Demonstration high availability vEPC and SDN controlled Service Chain: Difference between revisions
No edit summary |
No edit summary |
||
(One intermediate revision by the same user not shown) | |||
Line 20: | Line 20: | ||
== PoC Proposal == | == PoC Proposal == | ||
[https://docbox.etsi.org/ISG/NFV/TST/05-CONTRIBUTIONS/2015/NFVTST(15)000067r2_NFV_ISG_PoC_Proposal_Demonstration_high_availability_vEPC_an.docx NFVTST(15)000067r2_NFV_ISG_PoC_Proposal_Demonstration_high_availability_vEPC_an.docx] | [https://docbox.etsi.org/ISG/NFV/TST/05-CONTRIBUTIONS/2015/NFVTST(15)000067r2_NFV_ISG_PoC_Proposal_Demonstration_high_availability_vEPC_an.docx NFVTST(15)000067r2_NFV_ISG_PoC_Proposal_Demonstration_high_availability_vEPC_an.docx] | ||
[[media:NFVTST(15)000067r2_NFV_ISG_PoC_Proposal_Demonstration_high_availability_vEPC_an.pdf | Download PDF version]] | |||
== PoC Report == | == PoC Report == | ||
Final PoC Report (01/12/2015): [https://docbox.etsi.org/ISG/NFV/TST/05-CONTRIBUTIONS/2015/NFVTST(15)000152_Final_Report_PoC_37_Demonstration_High_Availability_vEPC_and.docx NFVTST(15)000152_Final_Report_PoC_37_Demonstration_High_Availability_vEPC_and.docx] | Final PoC Report (01/12/2015): [https://docbox.etsi.org/ISG/NFV/TST/05-CONTRIBUTIONS/2015/NFVTST(15)000152_Final_Report_PoC_37_Demonstration_High_Availability_vEPC_and.docx NFVTST(15)000152_Final_Report_PoC_37_Demonstration_High_Availability_vEPC_and.docx] | ||
[[media:Final_Report_of_PoC_37_Demonstration_high_availability_vEPC_and_SDN_controlled_Service_Chain.pdf | Download PDF version]] |
Latest revision as of 10:28, 2 December 2015
PoC Team
China Telecom
Huawei
HP
Trend
Intel
Main Contact
Xu Yang, HUAWEI yangxu5@huawei.com
PoC Demo
The PoC is hosted in the Network and Terminal Laboratory of China Telecom in GuangZhou China, and can be accessed remotely from any location with reliable internet service.
Webinar: 20 November 2015, 9am CET. Download Slides
PoC Proposal
NFVTST(15)000067r2_NFV_ISG_PoC_Proposal_Demonstration_high_availability_vEPC_an.docx
PoC Report
Final PoC Report (01/12/2015): NFVTST(15)000152_Final_Report_PoC_37_Demonstration_High_Availability_vEPC_and.docx