumes to virtualized compute resources, based on Clause 7.5.2 in TST005 (recommendations OrVi-Vcrm.001 and OrVi-Vcrm.002). CR draft NFVIFA(18)000030 Status: obsolete |
IFA005 | December-2017 | Completed |
005 | Add new operation for attaching/detaching Volumes, including new information elements, to Virtualized Compute Resources Management interface (IFA005 clause 7.3.1.x), based on Clause 7.5.2 in TST005 (recommendations OrVi-Vcrm.001 and OrVi-Vcrm.002). CR draft NFVIFA(18)000031r1 Status: obsolete |
IFA005 | December-2017 | Completed |
006 | Add values to the computeOperation parameter descriptions of the OperateComputeRequest and OperateComputeResponse of the Virtualized Compute Management interface (IFA005 clause 7.3.1.6) to support quiescing/unquiescing and reverting to Snapshot virtualised compute resources, based on Clause 7.5.2 in TST005 (recommendations OrVi-Vcrm.003 to OrVi-Vcrm.005). CR draft NFVIFA(17)0001082 Status: obsolete |
IFA005 | December-2017 | Completed |
007 | Add value to the storageOperation parameter description of the OperateStorageRequest of the Virtualized Storage Management interface IFA005 clause 7.5.1.6.2) to support reverting to Snapshot virtualised storage resources, based on Clause 7.5.2 in TST005 (recommendation OrVi-Vsrm.001). CR draft NFVIFA(17)0001083 Status: obsolete |
IFA005 | December-2017 | Completed |
008 | Mirror requirements from IFA005 towards IFA006, i.e. - Add requirement on Virtualised Resources Management interfaces on the Vi-Vnfm reference point (IFA006 clause 5.3.3) to support attaching/detaching Volumes to virtualized compute resources, based on Clause 7.5.1 in TST005 (recommendations ViVnfm-Vcrm.001 and ViVnfm-Vcrm.002). CR draft NFVIFA(18)000033 Status: obsolete - Add new operation for attaching/detaching Volumes, including information elements, to Virtualized Compute Resources Management interface (IFA006 clause 7.3.1.x), based on Clause 7.5.1 in TST005 (recommendations ViVnfm-Vcrm.001 and ViVnfm-Vcrm.002). CR draft NFVIFA(18)000035r1 Status: obsolete - Add values to the computeOperation parameter descriptions of the OperateComputeRequest and OperateComputeResponse of the Virtualized Compute Management interface (IFA006 clause 7.3.1.6) to support quiescing/unquiescing and reverting to Snapshot virtualised compute resources, based on Clause 7.5.1 in TST005 (recommendations ViVnfm-Vcrm.003 to ViVnfm-Vcrm.005). CR draft NFVIFA(17)0001084 Status: obsolete - Add value to the storageOperation parameter description of the OperateStorageRequest of the Virtualized Storage Management interface (IFA006 clause 7.5.1.6.2) to support reverting to Snapshot virtualised storage resources, based on Clause 7.5.1 in TST005 (recommendation ViVnfm-Vsrm.001). CR draft NFVIFA(17)0001085 Status: obsolete |
IFA006 | December-2017 | Completed |
009 | Add a requirement on the Or-Vnfm reference point (IFA007 clause 5.2) to support a Snapshot Package Management interface produced by the VNFM, based on Clause 7.5.3 in TST005 (recommendation Or-Vnfm.001) and Clause 7.5.4 in TST005 (recommendation OrVnfm-Vspm.001). CR draft NFVIFA(18)000006r2 Status: obsolete |
IFA007 | January-2018 | Completed |
010 | Add requirements on a new Snapshot Package Management interface on the Or-Vnfm reference point (IFA007 clause 5.3.x) to support VNF Snapshot Package operations, based on Clause 7.5.4 in TST005 (recommendations OrVnfm-Vspm.002 to OrVnfm-Vspm.005). CR draft NFVIFA(18)000007r4 Status: obsolete |
IFA007 | January-2018 | Completed |
011 | Add new Snapshot Package Management interface specification (IFA007 clause 7.x) to support VNF Snapshot Package operations, based on Clause 7.5.4 in TST005 (recommendations OrVnfm-Vspm.002 to OrVnfm-Vspm.005). CR draft NFVIFA(18)000008r16 Status: obsolete |
IFA007 | January-2018 | Completed |
012 | Add a requirement on the Ve-Vnfm-vnf reference point (IFA008 clause 5.3.0) to support a VNF Snapshot Notification interface produced by the VNFM, based on Clause 7.5.5 in TST005 (recommendation Ve-Vnfm-vnf.001) and Clause 7.5.6 in TST005 (recommendation VeVnfmvnf-Vsn.001). Status: Not needed according to alternative solution (see note) |
IFA008 | January-2018 | Not needed |
013 | Add requirements on the Ve-Vnfm-em and Ve-Vnfm-vnf reference points (IFA008 clause 5.2.1.1 and 5.3.1.1) to support receiving confirmations upon sent VNF lifecycle management operation occurrence notifications related to VNF Snapshots to enable the continuation or abortion of a VNF Snapshot operation after required modifications in the VNF triggered by the notification. This solution was preferred over and replaces the original intended solution of adding requirements on a new VNF Snapshot Notification interface on the Ve-Vnfm-vnf reference point (IFA008 clause 5.3.1.x) to support VNF Snapshot notifications, based on Clause 7.5.6 in TST005 (recommendations VeVnfmvnf-Vsn.002 and VeVnfmvnf-Vsn.003). (see note) CR draft NFVIFA(18)000012 Status: obsolete |
IFA008 | January-2018 | Completed |
014 | Add specifications on the VNF Lifecycle Management interface (IFA008 clause 7.2.x) to receive confirmations upon sent VNF lifecycle management operation occurrence notifications related to VNF Snapshot to enable the continuation or abortion of a VNF Snapshot operation after required modifications in the VNF triggered by the notification. This solution was preferred over and replaces the original intended solution of adding a new VNF Snapshot Notification interface specification (IFA008 clause 7.x) to support VNF Snapshot notifications, based on Clause 7.5.6 in TST005 (recommendations VeVnfmvnf-Vsn.002 and VeVnfmvnf-Vsn.003). (see note) CR draft NFVIFA(18)000013 Status: obsolete |
IFA008 | January-2018 | Completed |
015 | Add requirements on VNF Lifecycle Management interface on the Ve-Vnfm-em reference point (IFA008 clause 5.2.1.1) to support querying/deleting available VNF/VNFC Snapshot information and to support create/revert to VNF/VNFC Snapshot operations, based on Clause 7.5.7 in TST005 (recommendations VeVnfmem-Vlm.001 and VeVnfmem-Vlm.002). CR draft NFVIFA(18)000070r1 Status: obsolete |
