Demonstration of High Reliability and Availability aspects in a Multivendor NFV Environment: Difference between revisions

From NFVwiki
(Created page with "== PoC Team == AT&T KDDI R&D Laboratories Brocade Hewlett Packard Wind River System == Main Contact == Yue Chen, Brocade [mailto:cheny@BROCADE.COM cheny@BROCADE.COM] ...")
 
No edit summary
 
(2 intermediate revisions by the same user not shown)
Line 20: Line 20:
2014 Intel Developers Forum, San Francisco, September 9-11, 2014
2014 Intel Developers Forum, San Francisco, September 9-11, 2014


2014 SDN & OpenFlow World Congress, Dusseldorf, October 14th, 2014.
'''[http://www.etsi.org/nfv-poc-zone ETSI NFV PoC ZONE @ SDN & OpenFlow World Congress], 15-17 October 2014, Dusseldorf, Germany'''


== PoC Proposal ==
== PoC Proposal ==
[http://docbox.etsi.org/ISG/NFV/PER/05-CONTRIBUTIONS/2014/NFVPER(14)000070r4_Demonstration_of_High_Reliability_and_Availability_aspects_i.doc NFVPER(14)000070r4_Demonstration_of_High_Reliability_and_Availability_aspects_i.doc]
[http://docbox.etsi.org/ISG/NFV/Closed_WGs/PER/05-CONTRIBUTIONS/2014/NFVPER(14)000070r4_Demonstration_of_High_Reliability_and_Availability_aspects_i.doc NFVPER(14)000070r4_Demonstration_of_High_Reliability_and_Availability_aspects_i.doc]
 
== PoC Report ==
PoC Final Report (12/11/2014): [http://docbox.etsi.org/ISG/NFV/Closed_WGs/PER/05-CONTRIBUTIONS/2014/NFVPER(14)000070r5_Demonstration_of_High_Reliability_and_Availability_aspects_i.doc NFVPER(14)000070r5_Demonstration_of_High_Reliability_and_Availability_aspects_i.doc]

Latest revision as of 16:30, 14 January 2015

PoC Team

AT&T

KDDI R&D Laboratories

Brocade

Hewlett Packard

Wind River System

Main Contact

Yue Chen, Brocade cheny@BROCADE.COM

PoC Demo

Light Reading’s Big Telecom Event held in Chicago, Illinois, on June 17th and 18th, 2014. The PoC was on display at the Wind River booth at the event.

2014 Intel Developers Forum, San Francisco, September 9-11, 2014

ETSI NFV PoC ZONE @ SDN & OpenFlow World Congress, 15-17 October 2014, Dusseldorf, Germany

PoC Proposal

NFVPER(14)000070r4_Demonstration_of_High_Reliability_and_Availability_aspects_i.doc

PoC Report

PoC Final Report (12/11/2014): NFVPER(14)000070r5_Demonstration_of_High_Reliability_and_Availability_aspects_i.doc