PoC Framework: Difference between revisions
No edit summary |
|||
Line 6: | Line 6: | ||
[http://www.etsi.org/technologies-clusters/technologies/nfv/nfv-poc Learn more about NFV ISG PoCs] | [http://www.etsi.org/technologies-clusters/technologies/nfv/nfv-poc Learn more about NFV ISG PoCs] | ||
= Framework Document = | == PoC Framework Document == | ||
The PoC Framework document can be downloaded at: | The PoC Framework document can be downloaded at: | ||
Line 15: | Line 15: | ||
You'll find the templates for PoC Proposals and PoC Reports at the end of those documents. | You'll find the templates for PoC Proposals and PoC Reports at the end of those documents. | ||
= Templates = | == Templates == | ||
[[Media:PoC_proposal_template.doc | PoC Proposal Template (word)]] | [[Media:PoC_proposal_template.doc | PoC Proposal Template (word)]] | ||
[[Media:PoC_report_template.doc | PoC Report Template (word)]] | [[Media:PoC_report_template.doc | PoC Report Template (word)]] | ||
== HOT Topics == | |||
The NFV ISG builds and maintains a list of '''HOT Topics for which very specific feedback is requested from the PoC Projects''', learn more at [Hot Topics] | |||
= ETSI CTI Support = | = ETSI CTI Support = |
Revision as of 02:29, 19 May 2015
NFV ISG PoCs
NFV ISG has developed an NFV PoC Framework to coordinate and promote multi-vendor Proofs of Concept illustrating key aspects of NFV ISG work.
PoC Framework Document
The PoC Framework document can be downloaded at:
NFV-PER002-PoC Framework - pdf version.
NFV-PER002-PoC Framework - Word version.
You'll find the templates for PoC Proposals and PoC Reports at the end of those documents.
Templates
HOT Topics
The NFV ISG builds and maintains a list of HOT Topics for which very specific feedback is requested from the PoC Projects, learn more at [Hot Topics]
ETSI CTI Support
The ETSI Center for Testing and Interoperability (CTI) has experience in supporting the organization of technology evaluations and interoperability events (in many ways similar to PoCs).
This experience may be useful to assist the PoC teams with test expertise, administration and project management support.
NFV ISG PoC Teams may request CTI assistance by contacting ETSI CTI.
About NFV ISG
Learn more about NFV at ETSI