Operational Efficiency in NFV Capacity Planning, Provisioning and Billing: Difference between revisions
No edit summary |
No edit summary |
||
Line 14: | Line 14: | ||
== PoC Proposal == | == PoC Proposal == | ||
[http://docbox.etsi.org/ISG/NFV/Closed_WGs/PER/05-CONTRIBUTIONS/2014/NFVPER(14)000061r2___NFV_ISG_PoC_Proposal__Operational_Efficiency_in_NFV_Capaci.docx NFVPER(14)000061r2___NFV_ISG_PoC_Proposal__Operational_Efficiency_in_NFV_Capaci.docx] | [http://docbox.etsi.org/ISG/NFV/Closed_WGs/PER/05-CONTRIBUTIONS/2014/NFVPER(14)000061r2___NFV_ISG_PoC_Proposal__Operational_Efficiency_in_NFV_Capaci.docx NFVPER(14)000061r2___NFV_ISG_PoC_Proposal__Operational_Efficiency_in_NFV_Capaci.docx] | ||
== PoC Withdrawn == | |||
This PoC Proposal was withdrawn due to changes in the PoC Team |
Revision as of 12:57, 15 February 2016
PoC Team
BT
MetraTech Corp
Huawei
Main Contact
Sean Chen, Huawei s.chen@HUAWEI.COM
PoC Demo
Huawei NFV lab, Santa Clara (CA), USA
PoC Proposal
NFVPER(14)000061r2___NFV_ISG_PoC_Proposal__Operational_Efficiency_in_NFV_Capaci.docx
PoC Withdrawn
This PoC Proposal was withdrawn due to changes in the PoC Team