IFA008 | January-2018 | Completed |
016 | Add new operations for querying/deleting information on available VNF/VNFC Snapshots and creating/reverting to VNF/VNFC Snapshots, including information elements, to VNF Lifecycle Management interface (IFA008 clause 7.2.x), based on Clause 7.5.7 in TST005 (recommendations VeVnfmem-Vlm.001 and VeVnfmem-Vlm.002). CR draft NFVIFA(18)000071r2 Status: obsolete |
IFA008 | January-2018 | Completed |
017 | Add requirements on NS Lifecycle Management interface on the Os-Ma-Nfvo reference point (IFA013 clause 5.3.2) to support querying/deleting available VNF/VNFC Snapshot information and to support create/revert to VNF/VNFC Snapshot operations, based on Clause 7.5.8 in TST005 (recommendations OsMaNfvo-Nslm.001 and OsMaNfvo-Nslm.002). CR draft NFVIFA(18)000230r3 Status: obsolete |
IFA013 | February-2018 | Completed |
018 | Add new values to the updateType for deleting VNF Snapshot information and for creating/reverting to VNF Snapshots and new parameters, including information elements, to the Update NS operation of the NS Lifecycle Management interface (IFA013 clause 7.3.5), based on Clause 7.5.8 in TST005 (recommendations OsMaNfvo-Nslm.001 and OsMaNfvo-Nslm.002). CR draft NFVIFA(18)000231r5 Status: obsolete |
IFA013 | February-2018 | Completed |
019 | Add Opconfig Information Elements to enable the configuration of LCM snapshot operations (IFA011 clause 7.1.5). CR draft NFVIFA(18)000457 Status: obsolete |
IFA011 | March-2018 | Completed |
020 | Add new events to the LifeCycleManagementScript related to VFN Snapshotting (IFA011 clause 7.1.13). CR draft NFVIFA(18)000458r1 Status: obsolete |
IFA011 | March-2018 | Completed |
021 | Add a new attribute to the Vdu information element (IFA011 clause 7.1.6.2.2) with a content of a new information element for VNFC Snapshot descriptor. CR draft not required for Release 3 drop 1. The additional VNFC Snapshot properties are not required for a complete VNF Snapshot feature implementation. For further study which properties are needed and which of them are required to be modifiable, might be added as maintenance CR later. |
IFA011 | March-2018 | Not needed |
022 | Add the specification of a new information element for a VNFC Snapshot descriptor (IFA011 clause 7.1.6.x), based on Clause 7.3 in TST005 (recommendations Vnfsd.005 to Vnfsd.016). CR draft not required for Release 3 drop 1. The additional VNFC Snapshot properties are not required for a complete VNF Snapshot feature implementation. For further study which properties are needed and which of them are required to be modifiable, might be added as maintenance CR later. |
IFA011 | March-2018 | Not needed |
023 | Mirror VNF lifecycle management interface extensions for Snapshots from IFA008 to IFA007: - Add requirements on VNF Lifecycle Management interface on the Or-Vnfm reference point (IFA007 clause 5.3.4) to support querying/deleting available VNF Snapshot information and to support create/revert to VNF Snapshot operations. CR draft NFVIFA(18)000126r1 Status: obsolete - Add new operations for querying/deleting information on available VNF Snapshots and creating/reverting to VNF Snapshot, including information elements, to VNF Lifecycle Management interface (IFA007 clause 7.2.x). CR draft NFVIFA(18)000127r3 Status: obsolete |
IFA007 | February-2018 | Completed |
024 | Extend the Grant VNF Lifecycle Operation operation of the VNF Lifecycle Operation Granting interface (IFA007 clause 6.3.2) to support granting of VNF Snapshot operations. CR draft NFVIFA(18)000144 Status: obsolete |
IFA007 | February-2018 | Completed |
025 | Mirror VNF Snapshot Package Management interface specifications from IFA007 to IFA013: - Add a requirement on the Os-Ma-nfvo reference point (IFA013 clause 5.2) to support a VNF Snapshot Package Management interface produced by the NFVO. CR draft NFVIFA(18)000130r2 Status: obsolete - Add requirements on a new Snapshot Package Management interface on the Os-Ma-nfvo reference point (IFA013 clause 5.3.x) to support VNF Snapshot Package operations. CR draft NFVIFA(18)000131r4 Status: obsolete - Add new Snapshot Package Management interface specification (IFA013 clause 7.x) to support VNF Snapshot Package operations. CR draft NFVIFA(18)000132r8 Status: obsolete |
IFA013 | February-2018 | Completed |
026 | Mirror trigger conditions for VnfLcmOperationOccurrenceNotification from IFA008 to IFA007: - Add trigger conditions for VnfLcmOperationOccurrenceNotification for create and revert-to VNF Snapshots to information elements and notifications related to VNF Lifecycle Changes (IFA007 clause 8.6.2.2). CR draft NFVIFA(18)000281 Status: obsolete |
IFA007 | April-2018 | Completed |
027 | Add description on filters and attributes for VNF Snapshot information, including information elements, to the Query NS operation of the NS Lifecycle Management interface (IFA013 clauses 7.3.6 and 8.3.3). CR draft NFVIFA(18)000284r1 Status: obsolete |
IFA013 | April-2018 | Completed |
028 | Add support of a VNFC Snapshot Package Management interface to Ve-Vnfm-em reference point: - Add requirements on a new VNFC Snapshot Package Management interface on the Ve-Vnfm-em reference point (IFA008 clause 5.2.x). CR draft NFVIFA(18)000424 Status: obsolete - Add specification of the VNFC Snapshot Package Management interface on the Ve-Vnfm-em reference point (IFA008 clauses 7.X, 9.Y). CR draft NFVIFA(18)000460r1 Status: obsolete |
IFA008 | May-2018 | Completed |
029 | Add support for requesting transfer of VNF Snapshot Package image artefacts from the NFVO towards the VIM. CR draft not required for Release 3 drop 1. The information on the image artifacts is already included in the information element VnfcSnapshotImageInfo, available after package upload. The NFVO can access this IE after the extraction of the package is requested and can then transfer the images from the VIM using the provided access information. |
IFA007 | May-2018 | Not needed |
