Feature Tracking
Introduction
Current mirror date: 2024.02.14 | This page is a mirror of the Feature Tracking page on the NFV private wiki. Feature tracking information is frequently updated on the private wiki page and regularly mirrored onto the present public page. Links to contributions will require authentication with an ETSI Online Account. |
Feature Overview
This page has been restructured to separate pages for each release.
Release 4 features wiki.
Feature work of Release 4 is completed and the release has entered maintenance mode.
The Release 3 feature wiki is not further maintained.
Please refer to the latest draft of the release description NFV007:
ETSI GR NFV 007: "Network Functions Virtualisation (NFV); Release Description; Release 4".
It can be downloaded here.
Release 3 features wiki.
Release 3 is completed.
The Release 3 feature wiki is not further maintained.
Please refer to the release description NFV007:
ETSI GR NFV 007 (V3.7.1): "Network Functions Virtualisation (NFV); Release Description; Release 3".
It can be downloaded here
The old wiki page (status of September 29, 2023) can still be accessd here.
Id | Feature | Release and Status |
---|---|---|
FEAT01 | NFV-MANO Upgrades | Stage 1 Completed Release 4 |
FEAT02 | VNF software modification | Completed Release 3 |
FEAT03 | NFVI software modification | Completed Release 3 |
FEAT04 | Host Reservation | Partially completed Release 3 Completed Release 4 |
FEAT05 | Network Slicing | Completed Release 3 |
FEAT06 | Enhancement Network Service (NS) Package | Part of Release 2 |
FEAT07 | MANO Policy Management (MANO_PLC) | Completed Release 3 |
FEAT08 | Support of composite NS across multi-domain (MANOMD_NS) | Completed Release 3 |
FEAT10 | Mgmt & Connectivity Multi-Site Services (MCMSS) | Partially completed Release 3 Completed Release 4 |
FEAT11 | NFV_M&M (NFV-MANO management) | Completed Release 3 |
FEAT12 | Enhancement support for MEC in NFV deployments | Completed Release 3. |
FEAT13 | Licensing | Completed Release 4 |
FEAT15 | VNF Snapshotting | Completed Release 3 |
FEAT16 | Service Availability Level | Completed Release 3 |
FEAT17 | Cloud-Native VNFs and Container Infrastructure management | Stage 1 completed Release 3 Stage 2&3 completed Release 4 |
FEAT18 | Security | Stage 2 architecture completed Release 3 Stage 2 interfaces completed Release 4, |
FEAT19a | NFV-Connect - container networking | Partly completed Release 4 Ongoing Release 5 |
FEAT19b | FEAT19b: NFV-Connect - connectivity integration and operationalization | Ongoing Release 5 |
FEAT20 | Auto | Partly completed Release 4 Ongoing Release 5 |
FEAT21 | 5GNFV | Partly completed Release 4 Ongoing Release 5 |
FEAT22 | FEAT22: M-Tenant | Stage 1 ongoing Release 5 |
FEAT23 | MANO-SBA | Ongoing Release 5 |
FEAT24 | VNF-OAM | Completed Release 4 Ongoing Release 5 |
FEAT25 | FEAT25: VNF-CI | Ongoing Release 5 |
FEAT26 | Policy-models | Partly completed Release 4 Ongoing Release 5 |
FEAT27 | NFV for vRAN | Ongoing Release 5 |
FEAT28 | Fault management models | Stage 2 completed Release 4 Ongoing Release 5 |
FEAT29 | Green NFV | Ongoing Release 5 |
FEAT30 | VNF configuration | Ongoing Release 5 |
FEAT31 | Flexible VNF deployment | Ongoing Release 5 |
FEAT32 | Reliability for cloud-native VNF | Ongoing Release 5 |
FEAT33 | Physical Infrastructure Management (PIM) | Ongoing Release 5 |
FEAT35 | Follow-up from IFA051 Open Source Analysis (Tentative) | Ongoing Release 5 |
FEAT36 | New infrastructure resources for NFV | Stage 1 started Release 6 |
FEAT37 | Latency aspects and new communication technologies for NFV | Stage 1 started Release 6 |
FEAT38 | New application virtualization forms | Stage 1 started Release 6 |
FEAT39 | Report on architectural support for NFV evolution | Stage 1 pre-analysis Release 6 |
ENH01.01 | Certificate Management | Partially completed Release 4 Ongoing Release 5 |
ENH02 | Special technical enhancements | 6 Release 4 enhancements completed None yet in Release 5 |
Introduction
Some introduction will be put here including guidelines, process description and tutorials.
