Operational Efficiency in NFV Capacity Planning, Provisioning and Billing: Difference between revisions
(Created page with "== PoC Team == BT MetraTech Corp Huawei == Main Contact == Sean Chen, Huawei [mailto:s.chen@HUAWEI.COM s.chen@HUAWEI.COM] == PoC Demo == Huawei NFV lab, Santa Clara (CA)...") |
|||
(2 intermediate revisions by the same user not shown) | |||
Line 13: | Line 13: | ||
== PoC Proposal == | == PoC Proposal == | ||
[http://docbox.etsi.org/ISG/NFV/PER/05-CONTRIBUTIONS/2014/NFVPER(14)000061r2___NFV_ISG_PoC_Proposal__Operational_Efficiency_in_NFV_Capaci.docx NFVPER(14)000061r2___NFV_ISG_PoC_Proposal__Operational_Efficiency_in_NFV_Capaci.docx] | [http://docbox.etsi.org/ISG/NFV/Closed_WGs/PER/05-CONTRIBUTIONS/2014/NFVPER(14)000061r2___NFV_ISG_PoC_Proposal__Operational_Efficiency_in_NFV_Capaci.docx NFVPER(14)000061r2___NFV_ISG_PoC_Proposal__Operational_Efficiency_in_NFV_Capaci.docx] | ||
== PoC Withdrawn == | |||
This PoC Proposal was withdrawn on 22/01/2016 due to changes in the PoC Team |
Latest revision as of 12:58, 15 February 2016
PoC Team
BT
MetraTech Corp
Huawei
Main Contact
Sean Chen, Huawei s.chen@HUAWEI.COM
PoC Demo
Huawei NFV lab, Santa Clara (CA), USA
PoC Proposal
NFVPER(14)000061r2___NFV_ISG_PoC_Proposal__Operational_Efficiency_in_NFV_Capaci.docx
PoC Withdrawn
This PoC Proposal was withdrawn on 22/01/2016 due to changes in the PoC Team