030 | Add support for granting of VNF Snapshot Package operations. CR draft not required for Release 3 drop 1. Current assumption is that it is not needed, but instead the NFVO is expected to validate incoming requests based on policies/VNFD and only forwards allowed requests to the VNFM. Might be needed for Snapshot Package management exposed towards EM (IFA008). For further study, might be added as maintenance CR later. |
IFA013 | May-2018 | Not needed |
NOTE: An alternative solution for a VNF Snapshot Notification Interface in IFA008 could be to add a new VNF Snapshot notification type to the VNF LCM interface. The final solution will be developed when working on the items for IFA008. After investigation of the alternative, it was decided to implement this alternative by re-using the VNF lifecycle notification interface and adding an operation to enable the VNF/EM to confirm the received notification concerning VNF snapshotting. |
Stage 3 Implementation Plan
ID | Action | Impacted WI(s) | Target completion | Status |
---|---|---|---|---|
001 | Specification of VNF snapshot operations in the VNF LCM API of SOL003: - Adding snapshot operations and flows: NFVSOL(18)000638r1. Status: approved - Adding snapshot related resources and methods NFVSOL(18)000639r1. Status: approved - Adding snapshot related data types: NFVSOL(18)000640r1. Status: approved - Adding revert snapshot operation: NFVSOL(19)000249. Status: approved - Fixes to the create VNF snapshot task: NFVSOL(19)000298r1. Status: approved - Fixes to VNF snapshot data types: NFVSOL(19)000299. Status: approved - Improving the snapshot creation process: NFVSOL(19)000353r2. Status: approved |
SOL003 | Dec. 2019 | Clompleted |
002 | Specification of VNF snapshot operations in the VNF LCM API of SOL002 (mostly mirroring SOL003): - Adding snapshot operations, flows, resources and data types: NFVSOL(19)000233. Status: approved - Adding snapshot operations, flows, resources and data types related to revert to snapshot: NFVSOL(19)000339. Status: approved - Mirror of 299: fixes to VNF snapshot data types: NFVSOL(19)000518. Status: approved - Mirror of 353r2: Improving snapshot creation process: NFVSOL(19)000519. Status: approved - Bug fix on top of 233 and 339: NFVSOL(19)000520. Status: approved |
SOL002 | Dec. 2019 | Completed |
003 | Specification of VNF snapshot operations in the NS LCM API of SOL005: - Adding snapshot operations and data types as part of NS LCM: NFVSOL(19)000252r1. Status: approved - Data types for DeleteVnfSnapshotData and RevertVnfToSnapshotData: NFVSOL(19)000335. Status: approved |
SOL005 | Dec. 2019 | Ongoing |
004 | Specification of VNF snapshot package operations in the SOL003: - New clause for the VNF Snapshot Pkg API: NFVSOL(19)000288r1. Status: approved - Adding resource structure and methods for VNF Snapshot Pkg API: NFVSOL(19)000289r1. Status: approved - Flows, resource, methods and data types for VNF snapshot pkg mgmt creation: NFVSOL(19)000290. Status: approved - Flows, resource, methods and data types for VNF snapshot pkg mgmt query, update and delete: NFVSOL(19)000291r1. Status: approved - Flows, resource, methods and data types for VNF snapshot pkg mgmt upload and fetch: NFVSOL(19)000292r1. Status: approved - Flows, resource, methods and data types for VNF snapshot pkg mgmt fetch artifact: NFVSOL(19)000293. Status: approved - Flows, resource, methods and data types for VNF snapshot pkg mgmt build: NFVSOL(19)000294r1. Status: approved - Flows, resource, methods and data types for VNF snapshot pkg mgmt extract: NFVSOL(19)000354r1. Status: approved |
SOL003 | Dec. 2019 | Completed |
005 | Specification of the VNFC snapshot package management interface in SOL002: - TBD |
SOL002 | Dec. 2019 | Not started |
006 | Specification of the VNF snapshot package management interface in SOL005: - TBD |
SOL005 | Dec. 2019 | Not started |
007 | Specification of the VNF snapshot related operations in the VNFD and NSD of SOL001: - TBD |
SOL001 | Dec. 2019 | Not started |
008 | Specification of the VNF snapshot related operations in the VNFD and NSD of SOL006: - TBD |
SOL006 | Dec. 2019 | Not started |
009 | Specification of the VNF snapshot packaging: - SOL010 skeleton: NFVSOL(18)000599. Status: approved - SOL010 scope: NFVSOL(18)000600. Status: approved - Adding references: -- NFVSOL(18)000601. Status: approved -- NFVSOL(18)000648. Status: approved - Definitions and concepts: -- NFVSOL(19)000122r1. Status: approved -- NFVSOL(18)000719r3. Status: open -- NFVSOL(19)000258. Status: open - High-level VNF snapshot package format and structure requirements (clause 4.1 and 4.2): -- NFVSOL(18)000646. Status: approved -- NFVSOL(18)000647r3. Status: approved - VNF snapshot package file contents (clause 4.3): -- NFVSOL(19)000238r1. Status: approved -- NFVSOL(19)000244r2. Status approved -- NFVSOL(19)000056. Status: open - Security aspects of VNF snapshot package: -- TBD - Examples and annexes: -- NFVSOL(18)000748r3. Status: open |
SOL010 | Dec. 2019 | Ongoing |
Issues
List of issues raised based on the feature implementation.
Security Considerations
List of security considerations implied by the feature.
FEAT12: Enhancement support for MEC in NFV deployments
Overview
Feature Prime | Uwe Rauschenbach, Nokia |
Feature description | Update to selected NFV interfaces. The intent is to define extensions which can be used to specify how ETSI MEC can be deployed in an NFV environment, allowing to run MEC applications on the NFVI besides
VNFs, and re-using ETSI NFV MANO components to perform common MANO tasks on the MEC applications. 3 parts:
|
Target Release | Release 3 (2019) |
Impacted WIs | IFA013, IFA008, IFA011, SOL005, SOL002, SOL004 |
MegaCRs | For part 3: Related content already included in Rel 2 maintenance (V 2.4.1)
For part 2
For part 1
|
Related/Dependent Features | FEAT15 (LCM coordination interface that is part of VNF Snapshot) |
Status | Ongoing (70% complete) |
Contributions | All feature contributions
|
Feature team | Uwe Rauschenbach, Nokia
Yang Xu, Huawei Pekka Kuure, Nokia Anatoly Andrianov, Nokia |
Last Updated | 2019-02-18 |
Implementation Plan
Items to consider in the implementation plan
- Detailed description what has to be done in which work item.
