Multi-vendor Distributed NFV: Difference between revisions

From NFVwiki
No edit summary
No edit summary
Line 25: Line 25:
[[media:NFVPER(14)000011__NFV_ISG_PoC_Proposal__-_Multi-vendor_Distributed_NFV.pdf |Download PDF version]]
[[media:NFVPER(14)000011__NFV_ISG_PoC_Proposal__-_Multi-vendor_Distributed_NFV.pdf |Download PDF version]]


== PoC Interim Report (10 September 2014) ==
== PoC Interim Report ==
[http://docbox.etsi.org/ISG/NFV/PER/05-CONTRIBUTIONS/2014//NFVPER(14)000099__NFV_ISG_PoC_Report_-_Multi-vendor_Distributed_NFV.docx NFVPER(14)000099__NFV_ISG_PoC_Report_-_Multi-vendor_Distributed_NFV.docx]
(10 September 2014): [http://docbox.etsi.org/ISG/NFV/PER/05-CONTRIBUTIONS/2014//NFVPER(14)000099__NFV_ISG_PoC_Report_-_Multi-vendor_Distributed_NFV.docx NFVPER(14)000099__NFV_ISG_PoC_Report_-_Multi-vendor_Distributed_NFV.docx]

Revision as of 08:34, 11 September 2014

PoC Team

CenturyLink

Certes

Cyan

Fortinet

RAD

Main Contact

Nirav J. Modi, Cyan Inc nirav.modi@cyaninc.com

PoC Demo

Big Telecom Event, June 17-18, 2014, Chicago (http://www.bigtelecomevent.com). See picture here.

SDN & OpenFlow World Congress, October 14-17, 2014, Düsseldorf (http://www.layer123.com/sdn)

PoC Proposal

Original proposal: NFVPER(14)000011__NFV_ISG_PoC_Proposal__-_Multi-vendor_Distributed_NFV.docx

Latest Update (10 September 2014): NFVPER(14)000011r1__NFV_ISG_PoC_Proposal__-_Multi-vendor_Distributed_NFV.docx

Download PDF version

PoC Interim Report

(10 September 2014): NFVPER(14)000099__NFV_ISG_PoC_Report_-_Multi-vendor_Distributed_NFV.docx