- Link to Release 3 implementation process
- Link to the "consolidated IFA Release 3 Feature plan". Refer to NFVIFA(17)000914 and revisions. Latest version NFVIFA(17)000914r4
- Training for Feature Primes
- Process
- Wiki editing
- Naming conventions: e.g. FEAT00_IFA007_[Contribution name]
- To build a link to all contributions belonging to a feature, replace FEAT99 in the link stated below with the Feature short name for your feature e.g. FEAT15:
https://portal.etsi.org/Contribution.aspx?Tb_Id=789&searchText=FEAT99&IncludeSubTb=True&sort=pk_contribution&sortorder=DESC&NbItemsPerPage=50&Year=2017,2018,2019
- Note: Agreed content can be added to Pseudo meeting --> If the access is restricted, this may only work within a workgroup.
- Related/Dependent Features: Please indicate other features which relate to the ongoing work. Details can be given in the implementation plan or in the issues section.
FEATxx: Feature Title
Overview
Feature Prime | Name, Company, E-Mail |
Feature description | Short Description of the Feature |
Target Release | Stage 2: Release 3 (2018-X-X)
Stage 3: Release 3 (2019-X-X) |
Impacted WIs | Stage 2: IFAxx, IFAyy, SOLzz
Stage 3: SOLzz |
MegaCRs | Stage 2:
IFAxxx MegaCR NFVIFA(18)000xxx (CR Status) IFAyyy MegaCR NFVIFA(18)000yyy (CR Status) Stage 3: SOLzzz MegaCR NFVSOL(19)000zzz (CR Status) |
Related/Dependent Features | FEATxx FEATyy |
New Specifcations | Stage 2: none
Stage 3: SOLaaa |
Status | Stage 2: Completed
Stage 3: Ongoing (20% completed) |
Contributions | All feature contributions Agreed content |
Feature team | Stage 2: Name (Company)
Stage 3: Name (Company) |
Last Updated | 20xx-xx-xx |
Stage 2 Implementation Plan
Items to consider in the implementation plan
- Detailed description what has to be done in which work item.
- Timeplan of when the team plans to conclude a particular action in the implementation plan.
IFA
ID | Action | Impacted WG(s) | Target completion | Status |
---|---|---|---|---|
001 | Add interface X in to IFA007. CR draft [LINK] | IFA | March-2018 | Open |
SOL
ID | Action | Impacted WG(s) | Target completion | Status |
---|---|---|---|---|
001 | Add interface X in to SOL001. CR draft [LINK] | SOL | March-2018 | Open |
Stage 3 Implementation Plan
Items to consider in the implementation plan
- Detailed description what has to be done in which work item.
- Timeplan of when the team plans to conclude a particular action in the implementation plan.
SOL
ID | Action | Impacted WG(s) | Target completion | Status |
---|---|---|---|---|
001 | Add interface X in to SOL001. CR draft [LINK] | SOL | March-2018 | Open |
Issues
List of issues raised based on the feature implementation.
Security Considerations
List of security considerations implied by the feature.
Conclusion
The sections for all features are distributed to the release specific pages:
Please access Release 3 features here.
Please access Release 4 features here.
Please access Release 5 features here.
The old wiki page (status of September 29, 2023) ist saved for reference here.