- Timeplan of when the team plans to conclude a particular action in the implementation plan.
ID | Action | Impacted WI(s) | Target completion | Status |
001 | Add needed MEC extensions to IFA013 (placement control). | IFA013 | tbd | Open |
002 | Add needed MEC extensions to SOL005 (placement control). | SOL005 | tbd | Open |
003 | Add requirement for 3rd party VNF package extension mechanism to IFA011. | IFA011 | Feb 2018 | Complete |
004 | Add specification for 3rd party VNF package extension mechanism to SOL004. | SOL004 | Feb 2018 | Complete |
005 | Add needed MEC extensions to IFA008 (graceful termination). | IFA008 | Feb 2019 | Complete, pending MEC confirmation |
006 | Add needed MEC extensions to SOL002 (to allow standardizing graceful termination). | SOL002 | tbd | Open |
Issues
Delay on MEC side in providing requirements.
Security Considerations
List of security considerations implied by the feature.
FEAT13: Report on Architectural enhancement for VNF License Management support and use of VNF licenses
Overview
Feature Prime | Abinash Vishwakarma, Netcracker |
Feature description | IFA034 work will perform impact analysis of VNF Licenses on the NFV-MANO. The output of this work will be used to create CRs on the NFV-MANO.
Initial study of License Management was done by EVE010, the output of EVE010 will be used as baseline for this IFA034. |
Target release | Release 3 drop 3 |
Impacted WIs | |
MegaCRs | TODO, will be based on the IFA034 report |
Related/Dependent Features | NA |
Status | Ongoing 20% |
Contributions | |
Feature team | Abinash Vishwakarma (Netcracker)
Janusz, Pieczerak, Orange Etienne, Steinert, Orange Oliver, Le Grand, Orange Anne-Marie Praden, Gemalto Martin, Liepert, Gemalto |
Last update | 2019-04-16 |
FEAT16: Service Availability Level
Overview
Feature Prime | Stefan Arntzen (Huawei) |
Feature description | This feature adds the functions needed to assign resources with defined reliability characteristics to NSs with special reliability requirements. It also allows to achieve an optimized assignment of resources with defined availability characteristics to multiple VNFs and NSs (belonging to the same slice) |
Target Release | Stage 2: Release 3 drop 3 (2019-06)
Stage 3: Release 3 (2019-12) |
Impacted WIs | Stage 2: IFA010, IFA014 |
MegaCRs | Stage 2:
IFA010: NFVIFA(19)000480r8 Approved by email on July 15 Stage 3: <tbd> |
Related/Dependent Features | N/A |
Status | Stage 2: Approved in IFA#160; MegaCR Index available in NFVIFA(19)000746
Stage 3: Not started |
Contributions | All feature contributions Agreed content |
Feature team | Shaoji Ni (Huawei) Maria Toeroe(Ericsson) Gerald Kunzmann (DOCOMO) Stefan Arntzen (Huawei) Janusz Pieczerak (Orange) Chidung Lac (Orange) |
Last Updated | 2019-07-16 |
Stage 2 Implementation Plan
ID | Action | Impacted WG(s) | Target completion | Status |
---|---|---|---|---|
001 | Add terminology of the “service availability level (SAL)” and explain difference between FEAT05 Slicing
NFVIFA(19)000402r3 Status: Agreed FEAT (IFA#159) |
IFA010 | June-2019 | Completed |
002 | Specify requirements for the VIM to support the capability for supporting SAL for the assignment/reservation of resources. Specify requirements for the NFVO/VNFM to support SAL for requesting the assignment/reservation of resources.
NFVIFA(19)000296r1 Status: Noted (IFA#145) NFVIFA(19)000306r5 Status: Agreed FEAT (IFA#150) NFVIFA(19)000307r7 Status: Agreed FEAT (IFA#149) NFVIFA(19)000309r2 Status: Agreed FEAT (IFA#148) NFVIFA(19)000310r5 Status: Agreed FEAT (IFA#148) NFVIFA(19)000311r2 Status: Agreed FEAT (IFA#148) NFVIFA(19)000482r1 Status: Agreed FEAT (IFA#154)
NFVIFA(19)000502r9 Status: Agreed FEAT (IFA#156) NFVIFA(19)000590r4 Status: Agreed FEAT (IFA#157) |
IFA010 | June-2019 | Completed |
003 | Specify requirements for an NFVI resource management on the Or-Vi/Vi-Vnfm to support SAL for the assignment/reservation of resources. | IFA005/006 | December-2018 | Stopped. Not part of release 3 |
004 | Add the parameter of SAL into “VnfDF”, “vdu profile”, “VirtualLinkDescFlavour” of VNFD
|
IFA011 | December-2018 | Stopped |
005 | Add a requirement and the parameter of SAL into “Network service deployment flavour” of NSD
NFVIFA(19)000355r4 Status: Agreed FEAT (IFA#152) NFVIFA(19)000397r2 Status: Agreed FEAT (IFA#152) NFVIFA(19)000547r5 Status: Agreed FEAT (IFA#155) |
IFA014 | June-2019 | Completed |
006 | Specify operations of the assignment/reservation of resources in Or-Vi/Vi-Vnfm/Or-Vnfm/Ve-Vnfm interfaces to support SAL by adding the parameter of “SAL” into the Virtual resource assignment/reservation requests
NFVIFA(19)000399r3 Status: Agreed FEAT (IFA#152) NFVIFA(19)000408r2 Status: Agreed FEAT (IFA#152) NFVIFA(19)000417r6 Status: Agreed FEAT (IFA#152) NFVIFA(19)000419r4 Status: Agreed FEAT (IFA#152) NFVIFA(19)000472 Status: Agreed FEAT (IFA#155) NFVIFA(19)000474 Status: Agreed FEAT (IFA#155) NFVIFA(19)000467r1 Status: Agreed FEAT (IFA#154) NFVIFA(19)000466r4 Status: Agreed FEAT (IFA#155) NFVIFA(19)000473r2 Status: Agreed FEAT (IFA#155) |
IFA005/006/007/008 | February-2019 | Stopped. Not part of release 3 |
Stage 3 Implementation Plan
Items to consider in the implementation plan
- Detailed description what has to be done in which work item.
- Timeplan of when the team plans to conclude a particular action in the implementation plan.
SOL
ID | Action | Impacted WG(s) | Target completion | Status |
---|---|---|---|---|
001 | Add interface X in to SOL001. CR draft [LINK] | SOL | March-2018 | Open |
Issues
List of issues raised based on the feature implementation.
Security Considerations
List of security considerations implied by the feature are described in: NFVSEC(19)000085r1 Status: agreed in SEC#151
FEAT17: Cloud-Native VNFs and Container Infrastructure management
Overview
Feature Prime | Jörg Aelken (Ericsson LM) Ulrich Kleber (Huawei Technologies Co.,Ltd) |
Feature description | The scope of the feature covers the following areas: - NFV Architecture support for VNFs which follow “cloud-native” design principles. |
Target Release | Stage 2 Step 1: Release 4 Drop #1 (after NFV#30e, July 2020) Stage 2 Step 2: Release 4 Drop #2 (NFV#31, September 2020) Stage 3: Release 4 (target date tbd) |
Impacted WIs | Stage 2: IFA007, IFA008, IFA010, IFA011, IFA013 Stage 3: tbd |
MegaCRs | Stage 2 Step 1: IFAxxx MegaCR NFVIFA(19)000xxx (CR Status) Stage 2 Step 2: Stage 3: |
Related/Dependent Features | FEAT19 – NFV-Conn FEAT23 – MANO-SBA |
New Specification | Stage 2 Step 1: DGS/NFV-IFA040 - Requirements for service interfaces and object model for OS container management and orchestration specification Stage 2 Step 2: Stage 3: tbd |
Status |
Stage 2 Step 1: Ongoing (75% completed) |
Contributions | All feature contributions |
Feature team | Stage 2: Ulrich Kleber (Huawei Technologies Co.,Ltd) Jörg Aelken (Ericsson LM) Stage 3: Name (Company) |
Last Updated | 2020-05-04 |
Stage 2 Implementation Plan
Items to consider in the implementation plan
- Detailed description what has to be done in which work item.
- Timeplan of when the team plans to conclude a particular action in the implementation plan.
ID | Action | Impacted WI(s) | Target completion | Status |
---|---|---|---|---|
FEAT17 Stage 2 - Step 1 | ||||
ST2-001 | Skeleton, scope, and term definitions for IFA040 (Clauses 1, 2, 3)
CR drafts: |
IFA040 | October - 2019 | Complete |
ST2-002 | Overview and framework for OS container management and orchestration (Clause 4)
CR drafts: |
IFA040 | November - 2019 | Complete |
ST2-003 | Skeleton and scope for IFA036 (Clause 1)
CR drafts: |
IFA036 | October - 2019 | Complete |
ST2-004 | Enhance the VNFD and its VDU information element with attributes/information elements for the OS container resource model
CR drafts: |
IFA011 | February - 2020 | Complete |
ST2-005 | OS container NFV object model (Clause 5)
CR drafts: |
IFA040 | November - 2019 | Complete |
ST2-006 | Overview of management and orchestration of container cluster nodes (Clause 4)
CR drafts: |
IFA036 | March - 2020 | Open |
ST2-007 | Specify the functional requirements for the CISM function
CR drafts: |
IFA010 | January - 2020 | Complete |
ST2-008 | Specify the functional requirements for the CIR function
CR drafts: |
IFA010 | February - 2020 | Complete |
ST2-009 | General CISM service requirements (Clauses 6.1, 6.2)
CR drafts: |
IFA040 | January - 2020 | Complete |
ST2-010 | OS container management service interface requirements (Clauses 6.3, 6.4, 6.5, 6.6, 6.7)
CR drafts: |
IFA040 | January - 2020 | Complete |
ST2-011 | General CIR service requirements (Clauses 7.1, 7.2)
CR drafts: |
IFA040 | December - 2019 | Complete |
ST2-012 | OS container image management service interface requirements (Clause 7.3)
CR drafts: |
IFA040 | January - 2020 | Complete |
ST2-013 | Extend the NFVO functional requirements for consuming the management service interfaces exposed by the CISM function
CR drafts: |
IFA010 | March - 2020 | Complete |
ST2-014 | Extend the NFVO functional requirements for consuming the management service interfaces exposed by the CIR function
CR drafts: |
IFA010 | March - 2020 | Complete |
ST2-015 | Extend the VNFM functional requirements for consuming the management service interfaces exposed by the CISM function
CR drafts: |
IFA010 | March - 2020 | Complete |
ST2-016 | Enhance the information models of the Or-Vnfm interfaces for OS container management and orchestration
CR drafts: |
IFA007 | May - 2020 | Open |
ST2-017 | Enhance the information models of the Ve-Vnfm interfaces for OS container management and orchestration
CR drafts: |
IFA008 | May - 2020 | Open |
ST2-018 | Enhance the information models of the Os-Ma-nfvo interfaces for OS container management and orchestration
CR drafts: |
IFA013 | May - 2020 | Open |
FEAT17 Stage 2 - Step 2 | ||||
ST2-019 | Container cluster nodes management interface requirements (Clause 5)
CR drafts: |
IFA036 | June - 2020 | Open |
Stage 3 Implementation Plan
Items to consider in the implementation plan
- Detailed description what has to be done in which work item.
- Timeplan of when the team plans to conclude a particular action in the implementation plan.
SOL
ID | Action | Impacted WG(s) | Target completion | Status |
---|---|---|---|---|
ST3-001 | tbd | tbd | tbd | Open |
Issues
Feature implementation approach
This feature implementation plan proposes to implement the feature according to its scope from the latest NFV Release-4 “Strawman of Release 4 definition”.
Due to the complexity of the feature and its implementation, the feature will be implemented in a stepwise approach. The feature steps are bundling dependent solutions in different work items/specifications. The solutions for one feature step impacting existing specifications will be delivered by Mega-CR’s. There will be one Mega-CR per impacted specification per feature step and all Mega-CR’s for one feature step will be delivered together with dependent new specifications.
The current plan bundles the following solutions together:
- Stage 2 - Step 1: IFA040 and related Rel-4 Mega-CRs on existing specifications
- Stage 2 - Step 2: IFA036 and related Rel-4 Mega-CRs on existing specifications
Background Information
This feature was originally planned as ETSI NFV Release-3 delivery.
According to its definition, the ETSI NFV Release 3 includes objectives:
- To specify requirements and enhancements to NFV Architectural Framework to support PaaS features.
- To specify non-functional parameters to classify and characterize VNF cloud-native implementations.
They are reflected in the following two features and corresponding work items:
Feature ID | Title | Work Item |
---|---|---|
R03.F19 | NFV Architecture PaaS (NFVPAAS) | IFA029 |
R03.F20 | Cloud-Native VNF (VNFCLOUD) | EVE011 |
During the work on the two work items it was discovered that both features are very much related and the envisioned solutions and implementations might overlap and will target the same impacted work items.
During discussions in IFA#73 it was further identified that EVE011, even though it is normative, should be considered as stage 1 requirements on cloud-native on a high abstraction level without taking the actual implementation into consideration. It was further identified in this meeting that IFA029 as a GR looks at architectural aspects of both Cloud Native and PaaS.
Meanwhile, both work items, EVE011 and IFA029, have been concluded and approved by the ISG NFV plenary as NFV Release-3 deliveries. It was further decided by the ISG NFV plenary to carry over the normative specifications for stage 2 and 3 of this feature with a modified scope according to the “Strawman of Release 4 definition” into NFV Release-4.
Security Considerations
The work item DGS/NFV-SEC023 “Network Functions Virtualisation (NFV) Release 4; Security; Container Security Specification” was approved by the ISG NFV to investigate the security considerations for OS container technologies and provide a respective specification.
It is expected that applicable container security aspects will be handled by this work item.
FEAT18: Security
Overview
Feature Prime | Mark Shepherd (Tencastle) |
Feature description | To address security challenges arising in NFV, particularly in terms of isolation of sensitive functions and security management and monitoring |
Target Release | Release 3 drop X (2019-06-30) |
Impacted WIs | Active work items: IFA026, IFA033, SEC019.
Future work items: consider whether SOL or TST items would be appropriate. Existing work items: SEC009, SEC011, SEC012, SEC013. |
MegaCRs | tbd |
Related/Dependent Features | None |
Status | Ongoing (25% complete) |
Contributions | All feature contributions Agreed content (direct links to search-URLs to be added later) |
Feature team | Alex Leadbeater (Rapporteur), BT
Leslie Willis (Rapporteur), BT Mark Shepherd, Tencastle |
Last Updated | 2018-10-19 |
Implementation Plan
ID | Action | Impacted WG(s) | Target completion | Status |
---|---|---|---|---|
001 | Complete requirements in IFA026 | IFA026 | November 2018 | Open |
002 | Map requirements from IFA026 into IFA033 and assign to each interface | IFA026
IFA033 |
November 2018 | Open |
003 | Complete all of IFA026 and identify all interfaces in IFA033 | IFA026
IFA033 |
December 2018 | Open |
004 | Complete IFA033 | IFA0233 | May 2019 | Open |
Issues
List of issues raised based on the feature implementation.
Security Considerations
List of security considerations implied by the feature.
FEAT19: NFV-Conn
Overview
Feature Prime | Name, Company, E-Mail |
Feature description | Short Description of the Feature |
Target Release | Stage 2: Release 3 (2018-X-X)
Stage 3: Release 3 (2019-X-X) |
Impacted WIs | Stage 2: IFAxx, IFAyy, SOLzz
Stage 3: SOLzz |
MegaCRs | Stage 2:
IFAxxx MegaCR NFVIFA(18)000xxx (CR Status) IFAyyy MegaCR NFVIFA(18)000yyy (CR Status) Stage 3: SOLzzz MegaCR NFVSOL(19)000zzz (CR Status) |
Related/Dependent Features | FEATxx FEATyy |
New Specifcations | Stage 2: none
Stage 3: SOLaaa |
Status | Stage 2: Completed
Stage 3: Ongoing (20% completed) |
Contributions | All feature contributions Agreed content |
Feature team | Stage 2: Name (Company)
Stage 3: Name (Company) |
Last Updated | 20xx-xx-xx |
Stage 2 Implementation Plan
Items to consider in the implementation plan
- Detailed description what has to be done in which work item.
- Timeplan of when the team plans to conclude a particular action in the implementation plan.
IFA
ID | Action | Impacted WG(s) | Target completion | Status |
---|---|---|---|---|
001 | Add interface X in to IFA007. CR draft [LINK] | IFA | March-2018 | Open |
SOL
ID | Action | Impacted WG(s) | Target completion | Status |
---|---|---|---|---|
001 | Add interface X in to SOL001. CR draft [LINK] | SOL | March-2018 | Open |
Stage 3 Implementation Plan
Items to consider in the implementation plan
- Detailed description what has to be done in which work item.
- Timeplan of when the team plans to conclude a particular action in the implementation plan.
SOL
ID | Action | Impacted WG(s) | Target completion | Status |
---|---|---|---|---|
001 | Add interface X in to SOL001. CR draft [LINK] | SOL | March-2018 | Open |
Issues
List of issues raised based on the feature implementation.
Security Considerations
List of security considerations implied by the feature.
FEAT20: Auto
Overview
Feature Prime | Name, Company, E-Mail |
Feature description | Short Description of the Feature |
Target Release | Stage 2: Release 3 (2018-X-X)
Stage 3: Release 3 (2019-X-X) |
Impacted WIs | Stage 2: IFAxx, IFAyy, SOLzz
Stage 3: SOLzz |
MegaCRs | Stage 2:
IFAxxx MegaCR NFVIFA(18)000xxx (CR Status) IFAyyy MegaCR NFVIFA(18)000yyy (CR Status) Stage 3: SOLzzz MegaCR NFVSOL(19)000zzz (CR Status) |
Related/Dependent Features | FEATxx FEATyy |
New Specifcations | Stage 2: none
Stage 3: SOLaaa |
Status | Stage 2: Completed
Stage 3: Ongoing (20% completed) |
Contributions | All feature contributions Agreed content |
Feature team | Stage 2: Name (Company)
Stage 3: Name (Company) |
Last Updated | 20xx-xx-xx |
Stage 2 Implementation Plan
Items to consider in the implementation plan
- Detailed description what has to be done in which work item.
- Timeplan of when the team plans to conclude a particular action in the implementation plan.
IFA
ID | Action | Impacted WG(s) | Target completion | Status |
---|---|---|---|---|
001 | Add interface X in to IFA007. CR draft [LINK] | IFA | March-2018 | Open |
SOL
ID | Action | Impacted WG(s) | Target completion | Status |
---|---|---|---|---|
001 | Add interface X in to SOL001. CR draft [LINK] | SOL | March-2018 | Open |
Stage 3 Implementation Plan
Items to consider in the implementation plan
- Detailed description what has to be done in which work item.
- Timeplan of when the team plans to conclude a particular action in the implementation plan.
SOL
ID | Action | Impacted WG(s) | Target completion | Status |
---|---|---|---|---|
001 | Add interface X in to SOL001. CR draft [LINK] | SOL | March-2018 | Open |
Issues
List of issues raised based on the feature implementation.
Security Considerations
List of security considerations implied by the feature.
FEAT21: 5GNFV
Overview
Feature Prime | Joan Triay (DOCOMO) |
Feature description | Short Description of the Feature |
Target Release | Stage 2: Release 3 (2018-X-X)
Stage 3: Release 3 (2019-X-X) |
Impacted WIs | Stage 2: IFAxx, IFAyy, SOLzz
Stage 3: SOLzz |
MegaCRs | Stage 2:
IFAxxx MegaCR NFVIFA(18)000xxx (CR Status) IFAyyy MegaCR NFVIFA(18)000yyy (CR Status) Stage 3: SOLzzz MegaCR NFVSOL(19)000zzz (CR Status) |
Related/Dependent Features | FEATxx FEATyy |
New Specifcations | Stage 2: none
Stage 3: SOLaaa |
Status | Stage 2: Completed
Stage 3: Ongoing (20% completed) |
Contributions | All feature contributions Agreed content |
Feature team | Stage 2: Name (Company)
Stage 3: Name (Company) |
Last Updated | 20xx-xx-xx |
Stage 2 Implementation Plan
Items to consider in the implementation plan
- Detailed description what has to be done in which work item.
- Timeplan of when the team plans to conclude a particular action in the implementation plan.
IFA
ID | Action | Impacted WG(s) | Target completion | Status |
---|---|---|---|---|
001 | Add interface X in to IFA007. CR draft [LINK] | IFA | March-2018 | Open |
SOL
ID | Action | Impacted WG(s) | Target completion | Status |
---|---|---|---|---|
001 | Add interface X in to SOL001. CR draft [LINK] | SOL | March-2018 | Open |
Stage 3 Implementation Plan
Items to consider in the implementation plan
- Detailed description what has to be done in which work item.
- Timeplan of when the team plans to conclude a particular action in the implementation plan.
SOL
ID | Action | Impacted WG(s) | Target completion | Status |
---|---|---|---|---|
001 | Add interface X in to SOL001. CR draft [LINK] | SOL | March-2018 | Open |
Issues
List of issues raised based on the feature implementation.
Security Considerations
List of security considerations implied by the feature.
FEAT22: M-Tenant
Overview
Feature Prime | Ulrich Kleber, Huawei, Ulrich.kleber@huawei.com |
Feature description | Start with use cases where multiple users consume services from the same NFV-MANO environment and implement necessary enhancements in the NFV-MANO stack. |
Target Release | Stage 1: Release 4
Stage 2: Release 4 (2020-X-X) |
Impacted WIs | Stage 1: EVE018
Stage 2: tbd |
MegaCRs | Stage 2: IFAxxx MegaCR NFVIFA(18)000xxx (CR Status) IFAyyy MegaCR NFVIFA(18)000yyy (CR Status) |
Related/Dependent Features | FEATxx FEATyy |
New Specifcations | Stage 1: EVE018 Stage 2: none |
Status | Stage 1: Ongoing (20% completed)
Stage 2: Not started Stage 3: Not started |
Contributions | All feature contributions Agreed content |
Feature team | Stage 1: U.Kleber (Huawei) Stage 2: Name (Company) |
Last Updated | 2019-12-20 |
Stage 2 Implementation Plan
Items to consider in the implementation plan
- Detailed description what has to be done in which work item.
- Timeplan of when the team plans to conclude a particular action in the implementation plan.
IFA
ID | Action | Impacted WG(s) | Target completion | Status |
---|---|---|---|---|
001 | Add interface X in to IFA007. CR draft [LINK] | IFA | March-2018 | Open |
SOL
ID | Action | Impacted WG(s) | Target completion | Status |
---|---|---|---|---|
001 | Add interface X in to SOL001. CR draft [LINK] | SOL | March-2018 | Open |
Stage 3 Implementation Plan
Items to consider in the implementation plan
- Detailed description what has to be done in which work item.
- Timeplan of when the team plans to conclude a particular action in the implementation plan.
SOL
ID | Action | Impacted WG(s) | Target completion | Status |
---|---|---|---|---|
001 | Add interface X in to SOL001. CR draft [LINK] | SOL | March-2018 | Open |
Issues
List of issues raised based on the feature implementation.
Security Considerations
List of security considerations implied by the feature.
FEAT23: M-SBA
Overview
Feature Prime | Name, Company, E-Mail |
Feature description | Short Description of the Feature |
Target Release | Stage 2: Release 3 (2018-X-X)
Stage 3: Release 3 (2019-X-X) |
Impacted WIs | Stage 2: IFAxx, IFAyy, SOLzz
Stage 3: SOLzz |
MegaCRs | Stage 2:
IFAxxx MegaCR NFVIFA(18)000xxx (CR Status) IFAyyy MegaCR NFVIFA(18)000yyy (CR Status) Stage 3: SOLzzz MegaCR NFVSOL(19)000zzz (CR Status) |
Related/Dependent Features | FEATxx FEATyy |
New Specifcations | Stage 2: none
Stage 3: SOLaaa |
Status | Stage 2: Completed
Stage 3: Ongoing (20% completed) |
Contributions | All feature contributions Agreed content |
Feature team | Stage 2: Name (Company)
Stage 3: Name (Company) |
Last Updated | 20xx-xx-xx |
Stage 2 Implementation Plan
Items to consider in the implementation plan
- Detailed description what has to be done in which work item.
- Timeplan of when the team plans to conclude a particular action in the implementation plan.
IFA
ID | Action | Impacted WG(s) | Target completion | Status |
---|---|---|---|---|
001 | Add interface X in to IFA007. CR draft [LINK] | IFA | March-2018 | Open |
SOL
ID | Action | Impacted WG(s) | Target completion | Status |
---|---|---|---|---|
001 | Add interface X in to SOL001. CR draft [LINK] | SOL | March-2018 | Open |
Stage 3 Implementation Plan
Items to consider in the implementation plan
- Detailed description what has to be done in which work item.
- Timeplan of when the team plans to conclude a particular action in the implementation plan.
SOL
ID | Action | Impacted WG(s) | Target completion | Status |
---|---|---|---|---|
001 | Add interface X in to SOL001. CR draft [LINK] | SOL | March-2018 | Open |
Issues
List of issues raised based on the feature implementation.
Security Considerations
List of security considerations implied by the feature.
FEAT24: VNF-OAM
Overview
Feature Prime | Gerald Kunzmann, DOCOMO, kunzmann@docomolab-euro.com |
Feature description | This feature will analyse and define the type of OAM functions for VNFs that can be generalized and be provided as a “generic function” supporting the provisioning, connectivity, configuration and monitoring of VNFs on a virtualized platform. The feature will also determine possible solutions to realize such generic OAM functions, e.g., by leveraging PaaS capabilities. The result report will include, if necessary, recommendations for requirements and architectural enhancements. |
Target Release | Stage 2: Release 3 (May 2020)
Stage 3: Release 3 (2020-X-X) |
Impacted WIs | Stage 2: IFAxx, IFAyy
Stage 3: SOLzz |
MegaCRs | Stage 2:
EVE019 GR IFA0xx Stage 3: SOLzzz MegaCR NFVSOL(19)000zzz (CR Status) |
Related/Dependent Features | FEAT17: cloud-native VNF and NFV architecture PaaS |
New Specifcations | Stage 2: none
Stage 3: SOLaaa |
Status | Stage 2: Ongoing (10% completed)
Stage 3: Not started |
Contributions | All feature contributions Agreed content |
Feature team | Stage 2: Bertrand Souville (DOCOMO)
Stage 3: Name (Company) |
Last Updated | 2020-01-13 |
Stage 2 Implementation Plan
Items to consider in the implementation plan
- Detailed description what has to be done in which work item.
- Timeplan of when the team plans to conclude a particular action in the implementation plan.
IFA
ID | Action | Impacted WG(s) | Target completion | Status |
---|---|---|---|---|
001 | Add interface X in to IFA007. CR draft [LINK] | IFA | March-2020 | Open |
SOL
ID | Action | Impacted WG(s) | Target completion | Status |
---|---|---|---|---|
001 | Add interface X in to SOL001. CR draft [LINK] | SOL | March-2020 | Open |
Stage 3 Implementation Plan
Items to consider in the implementation plan
- Detailed description what has to be done in which work item.
- Timeplan of when the team plans to conclude a particular action in the implementation plan.
SOL
ID | Action | Impacted WG(s) | Target completion | Status |
---|---|---|---|---|
001 | Add interface X in to SOL001. CR draft [LINK] | SOL | March-2018 | Open |
Issues
List of issues raised based on the feature implementation.
Security Considerations
List of security considerations implied by the feature.
FEAT25: VNF-CI
Overview
Feature Prime | Name, Company, E-Mail |
Feature description | Short Description of the Feature |
Target Release | Stage 2: Release 3 (2018-X-X)
Stage 3: Release 3 (2019-X-X) |
Impacted WIs | Stage 2: IFAxx, IFAyy, SOLzz
Stage 3: SOLzz |
MegaCRs | Stage 2:
IFAxxx MegaCR NFVIFA(18)000xxx (CR Status) IFAyyy MegaCR NFVIFA(18)000yyy (CR Status) Stage 3: SOLzzz MegaCR NFVSOL(19)000zzz (CR Status) |
Related/Dependent Features | FEATxx FEATyy |
New Specifcations | Stage 2: none
Stage 3: SOLaaa |
Status | Stage 2: Completed
Stage 3: Ongoing (20% completed) |
Contributions | All feature contributions Agreed content |
Feature team | Stage 2: Name (Company)
Stage 3: Name (Company) |
Last Updated | 20xx-xx-xx |
Stage 2 Implementation Plan
Items to consider in the implementation plan
- Detailed description what has to be done in which work item.
- Timeplan of when the team plans to conclude a particular action in the implementation plan.
IFA
ID | Action | Impacted WG(s) | Target completion | Status |
---|---|---|---|---|
001 | Add interface X in to IFA007. CR draft [LINK] | IFA | March-2018 | Open |
SOL
ID | Action | Impacted WG(s) | Target completion | Status |
---|---|---|---|---|
001 | Add interface X in to SOL001. CR draft [LINK] | SOL | March-2018 | Open |
Stage 3 Implementation Plan
Items to consider in the implementation plan
- Detailed description what has to be done in which work item.
- Timeplan of when the team plans to conclude a particular action in the implementation plan.
SOL
ID | Action | Impacted WG(s) | Target completion | Status |
---|---|---|---|---|
001 | Add interface X in to SOL001. CR draft [LINK] | SOL | March-2018 | Open |
Issues
List of issues raised based on the feature implementation.
Security Considerations
List of security considerations implied by the feature.
ENH01: Security enhancements
This section contains an overview of small and generic security enhancements to the ETSI NFV framework and their current status.
ID | Name | Status | Contact | Descirption | Contributions |
---|---|---|---|---|---|
ENH01.xx | New security enhancement | {Proposal,Under development, Completed, Closed} | Foo Bar (ACME) <foo.bar@acme.org> | A short description of the feaure |
|
ENH02: Special technical enhancements
This section contains an overview of small and generic technical enhancements to the ETSI NFV framework and their current status.
ID | Name | Status | Contact | Description | Contributions | ||
---|---|---|---|---|---|---|---|
ENH02.01 | NFV-MANO enhancement with SDN-based networking | Under development |
|
This new enhancement proposes to enhance the NFV-MANO functionality related to virtualised network management, lifecycle management and template information model to support the integration of SDN-based network in the framework of NFV-MANO during the timeframe of Release 4.
This work suggests to specify the SDN-based network resources in the NSD and VNFD model in order to use the different type of network to provision the network connection requirements at the design time. This work also suggests to enhance Os-Ma-nfvo, Or-Vi and Or-Vnfm reference points in order to manage the lifecycle of the different type of network. |
| ||
ENH02.02 | NFV-MANO enhancement for NS feasibility check | Under development | Junichi Kawasaki <ju-kawasaki@kddi.com>, Kenichi Ogaki <ke-oogaki@kddi.com>, Cristina Badulescu <cristina.badulescu@ericsson.com>, Anatoly Andrianov <anatoly.andrianov@nokia.com>, Kleber Ulrich <Ulrich.Kleber@huawei.com> | This new enhancement proposes to add the capability of feasibility check of Network Service to the lifecycle management during the timeframe of Release 4.
This is required to support the requirements specified in step-3 of clause 5.1.21 in 3GPP TS28.531 (Management and provisioning of 5G network slicing), to check the feasibility of Network slice subnet by sending enquiry requests to MANO to determine availability of network constituents. This work suggests to enhance the Os-Ma-nfvo reference point to supporting the feasibility check of Network Service. |
| ||